Metropolitan Transportation Plan Project Development Presentation 9/19/2011 1
Draft Listing of Highway Projects • Does Not Include Any New Freeways • Have Reviewed with City Staff • So Far Minor Changes Have Been Suggested • Red = Needed by 2020 • Blue = by 2030 • Green = by 2040 9/19/2011 3
Notice the Choke Points (dashed black lines) • Cedar Pass has 26k Trips per Day • Lehi 35k • Lindon 217k • Springville 127k 9/19/2011 4
Phase 1 2020 9/19/2011 5
Phase 2 2030 9/19/2011 6
Larger Facilities Need to be Explored by 2040 Phase 3 2040 9/19/2011 7
S alt Lake County Today has 1.1 million people U tah County in 30 years is projected to be 1.1 million people C urrent Day… • Buffalo, NY • Hartford, CT • New Orleans, LA • Richmond, VA • Oklahoma City, OK Each have about 1 million population and have multiple freeways and expressways W hat Will Become of our Highway System? 9/19/2011 8
ITE Ideal Highway Spacing • With 1.1m people SL today, SL Co. is close to ideal freeway spacing Co. • South area of county needs better east/west connectivity • At 1.1m people in 30 years, Utah Co. UT lacks ideal freeway spacing • Geography makes Co. choke points in Lehi, Santaquin, Lindon, and Springville 9/19/2011 9
Metropolitan Transportation Plan 1 st West Side Freeways Were Modeled West Side Vision Corridors 145k • 3 Scenarios Were Modeled, All Do Well 2040 Traffic Cedar Pass CP Lehi CP 2007 I-15 Traffic 126k Eagle Mountain to Lehi 127k Lindon CP • South of Eagle Mountain to Santaquin is a Corridor Preservation Project 156k • None of the Scenarios Help Relieve 134k Congestion in the Lindon or Lehi Areas V1 V2 102k Cedar Pass Choke Point Conditions − Pony Exp PKWY Fails − Pony Exp PKWY Fails − Pony Exp PKWY Fails The Question is − South Pass RD is − S Pass RD not used − HWY 73 Fails, has 52k Minor Arterial − N Pass RD not used FWY traffic level, 67k Always Asked… − N Pass RD not used Lehi Choke Point Conditions “Why Not Build A − Pioneer Crossing is − Pioneer Crossing Fails − Pioneer Crossing Fails 37k Congested − No relief to Choke − No relief to Choke Bypass to I-15 on − No relief to Choke Point Point the West Side of Point the Lake?” 32k Lindon Choke Point Conditions − I-15 Fails − I-15 Fails − I-15 Fails − No relief to Choke − No relief to Choke − No relief to Choke Point Point Point 28k 9/19/2011 10
Metropolitan Transportation Plan Next East and West Side Freeways Countywide Vision Corridors Were Modeled to Create a Grid Network 145k 2040 Traffic Cedar Pass CP Lehi CP 2007 I-15 Traffic 126k • The 3 Scenarios Through Cedar Pass 127k Lindon CP Do Well from Eagle Mountain to Lehi • Mountain View FWY with Utah Lake 156k Bridge Relieves Lindon and Lehi Areas • Payson to Provo FWY Relieves 134k Springville Choke Point and Provo I-15 102k V4 V5 52k Cedar Pass Choke Point Conditions − Pony Exp PKWY Fails − Pony Exp PKWY − Pony Exp PKWY Fails − South Pass RD is Congested − HWY 73 Fails, has Minor Arterial − S Pass RD M.ART FWY traffic level, 67k − N Pass RD not used 37k Lehi Choke Point Conditions − All Corridors Good − All Corridors Good − Pioneer Crossing Fails − Relieves Choke Point − Relieves Choke Point − Congestion in central 32k and southern Lehi Lindon Choke Point Conditions − Reduces I-15 by 20k − Reduces I-15 by 20k − Reduces I-15 by 40k 28k − Blue Corridor adds − Blue Corridor adds − Blue Corridor adds 20k to Vineyard 20k to Vineyard 20k to Vineyard Connector Connector Connector 9/19/2011 11
NW Cities Preferred Scenario V-7 FREEWAYS N Cedar Pass to Santaquin FWY | 6 Lanes (Expressways) Point of Mtn FWY | 8 Lanes Mtn View FWY to HWY 73 | 8 Lanes Mtn View FWY to Foothill | 6 Lanes 2040 Traffic Lake Crossing FWY | 6 Lanes I-15 FWY | 12 Lanes 2007 I-15 Traffic 126k Payson to Provo FWY | 6 Lanes Lehi 2100 N EXPRESSWAYS Lehi 2100 N EXPWY | 6 Lanes Hidden Valley EXPWY | 6 Lanes Pioneer Crossing EXPWY | 6 Lanes Pony Exp PKWY 15 Foothill EXPWY | 4 Lanes Vineyard Connector EXPWY | 6 Lanes ARTERIALS HWY 73 | 6 Lanes Pony Express PKWY/Lehi 1900 S | 4 Lanes Redwood RD | 4 Lanes To Be Modeled - Soon 9/19/2011 12
Preferred Scenario FREEWAYS V-8 N Cedar Pass to Santaquin FWY | 6 Lanes Lehi 2100 N FWY | 10 Lanes (Freeway Grid Network) Mtn View FWY to HWY 73 | 8 Lanes Mtn View FWY to Lake Crossing | 6 Lanes Lake Crossing FWY | 6 Lanes 145k 167k 2040 Traffic Payson to Provo FWY | 6 Lanes 267k Cedar Pass CP Lindon | 12 Lanes 15 2007 I-15 Traffic 126k Lehi | 12 Lanes 15 Lehi CP FWY Arterial Point of the Mtn | 12 Lanes 15 Lehi 2100 N 84k Orem | 12 Lanes 199k 15 127k Provo | 10 Lanes 15 237k 36k 58k Pioneer Crossing Lindon CP ARTERIALS Pony Exp PKWY 15 54k 20k 28k HWY 73 | 6 Lanes Pony Express PKWY | 4 Lanes 30k 75k 258k Hidden Valley ART | 6 Lanes Pioneer Crossing | 6 Lanes 156k Lehi 1900 South | 4 Lanes 19k Vineyard Connector | 6 Lanes 66k Redwood RD | 4 Lanes 246k Extreme Congestion Congestion 42k Starts at… Congestion Constrained Flow 79k 134k FREEWAYS Free Flow 6 Lane 105+ 104k 173k 8 Lane 140+ 10 Lane 175+ 12 Lane 210+ Provides Balanced Relief for all Areas ARTERIALS I-15 Lindon and Point Congested 4 Lane 40k+ 6 Lane 55k+ 9/19/2011 13
Metropolitan Transportation Plan Overall Best Modeled Network of FWY Preferred Scenario Major Facilities • Travel Through Lehi Runs Well • Lindon and Point of the Mountain Choke Points Still Experience Congestion • Payson to Provo FWY Relieves Springville Choke Point and Provo I-15 • West Side FWY in Goshen Area Not Needed as a Freeway in 30 Years- Corridor Preservation Orange = I-15 FWY Green = West Side FWY Red = Mountain View/Lake Crossing FWY Blue = Payson to Provo FWY 9/19/2011 14
Recommend
More recommend