MTA Status & Schedule Ya gmur Torun Illinois Institute of Technology/Fermilab MTA RF Meeting Nov 18, 2013 Fermilab Ya gmur Torun MTA RF Mtg 11/18/13 News P . Lane comprehensive exam (Nov 12) Ya gmur Torun MTA RF


  1. MTA Status & Schedule Ya˘ gmur Torun Illinois Institute of Technology/Fermilab MTA RF Meeting – Nov 18, 2013 – Fermilab Ya˘ gmur Torun MTA RF Mtg – 11/18/13

  2. News � P . Lane comprehensive exam (Nov 12) Ya˘ gmur Torun MTA RF Mtg – 11/18/13

  3. Action items (last week) Infrastructure Debug solenoid power supply control Finalize crane installation plan All-season cavity Complete E(B) run Remove cavity DL-HPRF cavity Finalize design for cavity inserts and coupler Modular cavity + Draft commissioning/run schedule Order missing parts for instrumentation Design clean room inspection cart and stage adapters Update quench force calculation Button-pillbox cavity Re-assemble with gridded windows Leak check, calibrate Ya˘ gmur Torun MTA RF Mtg – 11/18/13

  4. Action items (last week) 201-MHz single-cavity module Clean clean room & parts � Fabricate struts Fabricate cavity mockup Finish alignment analysis � Review vacuum system � Review water system Instrumentation/interface design/assembly top-hat � acoustic sensors infrared sensors � Faraday cup + electron pickups + directional coupler calibration Ya˘ gmur Torun MTA RF Mtg – 11/18/13

  5. Action items (this/next week) Infrastructure Debug solenoid power supply control Finalize crane installation plan All-season cavity Revive data analysis mtg Complete E(B) run Remove cavity DL-HPRF cavity Finalize design for cavity inserts and coupler Modular cavity Order missing parts for instrumentation Design clean room inspection cart and stage adapters Update quench force calculation Button-pillbox cavity Re-assemble with gridded windows Leak check, calibrate Ya˘ gmur Torun MTA RF Mtg – 11/18/13

  6. Action items (this/next week) 201-MHz single-cavity module Draft commissioning/run schedule Remove old cavity from platform Clean clean room & parts Fabricate cavity mockup Install cavity mockup in vessel Finish alignment analysis Finalize vacuum system specification Finalize water system specification Instrumentation/interface design/assembly top-hat infrared sensors coupler light Hall access tomorrow: inspection for crane installation Early next week (TBC) 201-MHz cavity removal? all-season cavity removal? services (air, water, cabling)? Ya˘ gmur Torun MTA RF Mtg – 11/18/13