oklahoma wind energy oklahoma wind energy conference
play

Oklahoma Wind Energy Oklahoma Wind Energy Conference Conference - PowerPoint PPT Presentation

Oklahoma Wind Energy Oklahoma Wind Energy Conference Conference Conference Conference Oklahoma City Oklahoma City, Oklahoma , Oklahoma December 2, December 2, 2008 2008 First Year Average LIP First Year Average LIP G G Grap raphi h


  1. Oklahoma Wind Energy Oklahoma Wind Energy Conference Conference Conference Conference Oklahoma City Oklahoma City, Oklahoma , Oklahoma December 2, December 2, 2008 2008

  2. First Year Average LIP First Year Average LIP G G Grap raphi h hi hica call ll lly www.spp.org 3

  3. Reliability Economic EHV Base Plan Funding Balanced Portfolio 33% / 67% Postage Stamp Postage Stamp C it Criteria or i Benefits / Cost ≥ 1 B fit / C t ≥ 1 Designated Resource Transmission 345 kV and above 765 kV 2005 Accepted on 10/16/08 Work in Progress SPP.org 4

  4. Axtell Iatan Portfolio Portfolio Portfolio Portfolio 3, w / SKA 3, w / SKA 3, w / SKA 3, w / SKA Knoll Nashua Swissvale – Stilwel Tap Spearville Comanche Co Chesapeake Sooner Cleveland Woodward Potter Ft S Ft. Smith/VBI ith/VBI Anadarko XF Pittsburg Tolk Tuco El Dorado Longwood Longwood Draft Substa Substation Upg tion Upgrade ade www.spp.org New 345 kV T New 345 kV Transmission ansmission Cir Circuit cuit New New 765 kV T 765 kV Transmission ansmission Cir Circuit cuit

  5. Axtell Iatan Portfolio Portfolio Portfolio Portfolio 3 3- 3- -A -A A Knoll Nashua Summit Summit Swissvale – Stilwel Tap Reno Co Spearville Wichita Chesapeake Sooner Cleveland Potter Muskogee Seminole Anadarko XF Tolk El Dorado Longwood Longwood Draft Substa Substation Upg tion Upgrade ade www.spp.org New New 345 kV T 345 kV Transmission ansmission Cir Circuit cuit New New 765 kV T 765 kV Transmission ansmission Cir Circuit cuit

  6. www.spp.org 7

  7. Economics of Economics of EHV Overlay Economics of Economics of EHV Overlay EHV Overlay - EHV Overlay - Requirements Requirements The EHV Overlay study must, at a minimum consider – Load Forecasts • Fuel Prices • Environmental Regulations • Renewable Portfolio Standards (RPS) • www.spp.org

  8. Concerns Concerns A R li bili A. Reliability B. Planning C. Unintended Consequences D Seams Agreements D. Seams Agreements E. Third Party Impacts F. Policy SPP.org 9

  9. Immediate National Immediate National Leadership Leadership Mandating: Mandating: � A b � A broad portfolio approach to electric d tf li h t l t i generation resources to meet demand & reduce emissions � Federal siting and cost allocation for the 500 kV and above bulk electric transmission needed to deliver remote renewables and baseload generation � Si � Significant research, development and ifi t h d l t d demonstration of carbon capture & storage, renewables, and efficiency and demand response technologies SPP.org

  10. Based on Tw o Transmission Ow ner’s Based on Tw o Transmiss on Ow ner’s Data Data $100 Million in economic upgrades for 345 kV pg • transmission lines would only increase residential customer cost by $ 0.09 or 0.1% per month (based on 1033 kW-hr) ( ) $ 100 Million in economic upgrades for 345 kV • t transmission lines would only increase i i li ld l i residential Customer cost by $ 0.08 or 0.1% per month (based on 1000 kW-hr) SPP.org

  11. 12 can of coke a month.” coke a month.” SPP.org “A can of “A

  12. Les Dillahunty Vice President, Regulatory Policy Vice President, Regulatory Policy 501-614-3215 ldillahunty@ spp.org

Recommend


More recommend