notice
play

Notice Subject: Final Year Project Proposal Presentations 2k9 1. It - PDF document

Phone: Office (0543) 602003 Fax (0543) 541366 Email Address (info_chakwal_campus@uettaxila.edu.pk) UNIVERSITY OF ENGINEERING AND TECHNOLOGY TAXILA 47050 Sub-Campus Chakwal Sub Campus Chakwal Dated: 08-10-2012 Notice Subject: Final Year


  1. Phone: Office (0543) 602003 Fax (0543) 541366 Email Address (info_chakwal_campus@uettaxila.edu.pk) UNIVERSITY OF ENGINEERING AND TECHNOLOGY TAXILA 47050 Sub-Campus Chakwal Sub ‐ Campus Chakwal Dated: 08-10-2012 Notice Subject: Final Year Project Proposal Presentations 2k9 1. It is hereby informed to the students of 2k9 session that Final Year Project Proposal presentations are scheduled on 10 ‐ Oct ‐ 2012(Wednesday). 2. Details of time schedule for presentation of each group have been uploaded on FYP CMS (also displayed on ECT Notice Board). 3. Each project group will present the proposed project in the meeting of board of undergraduate studies (BoUGS) and start working on approved project from BoUGS. No change in approved project will be allowed. 4. Each group will have 15 minutes for Presentation. 5. Any group unable to satisfy the faculty/BoUGS can be suggested to change/modify the project. 6. This presentation carries 20% marks for FYP Evaluation in 7 th Semester. 7. The grading criteria for FYP Evaluation is given below: Evaluation Body Marks BoUGS (Including all faculty members) for 1st presentation (5 th week of 7 th 20% and 8 th Semester ) BoUGS (Including all faculty members) for 2nd presentation (14 th week of 7 th 30% and 8 th Semester) Concerned Research Group 50% In case of any confusion, students may contact FYP office. Engr. Haq Nawaz (FYP Coordinator)

