NARA Sports Pavilion
Current Funding for Project: The Project The Town of Acton is requesting $400,000 to CPA = $289,400 complete the NARA Sports Pavilion project. (The Recreation Department initially State = $150,000 requested $650,000 in CPA funding in 2016 and was awarded $350,000.) The initial CPA grant, along with significant in-kind donations Miracle League = $136,903.81 including time, materials and equipment, as outlined in this application, will enable Total = $576,303.81 completion of the north building by this summer, referred to as “Phase One” of the Sports Pavilion project. We now seek CPA funding to complete “Phase Two,” the south building and remainder of the project. South Building North Building Cost Estimates: Amount Requested from CPA = $400,000 North Building = $489,000 Current Funding for Project = $576,303.81 South Building = $443,900 Total = $976,303.81 Total = $932,900
Sports Pavilion Design
Benefits A family restroom providing accessible • facilities which preserve the dignity of those needing extra assistance and their caregivers; Restroom facility for all park patrons • including field users; Much needed storage space for • Recreation Department equipment; Patio at parking lot level with view of the • seven-acre ballfield, serving those with limited mobility; Concession room/snack bar; • Picnic seating area; • Centralized NARA Camp Headquarters • safely away from Waterfront Strategic location near the Miracle Field • and NARA sports fields; Meets needs frequently expressed in • NARA survey – high priority in the NARA Master Plan; Police Command Center for large • events, i.e. July 4 th .
Date Leveraged Work Completed Organization Estimated Value Inmates from MCI 7/2018 Interiors of buildings stripped down to studs $3,500 Shirley Stamski & McNary 7/2018 Survey work for parking lot extension $1,500 7/2018 Grading and shaping for new parking lot Town of Acton $5,000 7/2018 Installation of septic tank & pump chamber CPA & Miracle League CPA & Miracle League 7/2018 Excavate and run conduit to buildings from septic Redmond & Ed O’Neil $2,000 7/2018 Excavate and run trench to grease tank Redmond $1,000 8/2018 Pave new parking lot CPA CPA Inmates from MCI 6/2019 Remove bulk heads from buildings $600 Shirley Heffernan Construction 7/2019 Install water proofing to walls $1,000 Redmond & Town 7/2019 Added water proof membrane to exterior walls $500 7/2019 2” coring through foundations for utilities Ed O’Neil $300 7/2019 Water line excavation from Quarry Road to buildings Town of Acton $3,000 7/2019 Survey elevation of utilities Stamski & McNary $500 7/2019 4” Coring through foundations for sewer CPA CPA 8/2019 Sewer lines excavated to buildings Redmond $1,500 Redmond & Ed O’Neil 8/2019 Underground utility conduits set and backfilled $1,000 8/2019 Installing of meter pedestal and services to houses Electrician CPA 8/2019 Existing roof of north building repaired and metal roof installed General Fund $34,000 8/2019 Grading & compactable fill added around buildings Redmond & Town $2,000 8/2019 Set finished grade elevations around patio Stamski & McNary $800 9/2019 Shaping & fill added on slope off patio Town of Acton $2,000 Town & Mike Kennedy 9/2019 Slope loamed graded and hydro-seeded $8,000 Town & Redmond 9/2019 Excavate & install drain from patio $500 9/2019 & Final grading for patio pour and patio Pour General Fund $28,250 10/2019 10/2019 Energize system to the meters Eversource 10/2019 Layout slope for sidewalk to patio Stamski & McNary $200 11/2019 Repairs & removal of south building roof Apple Hill $850 Woodworkers, Inc. 11/2019 Ice & water shield applied Robert Green Roofing $1,350 11/2019 Donation of funds to purchase metal roof and donation to install roof Harvey Industries $30,000 IB Roof Systems Private Donation TOTAL ~$124,850.00
The Finish Line • Find funding to complete project • Bid package complete late January • Bid awarded in March • Construction commences in April • Construction complete in July
Recommend
More recommend