mdt project update
play

MDT Project Update March 22, 2019 Eli Cuelho TRI Environmental - PowerPoint PPT Presentation

MDT Project Update March 22, 2019 Eli Cuelho TRI Environmental Moisture Conditioning Subgrade Checking moisture and vanes Tracking Subgrade in Place Compacting Subgrade Leveling Subgrade Recompacing Subgrade Surface Finished Subgrade


  1. MDT Project Update March 22, 2019 Eli Cuelho TRI Environmental

  2. Moisture Conditioning Subgrade

  3. Checking moisture and vanes

  4. Tracking Subgrade in Place

  5. Compacting Subgrade

  6. Leveling Subgrade

  7. Recompacing Subgrade Surface

  8. Finished Subgrade Surface

  9. Subgrade Measurements Subgrade 2 1 1 1 A 2 ft. 1 2 3 4 6 5 2 2 4 2 ft. Measurement Type B 3 2 ft. 2 ft. 7 8 Vane Shear – all layers 1 2 Moisture Content – all layers 10 9 3 3 6 2 ft. C 5 Lightweight Deflectometer – final 3 layers 11 12 Dynamic Cone Penetrometer – final layer only 14 13 Sand Cone Density – final layer only 4 4 2 ft. 8 D 7 2 ft. 2 ft. 15 16 4 3 18 17 5 5 E 2 ft. 10 9 19 20 22 21 6 6 F 2 ft. 11 12 23 24 2 ft. 4½ ft. 4½ ft. – – – – –

  10. Moisture Content • 72 measurements per test section • Average values – Test Section 1 = 27.9% – Test Section 2 = 28.0% – Test Section 3 = 28.0% • Standard deviations are around 0.6%

  11. Vane Shear Strength • 144 measurements per test section • Average values – Test Section 1 = 101.2 kPa – Test Section 2 = 99.1 kPa – Test Section 3 = 99.3 kPa • Standard deviations are around 10 kPa

  12. DCP CBR (%) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 • Avg. per test 0 section 1-B 1-C 1-D 6 – Sect. 1 = 2.37 1-E 1-F 2-A 12 – Sect. 2 = 2.31 2-B 2-C 2-D Depth (in.) – Sect. 3 = 2.31 18 2-E 2-F 3-A 24 3-B 3-C 3-D 30 3-E 3-F 36 CBR = 292/(mm per blow)^1.12 [Kleyn EG July 1975]

  13. LWD 8.0 • Avg. per layer* 7.0 – Layer 4 = 5.98 6.0 Dynamic Stiffness (MN/mm 2 ) – Layer 5 = 4.73 5.0 – Layer 6 = 3.94 4.0 • Avg. layer 6 per 3.0 test section* 2.0 – Sect. 1 = 4.17 Layer 4 Layer 5 1.0 – Sect. 2 = 3.86 Layer 6 – Sect. 3 = 3.84 0.0 1B 1C 1D 1E 1F 2A 2B 2C 2D 2E 2F 3A 3B 3C 3D 3E 3F Test Section Location *units are MN/mm 2

  14. Excavate Hole

  15. Driving Anchor

  16. Subgrade Sensor

  17. Leveling and Setting Sensor

  18. Finished Installations

  19. Bringing in Crushed Base Course

  20. Installing Base Course on Geosynthetics

  21. Hand Leveling Base Course

  22. Base Surface after Screeding

  23. Compacting Base Course

  24. Base Course Measurements Base Course 1 A 2 ft. 1 3½ ft. 2 1 2 ft. B 2 Measurement Type 2 ft. 2 ft. Moisture Content – all layers 1 2 Lightweight Deflectometer – all layers 3 2 ft. C 3 Dynamic Cone Penetrometer – final layer only 3½ ft. Nuclear Densometer – final layer only 3 Sand Cone Density – final layer only 4 2 ft. D 4 2 ft. 2 ft. 2 1 5 E 2 ft. 2 5 3½ ft. 6 F 2 ft. 6 2 ft. 4½ ft. 4½ ft. Measurement Type – – – – –

Recommend


More recommend