Partnership / Delivery Models Model 1 Single project = single operation Operation Project 1. Start Date 3. Long term result 2. Leaving date + 4 weeks Long Term Results Outputs Immediate Results…… 6 months after leaving
Model 2: Pathway supported via multiple projects within a single operation Planned Trajectory / Pathway Operation = Projects 1,2,3 (or more ) Project 3 Project 2 Project 1 Project 1 + 4 weeks 6 months Start Date Leaving Date +4 Weeks Outputs Immediate Results Long Term Result
Model 3: Progression between 2 operations Operation 1 Operation 2 Op 1 Start Date Op 1 (6 Mths) Op1 Leaving Date Op1 Outputs OP1 Immediate Results OP1 Long Term Results OP2 Start Date OP2 (6 Mths) ) OP2 Leaving Date OP2 IOP2 OP2 Long Outputs Immediate term results results
Model 4: Multiple operations “at the same time” Operation 1 Operation 2 Operation 3 Operation 4 Start date Leaving date 6 months after leaving Outputs x 4 immediate results x4???? Long term results x4??????
Recommend
More recommend