DEVELOPMENT OF POST 2020 GLOBAL BIODIVERSITY FRAMEWORK: UPDATE ON PROGRESS OEWG Co-Chairs November 24, 2019 Francis Ogwal Montreal, Canada Basile van Havre October 2019
Overarching principles guiding the process 1. Participatory 2. Inclusive 3. Gender responsive 4. Transformative 5. Comprehensive 6. Catalytic 7. Visible 8. Knowledge-based 9. Transparent 10. Efficient 11. Results-oriented CBD Post 2020 Process 12. Iterative 13. Flexible Details in COP Decision 14/34 (Annex) 2
Agenda • Overview of progress – Engagement of Chair SBI and Chair SBSTTA • Completed 1. Thematic Ecosystem restoration (name of SCBD Officer) 2. Thematic Marine & Coastal (name of SCBD Officer) • Upcoming 3. Area Based Conservation measures 1-3 Dec 2019 4. Resource mobilization 14-16 Jan 2020 5. Capacity Building, Technical & Scientific Cooperation 1 March 2020 6. Implementation, Monitoring, Reporting and Review 21-22 Feb 2019 CBD Post 2020 Process 7. Sustainable Use March/April 2020 8. Access and Benefit sharing March/April 2020 9. Biosafety 10. Digital Sequence Information 11. Synergies 3
Organization of Work: Timeline Phase 1: Consultations Phase 2: Thematic Consultations Phase 3: Negotiation Informal OEWG 1 SBSTTA OEWG 2 SBSTTA OEWG 3 Briefing CoP 15 WG8j SBI Agenda Date Location • Review of post-2020 process 4 days Nairobi, OEWG 1 • Defining Scope and Structure of Framework 27-30 Aug 2019 Kenya • Workplan: incl. thematic work and schedule CBD Post 2020 Process • Review progress from OEWG1 and thematic consultations 1 day Montreal, Informal 24 Nov 2019 Canada Briefing • Negotiate goals/targets 6 days Kunming, • Other issues (tbd) 24-29 Feb 2020 China OEWG 2 • Workplan update as required • Remainder of elements of the Framework 5 days Cali, Colombia OEWG 3 • Negotiate and adopt the final draft for submission to COP15 July 2020 4
Organization of Work: External Processes OEWG 2 SBSTTA OEWG 3 OEWG 1 Informal CoP 15 Capacity Bldg Briefing Accountability Sust Use tbc SBSTTA Restoration Resources SBI WG8j Thematic Thematic Thematic Thematic Thematic Thematic Synergies Thematic Marine Thematic ABCM Updated draft from Co-Chairs Other elements Co-Chairs to draft Will consider external processes as appropriate, including: • 7 studies: Economic valuations of action and inaction, cost and resourcing studies • UN Women Gender Consultations • UNU Landscapes and Seascapes • OECD Workshop CBD Post 2020 Process • ASEAN Workshop • Wildlife expert workshop • Trondheim Biodiversity Conference • DSI Dialogues • Biosafety 5 Preparation Timeline : https://www.cbd.int/conferences/post2020.
Organization of Work: Thematic Consultations Key Goals/Targets – Outcomes to be considered by Co-Chairs in drafting the Framework for OEWG2 and OEWG3 – Concept notes • Scope, process, timeline, etc… • Links to SBSTTA and SBI work Role of Co-Leads – Preparation work – Chair of Workshop(s) CBD Post 2020 Process – (as required and possible) assist OEWG Co-Chairs up to end of post-2020 process 6
Organization of Work: The Way We Propose to Work • Maximizing the input from SBSTTA, WG8j, SBI, thematics and other consultations • Capturing outcomes of OEWG – Discussion Groups: Reports to Plenary – Discussions in Plenary: Captured in the official meeting report • Global Biodiversity Framework document is evergreen – Regularly update, as required • Before OEWG2 – capturing inputs from submissions, thematics, WG8j, SBSTTA-23 – January 13, 2020: Zero draft to be posted online in all UN languages CBD Post 2020 Process • After OEWG2 – reflecting reports to plenary and official meeting report • Before OEWG3 – capturing inputs from submissions, SBSTTA-24, SBI-3 – Formal approval of draft at OEWG3 meeting in July 2020, Cali, Colombia 7
Arranging Documents Glossary Available on Jan 13th Information document Draft Zero • Intro (incl Theory of Change) • Vision Available Jan 13th • 2050 Goals In all UN language • 2030 Mission • 2030 Goals For negotiation • Targets (all those available) • Annex CBD Post 2020 Process Background for each target Available on Jan 13th or soon thereafter Aichi experience Information document Sceience background etc. 8
