Overview of Program PROGRAM ITEMS: Large space: New Gym Existing gym size for large middle schools is inadequate for assembly and lacks a stage or platform. The basketball court in inadequate size and there are no bleachers for spectators.


  1. Overview of Program PROGRAM ITEMS: Large space: New Gym – Existing gym size for large middle schools is inadequate for assembly and lacks a stage or platform. The basketball court in inadequate size and there are no bleachers for spectators. Required to be big enough for community to gather (500 people) Dining room – to replace room lost to fire – could be a multi‐purpose room; Kitchen – to replace room lost to fire – updated for Nutrition Services; includes serving line Classrooms : to serve enrichment courses, to allow school to grow to 550 students; many existing classes are on the small size; Parking : good for substitutes, good for teachers; Synthetic Turf Field : OUSD is providing turf fields at Middle Schools. Intended to be a multi‐purpose field. Drop Off/Pick up : Currently Miles Ave is fairly congested with cars at beginning and end of school QUALATITIVE ITEMS : Campus vision – school identity could be improved with better wayfinding/connection between east and west sides of campus; Community – value for facilities that can be shared with neighbors April 21, 2016 CLAREMONT MIDDLE SCHOOL 1

  2. Overview of Program EXISTING DINING 2,210 SF EXISTING GYM 3,913 SF

  3. Cafeteria 3150/15 SF per person = 210 students at cafeteria tables Reconstruction option 3150/7 SF per person = 450 people chairs (not pursued) Dining room – Existing – 2,210 Square Feet Proposed in reconstruction – 3,150 Square Feet Proposed in Gym Conversion – 3913 Square Feet 19 tables shown x 12 seats = 228 seats 3913/15 SF per person =260 students at cafeteria tables Gym conversion option 3913/7 SF per person= 559 people chairs

  4. Cafeteria / Auditorium PROS – BOTH LOCKER ROOMS CLOSE TO GYM 830 SF KITCHEN SQUARE FOOTAGE IN LINE WITH KITCHEN DISTRICT STANDARDS 1,300 SF CONS – BOYS TOILETS ARE 750 SF REMOTE FROM BOYS LOCKER ROOM PROXIMITY OF LOCKER ROOMS TO EACH OTHER REQUIRES MORE SUPERVISION PROS – BOYS AND GIRL LOCKER ROOMS SEPARATED 616 SF 830 SF COSTS MINIMIZED FOR BOYS LOCKER ROOM CONS – ONE LOCKER ROOM 750 RELATIVELY REMOTE SF FROM NEW GYM KITCHEN SQUARE FOOTAGE VERY CONSTRAINED

  5. New Gym Building options Budget Considerations ALL OF THE ADJACENT PLANS ARE MORE THAN THE $3 MILLION BUDGET; 6,000 SF X $500 SF = $3 MILLION Alignment with Budget Strategies REDUCE WIDTH OF AISLES MINIMIZE SQUARE FOOTAGE OF OFFICE AND RESTROOMS ELIMINATE BLEACHERS ELIMINATE STAGE REDUCE NUMBER OF WINDOWS LIMITED FINISH SELECTIONS ELIMINATE SCOREBOARDS REDUCE AREA OF BASKETBALL COURT – SO THAT IT IS NO LONGER REGULATION HIGH SCHOOL SIZE 50X84, BUT BECOMES 50X80.

  6. New Gym Location Options CONCEPT BUDGET $5.56 MILLION NEW GYM BUILDING $3.00 MILLION RENOVATED EXG GYM BUILDING LOCKERS (+/‐ 1588 SF X $421) $665K KITCHEN (+/‐ $700/SF) $900K SPRINKLERS $100K MISC (PAINT/DOORS, ETC $30/SF) $175K $1.84 MILLION SITE IMPROVEMENTS PARKING LOT & DRIVEWAYS $170K TO $260K SITE UTILITIES $200K NEW ASPHALT $100K DEMO CAFETERIA (4956 SF) $100K DEMO EXISTING BUNGALOWS (3226 SF) $64K DEMO MISC $.724 MILLION SYNTHETIC TURF FIELD DIFFERENT FUNDING SO NOT TAKEN OUT OF CURRENT BUDGET

  7. DESIGN OPTIONS PROS AND CONS: (+) MORE OPEN SPACE FOR PLAYGROUND (‐) DISTANCE OF GYM FROM CLASSROOMS (+) SOME RELIEF POSSIBLE ON MILES AVE DROP OFF/PICK UP (‐) LESS PARKING FOR STAFF (+) ECONOMICAL PARKING LOT ARRANGEMENT 7

  8. DESIGN OPTIONS PROS AND CONS: (+) GYM CLOSE TO CLASSROOMS (‐) LESS OPEN SPACE FOR GENERAL PLAYGOUND (+) MAXIMIZES PARKING SPACES AND IF LONG TERM, THEN OUT OF THE WAY (‐) AMOUNT OF SQUARE FOOTAGE GIVEN TO DRIVEWAYS (‐) KITCHEN IS REMOTE FROM CLASSROOMS