N N N TYPICAL 450 STUDENT PK-8 PROGRAM OF REQUIREMENTS COST OF NEW STATE OF ART 450 STUDENT PK-8 SCHOOL TYPICAL SQ FOOTAGE = 64,297 SF TYPICAL CONSTRUCTION COST = $14,500,000.00 2/3RDS OF COST IS CO-FUNDED BY OSFC = $9,600,000.00 1/3 RD OF


  1. N

  2. N

  3. N

  4. TYPICAL 450 STUDENT PK-8 PROGRAM OF REQUIREMENTS

  5. COST OF NEW STATE OF ART 450 STUDENT PK-8 SCHOOL TYPICAL SQ FOOTAGE = 64,297 SF TYPICAL CONSTRUCTION COST = $14,500,000.00 2/3RDS OF COST IS CO-FUNDED BY OSFC = $9,600,000.00 1/3 RD OF COST IS FUNDED BY DISTRICT = $4,900,000.00 ESTIMATED COST TO RENOVATE EXISTING JESSE OWENS ACADEMY BUILDING EXISTING 1914 BUILDING = 42,240 SF DEFICIT SQ. FT. OVER NEW BUILDING = 22,057 SF NOTE: 1. OSFC WILL NOT CO-FUND SPACES NOT IN THE OHIO SCHOOL DESIGN MANUAL (OSDM) SUCH AS THE AUDITORIUM. 2. THE SITE IS SMALL AND WILL NOT ACCOMMODATE PARKING FOR STAFF AND VISITORS AND PLAYGROUND AREAS. 3. ALTHOUGH PK-8 SCHOOLS HAVE BEEN BUILT ON 2 ACRE LOTS, THE SITING OF THE EXISTING BUILDING DOES NOT PROVIDE ADEQUATE SPACE FOR THE REQUIRED ADDITION WITH PARKING AND PLAYGROUND SPACES. TO MEET THE OSDM, THE FOLLOWING ADDITION IS REQUIRED FIRST FLOOR 23,839 SF SECOND FLOOR 7,344 SF THIRD FLOOR 4,473 SF TOTAL 35,656 SF ESTIMATED COST TO RENOVATE EXISTING BUILDING = 42,240 SF X $185/SF = $ 7,814,400.00 ESTIMATED COST OF ADDITION = 35,656 SF X $235/SF = $ 8,379,160.00 ABATEMENT COSTS = 244,405.00 TUCKPOINTING COSTS = 30,000.00 CLEANING EXTERIOR MASONRY = 29,430.00 WATER REPELLANT / SEALING = 19,620.00 TOTAL ESTIMATE FOR RENOVATION AND ADDITION = $16,517,015.00 OSFC WILL CO-FUND RENOVATION COSTS EQUAL TO 2/3RDS THE COSTS OF NEW BUILDING = $ 9,600,000.00 THIS COULD INCLUDE THE ADDITION @ 35,656 SF X $235/SF = $ 8,379,160.00 PART OF EXISTING STRUCTURE @ APPROX. 6,599 SF X $185/SF = $ 1,220,840.00 REMAINING 35,641 SQ FT RENOVATION COSTS DISTRICT WOULD HAVE TO FUND $ 6,917,015.00 1/3 RD COST BY DISTRICT (COST TO BUILD NEW) $ 4,900,000.00 DISTRICT LFI COSTS TO RENOVATE EXISTING $ 2,017,015.00

Recommend


More recommend