Coordination with SBSTTA • SBSTTA 23 advice on: – Organization of the key structural elements – Options for the inspirational and motivating 2030 mission as a stepping stone towards 2050 Vision – Thematic areas for goals and targets with a focus on addressing drivers of biodiversity loss. CBD Post 2020 Process • SBSTTA 24 (tbc) – Validating draft framework after OEWG2 9
Coordination with SBI Capacity Building Transparency Resource Mobilization and Technical and Responsibility Financial Mechanisms sceintific cooperation Expert Workshop Expert panel (Jan 14-16) Gap Analysis Open Consultation workshop (Feb 21-22) OEWG2 Open Consultation Gupta Study (Mar 1) WEF study Expert Workshop OECD (End of Mar 2020) AXA … Report (Apr 16) Report (Apr 16) Report (Apr 16) SBI-3 VPR Trial, & Item 9 Agenda item 7 Agenda item 6 CBD Post 2020 Process Online Consultation (July 2020) Negotiation OEWG3 Negotiation Negotiation 10
Coordination with SBI 8J, Nagoya Biosafety Mainstreaming Sustainable Use WG8J, other consultation consultations Informal Advisory OEWG2 Group to develop Expert consult recommen late march dations Agenda Agenda SBI-3 item 5 item 11 CBD Post 2020 Process OEWG3 negociation negotiation negociation negociation 11
THANK YOU QUESTIONS? Twitter: #Nature #Post2020
Organization of Work: Thematic Consultations Themes – Access and Benefit-Sharing (August 25, 2019) – Biosafety (August 25, 2019) – Restoration (November 6-8, 2019) – Marine and Coastal Environment (November 13-15, 2019) – Area-Based Conservation Measures (December 1-3, 2019) – Resource Mobilization (January 14-16, 2020) – Transparent, Implementation, Monitoring, Reporting and Review (February 21-22, 2020) – Capacity Building and Technical and Scientific Cooperation (March 1, 2020) • Being developed (Concept note and Scoping documents to be available November - CBD Post 2020 Process December) – Sustainable Use (March or April 2020) – Access and Benefit Sharing • Taking in considerations existing decisions and processes 13
Post-2020 (Phase 1): Key Messages from Consultations: Voluntary Commitments Voluntary Commitments Non State Actor Framework voluntary Country A Country B Country C commitment NBSAP NBSAP NBSAP Curent State CBD Post 2020 Process
Post-2020 (Phase 1): Summary Regional consultations completed • – Asia-Pacific, 28-31 January 2019 (Nagoya, Japan) – Western Europe and Other Groups, 19-21 March 2019 (Bonn, Germany) – Africa, 2-5 April 2019 (Addis Ababa, Ethiopia) – Eastern and Central Europe, 16-18 April 2019 (Belgrade, Serbia) – GRULAC, 14-17 May 2019 (Montevideo, Uruguay) Other engagements including: • ASEAN Workshop China EU Dialogue – – – OECD Workshop CCICED AGM – Wildlife expert workshop – – Gender Workshop Co-Chairs drafting workshop & Team meeting – 28-31 May 2019, Montreal • • Consultation with other MEA and international processes, June, Bern, Switzerland • Presented the post-2020 process and provided updates at the Trondheim Conferences CBD Post 2020 Process on Biodiversity, 2-5 July 2019 UNGA, Climate Action Summit, and presented at the China Council for International • Cooperation on Environment and Development (CCICED) – 23 September 2019, New York City Numerous briefings offered to Parties and NGOs: Aim is to inform and listen to views 15 •
Thematics - Participation Ecosystem Marine and ABCM restoration coastal nominated / accepted / funded Total number 82/ 76 /40 112 / 96 / 46 108 / -- / 57 Parties and governments Africa 17 / 15 / 15 16 / 15 / 15 19 / -- / Asia and Pacific 14 / 12 / 9 14 / 14 / 14 20 / -- / CEE 5 / 5 / 4 5 / 5 / 3 6 / -- / GRULAC 6 / 6 / 6 8 / 8 / 8 4 / -- / WEOG 8 / 8 / NA 13 / 13 / NA 16 / -- / Observers Organisations 22 / 20 / 1 49 / 35 / NA 31 / -- / NA CBD Post 2020 Process IPLC 4 / 4 / 2 3 / 2 / 2 6 / -- / Women 3 / 3 / 2 2 / 1 / 1 3 / -- / Youth 2 / 2 / 1 1 / 1 / 1 2 / -- / NGO 1 / 1 / NA 1 / 1 / NA 1 / -- / Gender balance (f/m) About 1:3 43% A little over 1:2 (38%) 16
Recommend
More recommend