  2. Project Proposal Presentations Schedule Presentation Date: 10 ‐ Oct ‐ 2012 Venue: Chairman ECT Office Project Title/Name Sr. Project supervisor No. of Student Student Name Timings No Students Reg. No. Electronics Group 1. 09 ‐ ECT ‐ 21 MUHAMMAD ARSALAN Engr. Faisal Masood 10:00 ‐ 10:15am Analysis of Rectenna System and 03 09 ‐ ECT ‐ 23 RAHEEL AHMED Implementation of its Prototype 09 ‐ ECT ‐ 46 M. USAMA PIRZADA 2. 09 ‐ ECT ‐ 30 MUHAMMAD TALHA 10:15 ‐ 10:30am Design and Implementation of Engr. Faisal Masood 03 09 ‐ ECT ‐ 38 SAAD NAJAF KHAN Unmanned Aerial Vehicles (UAVs) 09 ‐ ECT ‐ 52 NAVEED SHAHRAIZ 3. 09 ‐ ECT ‐ 28 M. USMAN SALEEM 10:30 ‐ 10:45am Implementation of Reactive Jammer Engr. Ahmad Umar 03 09 ‐ ECT ‐ 43 HASSAN BIN QASIM Niazi for RCIED 09 ‐ ECT ‐ 45 M. WAQAS QADIR 4. Implementation of RF Detector for 09 ‐ ECT ‐ 10 MUTEE UR RAHMAN 10:45 ‐ 11:00am frequency and Radiation levels Engr. Ahmad Umar 02 09 ‐ ECT ‐ 14 GUL HAMEED KHAN Niazi detection 5. 09 ‐ ECT ‐ 26 AMJAD HUSSAIN 11:00 ‐ 11:15am Design and Implementation of Dual Engr. Ahmad Umar 03 09 ‐ ECT ‐ 39 HAMMAD ASLAM Niazi Band GSM Jammer 09 ‐ ECT ‐ 41 HASSAN ZAFAR 6. Wind Turbine Power Generation 09 ‐ ECT ‐ 19 UMAR FAROOQ 11:15 ‐ 11:30am System Engr. Faisal Masood 03 09 ‐ ECT ‐ 34 SHAHBAZ TANVEER 09 ‐ ECT ‐ 37 MAZHAR ABBAS 7. Solar Panel Auto-tracking System Engr. Faisal Masood 01 09 ‐ ECT ‐ 51 MAZHAR IQBAL 11:30 ‐ 11:45am Electronic Communication Engineering Group 09 ‐ ECT ‐ 44 MUHAMMAD MAJID Design and Implementation of Engr. Haq Nawaz 1 Implementation of Unmanned 03 11:45 am ‐ 09 ‐ ECT ‐ 49 MUHAMMAD ABID IQBAL Ground Vehicle for Survellence 12:00pm 09 ‐ ECT ‐ 50 HAFIZ M. ABBAS Implementation of Wireless sound 09 ‐ ECT ‐ 27 AQSA AHMAD Engr. Haq Nawaz 12:00 ‐ 12:15pm system 2 02 09 ‐ ECT ‐ 47 AROOBA SUNDAS 09 ‐ ECT ‐ 13 FAHEEM ABBAS Engr. Haq Nawaz 12:15 ‐ 12:30pm Implementation of Digital Exchange 3 03 09 ‐ ECT ‐ 17 MUHAMMAD MUSTAJAB for small scale applications 09 ‐ ECT ‐ 25 UMER NASEER 09 ‐ ECT ‐ 09 ZUBAIR ‐ UL ‐ HASSAN Implementation of Wireless Sensor Engr. Haq Nawaz based Home security system 12:30 ‐ 12:45pm 4 02 09 ‐ ECT ‐ 20 M. MUZAMMIL SHAMSHAD 09 ‐ ECT ‐ 03 RASHEED AHMAD Ultrasonic Proximity Detector and Engr. Safia Bibi 2:00 ‐ 2:15pm 5 Range Finder 03 09 ‐ ECT ‐ 32 BABER ALI FAROOQ 09 ‐ ECT ‐ 48 UMER SHAHZAD KHAN Signal and Image Processing Group Vehicle License Plate Recognition 09-ECT-07 Muhammad Hassan Khan 2:15 ‐ 2:30pm 1 (VLPR) Using Region-Based Engr. Furqan Shoukat 02 09-ECT-40 M.Tahir Mehmood Segmentation Approach ACFR Based Security System 2:30 ‐ 2:45pm 2 Using Minutiae Extraction Engr. Furqan Shoukat 01 09-ECT-04 Noor Ul Ain Technique Facial Expression Detection using Engr. M. Laiq Ur 03 09-ECT-02 Ali Ahmed Rauf MATLAB Rahman 2:45 ‐ 3:00pm 3 09-ECT-11 Sakhawar Zubair 09-ECT-33 Sabeeh Ahmed 4 3:00 ‐ 3:15pm Vacant Parking Spot Detection Engr. M. Laiq Ur 02 09-ECT-29 M. Shoaib Rahman 09-ECT-05 M. Nadeem Raza

  3. Control & Automation Group Sr Project Title/Name Project supervisor No. of Student Student Name Timings .N Students Reg. No. o 09-ECT-12 Umar Asad 3:15 ‐ 3:30pm Industrial Gas Analyzer 1 09-ECT-22 Aamir Mehmood Engr. Hammad Zaki 03 Continuous monitoring using PLC 09-ECT-42 Idris Ayub Copper Electroplating of PCB 09-ECT-06 Mehtab Ahmed 3:30 ‐ 3:45pm using PLC 2 Engr. Hammad Zaki 03 09-ECT-16 Junaid Ali 09-ECT-18 Abu Bakar Talha Jalil Embedded Systems Group 09-ECT-31 Saffiullah Shafiq 1 Mine Sweeper Robot Engr. Hassan Bhatti 03 3:45 ‐ 4:00pm 09-ECT-15 Muhammad Shoaib Elahi 09-ECT-36 Abdul Zahir khan � Students/Groups are required to follow the presentation guidelines other wise they will loose marks. � Each group is allowed to present Project Proposal in 15 minutes. No extra time will be given. � In case of any confusion, students may contact FYP office. Engr. Haq Nawaz (FYP Coordinator)

Recommend


More recommend