or
play

or https://www.youtube.com/watch?v=03QLivaG_jE Major activities in - PowerPoint PPT Presentation

Hydrographic Surveying and S-100 standards for competitive shipping Video file (large 200+ Mb) or https://www.youtube.com/watch?v=03QLivaG_jE Major activities in FAMOS (Finalising Surveys for the Baltic Motorways of the Sea)


  1. Hydrographic Surveying and S-100 standards for competitive shipping Video file (large 200+ Mb) or… https://www.youtube.com/watch?v=03QLivaG_jE

  2. Major activities in FAMOS (Finalising Surveys for the Baltic Motorways of the Sea) •Hydrographic Surveys •Improving vessel navigation for the future •Improving surveying infrastructure •Data workflow from sounding to bridge •15 partners from 7 nations participating

  3. Hydrographic Surveys in FAMOS project

  4. Safety Previously 13,2 m New shoal 8,7 m

  5. Fuel Efficiency

  6. Accuracy of vertical positioning ? How does that relate to UKC and soundings? Accuracy

  7. FAMOS act 2: Improving vessel navigation for the future •A future-proof geodetic chart datum •Gravimetry Measurements •Geoid computations •Mean Sea Surface modeling and water level control •Shipborne GNSS for precision navigation at sea

  8. Accuracy 3D navigation ( x , y, z ) ( x , y, z ) UKC! “Under Keel Clearance aware navigation”

  9. Major activities in STM (Sea Traffic Management) •Port Collaborative Decision Making •Voyage Management Test Beds •Maritime Simulator Network Test Bed •Maritime Service Infrastructure •39 partners from 13 nations participating

  10. The EU support for STM 2013 - 2010 - 2016 - 2015 2012 2018 BUDGET: 60+ Partners 71 M Euro 13 Countries

  11. Project Setup Deployment / Improved Performance STM Services Targets Development (Environment, Safety, Efficiency) 2018-2030 • Legal • Business Activity 5 • Formal Safety • Operational Analysis and Evaluation Assessment Activity 3 Activity 2 STM Activity 1 Maritime Simulator Voyage Management Validation Port CDM Test beds Network Test bed Test beds Project 2015-2018 Activity 4 SeaSWIM Maritime Cloud Maritime Service Infrastructure Desired effects STM concept(s) Service definitions 2013-2015 Measurement system

  12. Information From To Info 1 Info 2 Info 3 Etc… Port A Port B Port A Port B

  13. Communication From To System Wide Information Mgmt point-to-point (SWIM)

  14. HSSC is invited to…. • Note the paper and presentation • Consider if a presentation on these topics could be a contribution to upcoming IHO Assembly representing some aspects of and promoting the work of HSSC. • If relevant, give any advice on the content

  15. Thankyou !! • More information at www.famosproject.eu and www.stmvalidation.eu

Recommend


More recommend