Maximising Energy Efficiency in Data Centre Design Maximising Energy Efficiency in Data Centre Design 8 th May 2019 David McAuley SEAI EXEED 8 th May 2019 David McAuley
https://www.google.ie/imgres?imgurl =https%3A%2F%2Fechelon- dc.com%2Fwp- content%2Fthemes%2Fechelon%2Fim g%2Ffooter%2Flogo- colour.svg&imgrefurl=https%3A%2F%2 Fechelon- dc.com%2F&docid=kUDLHJD6dQy- qM&tbnid=Sl7fmsVArrz_OM%3A&vet =10ahUKEwjm3KjnsIriAhW4TxUIHUD4 CdUQMwhAKAAwAA..i&w=800&h=17 6&client=safari&bih=812&biw=1440& q=echelon%20data%20centres&ved=0 ahUKEwjm3KjnsIriAhW4TxUIHUD4CdU QMwhAKAAwAA&iact=mrc&uact=8
http://mattturck.com/wp-content/uploads/2018/02/2018_Matt_Turck_IoT_Landscape_Final.png
Compo Co position n of Total Expo ports 2017 2017 Computer Services 25% Pharma & Chemicals 24% Business Services 13% Financial Services & Insurance 9% Machinery & Transport Equipment 7% Miscellaneous manufactured 5% articles* Food 4% 0% 5% 10% 15% 20% 25% 30%
Industry Reports www.bitpower.ie
https://infrastructure.aws
https://infrastructure.aws
Sustainability & CSR
Scale of Data Hosting facilities
Efficiency Gains
Other 1% Peat 7% Coal Renewables 12% 29% Gas 51%
The EXEED process explained Designed Verified Managed Planning Design for Design for Project Summary Measure and Verify Energy Management Energy Performance Energy Management DELIVERABLES DELIVERABLES DELIVERABLES DELIVERABLES DELIVERABLES DELIVERABLES • EED Project Execution Plan • Energy Balance Study of baseline • Energy Measurement Plan • Project Summary Report • Measurement and Veri fj cation • Asset within scope and design reports boundary of an ISO 50001 • Project organisation structure • Updated Energy Saving Register Energy Management System KEY REQUIREMENTS • Energy Saving Register, master • Updated Energy Saving Register • EED Expert and EED Owner document recording all ideas KEY REQUIREMENTS • Conclude all fj nancial, energy, KEY REQUIREMENTS and opportunities KEY REQUIREMENTS KEY REQUIREMENTS co-energy and other bene fj ts • Conduct energy variables review • Measurement and Veri fj cation for the asset in operation • Conduct Energy Review • Implement Measurement • De fj ne new roles, responsibilities • Conduct energy performance Plans using the Energy Balance • Capture all outcomes and and Veri fj cation plans and authorities deterioration review Study, Energy Saving Register information developed by • Adhere to competency • Understand the project risks and • Integrate other metering KEY REQUIREMENTS and Measurement and the process requirements for measurement opportunities requirements Veri fj cation data • Determine annual energy • Include the current revision and veri fj cation • Understand the organisation • Integrate new fj ndings including: • Continual improvement co nsumption and pro fj le of of the Energy Saving Register • Verify design assumptions and context, stakeholders and design changes, measurement of energy performance baseline design • Include lessons learnt operational energy performance interested parties and veri fj cation, performance • Consider alternative energy deterioration measurement, • Handover of the Energy • Management and approval by • Develop procurement strategies sources if relevant mitigants, new opportunities, Saving Register, technical EED Expert and EED Owner and requirements, including • Challenge baseline design using commissioning actions, documentation and other specialist suppliers a required methodology operational control knowledge to the operator • Assess co-energy bene fj ts • Ensure ongoing communication NEW PROJECT and integration into construction ORGANISATION and commissioning plans for implementation EED Owner • Continually assess for Accountable to Top management energy performance during for implementing the EXEED implementation requirements within the design project application EED Expert Responsible for the day-to-day execution, coordination and management of the EED activities O R G A N I S A T I O during the project lifecycle N S U P P L I E R TOP S MANAGEMENT PROJECT TEAM SPECIALIST SUPPLIERS DESIGN TEAM EED OWNER EED EXPERT REPORTING COMMUNICATION LINES
Maximising Energy Efficiency in Data Centre Design Maximising Energy Efficiency in Data Centre Design 8 th May 2019 David McAuley SEAI EXEED 8 th May 2019 David McAuley
Recommend
More recommend