May 22, 2018 North American Growth Project Lakewood Civic Association Meeting This presentation includes forward-looking statements. Actual future conditions (including economic conditions, energy demand, and energy supply) could differ materially due to changes in technology, the development of new supply sources, political events, demographic changes, and other factors discussed herein (and in Item 1A of ExxonMobil ’ s latest report on Form 10-K or information set forth under "factors affecting future results" on the "investors" page of our website at www.exxonmobil.com). This material is not to be reproduced without the permission of Exxon Mobil Corporation.
May 22, 2018 Baytown Chemical Plant, Growth Lakewood Civic Association Meeting This presentation includes forward-looking statements. Actual future conditions (including economic conditions, energy demand, and energy supply) could differ materially due to changes in technology, the development of new supply sources, political events, demographic changes, and other factors discussed herein (and in Item 1A of ExxonMobil ’ s latest report on Form 10-K or information set forth under "factors affecting future results" on the "investors" page of our website at www.exxonmobil.com). This material is not to be reproduced without the permission of Exxon Mobil Corporation.
• Studying addition of two units • Baytown is a potential location • Construction 2019-21 • 150 long term jobs • Permit application filed Nov’17 Baker Rd • Considerations: o Minimize emissions / noise o Manage construction traffic o Community outreach Olefins Plant Chemical Plant Refinery →
May 22, 2018 ExxonMobil Pipeline Company Nicolas Medina ExxonMobil Pipeline Company, Public and Government Affairs Manager
ExxonMobil Pipeline Company in Baytown • Safety of our neighbors and personnel is our priority • Operator of crude, refined product and chemical pipelines
Bayway Dr, Map
Integrity Management Program (IMP) • A risk-based approach to pipeline safety, required by federal regulation • Includes rigorous testing and analysis • Designed to identify areas that need repair or replacement
Upcoming Baytown-area maintenance work • Early- to mid-2019: pipeline maintenance in Baytown and East Harris County • Lakewood neighborhood: Replacement of about two miles of our existing crude oil pipeline • Between I-10 and the northwest corner of our refinery fence • Identified through our Integrity Management Program for replacement. • About 4-6 weeks to complete
Timeline of maintenance activities Mid-2018 – Early 2019 Early/Mid-2019 – Fall Early 2018 2019 • Surveys • Final planning • Soil sampling • Permitting • Continued community • Temporary workspace outreach acquisition • Mobilization • Community outreach • Field work, construction • Tie-in, testing • Startup geotechnical bores safely completed at Slap Out Gully on March 23, 2018
What to expect: Pipeline activities
Our commitment • All of our pipelines will continue to be safely maintained and operated in accordance with industry standards and all local, state and federal laws and regulations. • Through all stages of our work, ExxonMobil Pipeline Company will make information available to the community about our work. • ExxonMobil Pipeline Company will consult with individual residents regarding access to our easements on their property. • ExxonMobil Pipeline Company will seek to minimize disruption during our work and to limit inconvenience to community members.
We value your comments … ExxonMobil Pipeline Company values your comments and questions. 1. Project representative with CLS, Brad Shillings: 806-367-1890 (cell) 2. Public affairs hotline: 1 (888) 804-4788 3. Email: public.awareness@exxonmobil.com 4. Website coming soon
Who do I Contact? ALWAYS CALL 911 in an emergency. EMPCo Operations Control 1-800-537-5200 Center (24-hr Emergency line) EMPCo Public and 1-888-804-4788 Government Affairs Hotline public.awareness@exxonmobil.com Operations Control Center Houston, TX
Thank You