Re liab le Quality Po we r fo r ENHANCED GEOTHERM AL SYSTEM S ENHANCED GEOTHERM AL SYSTEM S PROJECTS AND CHALENGES PROJECTS AND CHALENGES STRASBOURG 2006 STRASBOURG 2006 ORMAT Time, the only true test of reliability AJM Oct 2004
1982-2006 : ORMAT’S WORLDWIDE GREEN ENERGY FROM 250 KW MODULE TO 125 MW POWER PLANTS T a raw e ra , N e w Z e a la n d T a raw e ra , N e w Z e a la n d 2 0 0 0 6 0 M W G e o t h e r m a l P o w e r P la n t a t M o k a i , N E W Z E A L A N D 2 .6 M W p la n t c o m p ris in g o f tw o O E C u n its ( 1 9 8 9 ) 1 7 3 1 1 0 5 3 800 700 600 500 400 300 200 100 0 1983 1985 1987 1989 1991 1993 1995 1997 1999 2001 2003 2005
ORMAT’s GREEN POWER PLANTS Accumulated installed generating capacity 1400 MW 1200 1000 2000 800 600 60 MW Geothermal Power Plant at Mokai, NEW ZEALAND 400 1731 200 0 1983 1985 1987 1989 1991 1993 1995 1997 1999 2001 2003 2005 2007
Global Presence Meeting the Needs of Customers in 71 Countries Recovered Energy Generation (REG) Power Plants Geothermal Power Plants Remote Power Units Symbols indicate type of equipment installed in each country
Company Profile Main Areas of Activities Recovered Energy Generation Recovered Energy Generation Geothermal Power Plants Gas Compressors on Pipelines Cement Plants Recovered Energy Generation Remote Power Units from Industrial Processes
How Did We Get Here ? TOTAL INVESTMENT IN R&D: MORE THAN US$100M Developer , Owner and Operator Sales $ Million Geothermal IPP 150 Geothermal EPC and BOP 125 Geothermal power units 100 Technology and large 75 solar Technology and small 50 units BOP & Waste Heat 25 Small units & D/G 0 1970 1980 1990 2000 1882
2006 : 150 MW IN CONSTRUCTION 4.6 MW Enagas Spain • 2.9 MW Geox ,Germany • 15MW Desert Peak II, USA • 6 MW Goulds, USA • 10 MW Galena, USA • 10 MW Ormesa, USA • 3 MW Heber USA • 5 MW Steamboat, USA • 10 MW Imperial Valey,USA • 6.9 MW Denizli Turkey • 6.9 MW Mokai 1A, NZ • 5 MW Momotombo, Nicaragua • 8 MW Hawaii, USA and • 100 MW additional installations • Construction of Mokai II 45 MW ( 2004)
MOKAI 100 MW GEOTHERMAL POWER PLANT 100 MW air cooled geothermal power plant, operating from steam and brine at 17 bara / 204 o C and 100% geothermal fluid reinjection
Wairakei power station
WAIRAKEI GEOTHERMALBINARY PROJECT SUMMARY OF TECHNICAL DATA Heating media Brine from the 1st flash – Temperature 127º C – Flow 2800 T/ Hr Cooling media ambient air – design temperature 11º C Output – Net system output 16.6 MW – Generated Gwhr in the 1’st year 139,6 Gwhr – Availability 1’st year 96 %
1.5 – – 25 25 MW AIR COOLED ORMAT ENERGY CONVERTER MW AIR COOLED ORMAT ENERGY CONVERTER 1.5 Feed Pump Collector Purge System Diffuser Recuperator Turbine L.P. Generator Condensate Turbine H.P. Tank & Pump Vaporizer Preheater 1537
Ormat Energy Converter 20 MW WAIRAKEI NEW ZEALAND
THE PHILOSOPHY ( 1982) 1061
PUNA 30 MW COMBINED CYCLE GEOTHERMAL POWER PLANT
1999 24 MW GEOTHERMAL POWER PLANT ZUNIL, GUATEMALA 1730
35 MW ROTOKAWA POWER PLANT • 35 MW air cooled geothermal cycle power plant, operating with steam and brine at 27 bara / 225 o C • 100% geothermal fluid reinjection • Built as a turnkey EPC for Rotokawa Generation Ltd. 1251
OLKARIA GEOTHERMAL III
17 MW MIRAVALLES GEOTHERMAL
GEOTHERMAL DRILLING
GEOTHERMAL WATER PUMPING
ORMAT’s EXECUTED PROJECTS HEATING MEDIA Temperature: 80….225º C • • Hot water • Steam • Pressure : 1……27 bar (a) • Hot oils • Temperature: 80….280º C COOLING MEDIA • Ambient air -30……. +40º C • Water • • 5……….35º C
125 MW UPPER MAHIAO - THE PHILIPPINES Distributed Renewable Grid Connected Base Load Power 1189
250kW AIR COOLED CHP PLANT ORMAT ENERGY CONVERTER
Organic Vapor Turbine Assembly MANUFACTURING 1658
Heat Exchangers Workshop MANUFACTURING 1658
HATSHOBARU Kyushu Electric, Japan 2 MW ORMAT ENERGY CONVERTER
HATCHOBARU (Kyushu Electric, Japan), 2003 HATCHOBARU (Kyushu Electric, Japan), 2003 2 MW AIR COOLED ORMAT ENERGY CONVERTER
AVAILABILITY OF INDIVIDUAL Ormat Energy Converters Power Plant Commissioning Number Availability Year of OEC’s Steamboat 1986 9 96.7 % Ormesa II 1987 20 99.1 % TOI 1989 2 98.5 % Puna 1993 10 96.7 % Heber 1993 12 98.1 % Rotokawa I 1997 3 98.6 % Ngawha 1998 2 98. 8 % HZ -Lengfurt 1999 1 98.7 % Mokai I 2000 6 98.2 % Rogner 2000 1 99.1 % Mokai II 2005 3 97.6 % Wairakei 2005 2 97.5 %
Mokai 100 MW PERFORMANCE MW 110 105 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06 Apr-06 Data : Courtesy of Tuaropaki Power Company
DECENTRALIZED PRIVATE POWER GENERATION
ORMAT’S POWER PLANT ADVANTAGES • It is a tool capable to easily accommodate changes in reservoir enthalpy and operating conditions such as temperature and pressure • Modular development, additional units may be added later and single units can be moved to other sites. Air cooling enabling 100 % reinjection of the geothermal • fluid Track record for sustaining the pressure and temperature in • the reservoir and avoiding subsidence • Simple to operate and maintain • Very high availability and low cost maintenance projects Know how capability and knowledge incorporating 40 years • of experience in manufacturing ORC based power generations systems.
End End Hile Hile l L e l L e gm gm ann, ann, M arke M arke ting M anage ting M anage r r Orm Orm at I ndustrie at I ndustrie s L td s L td
Recommend
More recommend