non non sh shie ield ldin ing te testing inge ngeca ca fr
play

Non Non Sh Shie ield ldin ing Te Testing INGE NGECA CA Fr - PowerPoint PPT Presentation

Non Non Sh Shie ield ldin ing Te Testing INGE NGECA CA Fr France ance Obj Objectiv ctives es: To measure over time the current quantities on 30mm x 40mm coupons located under Polyguard RD 6 coating: Coupons #1


  1. Non Non ‐ Sh Shie ield ldin ing Te Testing INGE NGECA CA ‐ Fr France ance

  2. Obj Objectiv ctives es: ‐ To measure over time the current quantities on 30mm x 40mm coupons located under Polyguard RD ‐ 6 coating: ‐ Coupons #1 & #2: located under intentionally disbonded RD ‐ 6 (with void) ‐ Coupon #3: located under properly applied RD ‐ 6 (without void) ‐ To measure the water pH after 3 months under disbonded Polyguard RD ‐ 6 coating (Coupons #1 & #2) ‐ To visually inspect the status of the steel coupons after 3 months in electrolyte under CP current and compare it with a CP protected non ‐ coated marker and a non ‐ CP protected non ‐ coated marker Plastic support Coupons #1 & #2: Under intentional disbonded RD ‐ 6 Coupon #3: (With void) Under properly applied RD ‐ 6 (Without void)

  3. Sam Samples les pr prepar eparations ions Coupons #1 & #2: Coupon #3: Under intentionally Under properly applied RD ‐ 6 disbonded RD ‐ 6 Without void With void

  4. In Intentio ionally lly di disbonded sbonded RD RD ‐ 6 Coupons Coupons #1 #1 & #2 #2

  5. Wa Water in inje jectio ction under under di disbonded sbonded RD RD ‐ 6 Coupons Coupons #1 #1 & #2 #2

  6. Additional Additional non non ‐ co coate ated steel eel Ma Markers In the same electrolyte (CP protected) In the same electrolyte but different container (non ‐ CP protected)

  7. Af After ter 3 mo mont nths hs … High pH: 12 Coupons #1 & #2 Visual inspection: Non corrosion

  8. Af After ter 3 mo mont nths hs … Non ‐ coated marker Non ‐ coated marker Coupons #1, #2 & #3: Non ‐ CP protected: CP protected: No corrosion Totally corroded Calcareous sediment

  9. Curr Curren ent measur asurem emen ents ts

  10. Curr Curren ent measur asurem emen ents ts

  11. Concl Conclusi sions ons Polyguard RD ‐ 6 coating system does not shield CP current: ‐ Visual inspection: no corrosion after 3 months in comparison with non ‐ CP protected steel marker ‐ Quantities of current measured reaching the coupons located under intentionally disbonded RD ‐ 6 ‐ High pH of 12 measured under intentionally disbonded RD ‐ 6

Recommend


More recommend