ENERGY EFFICIENCY PROGRAM FOR BUSINESS 2018 DTE Energy Incentive and Rebate Program 1
ENERGY EFFICIENCY PROGRAM FOR BUSINESS Jacob Walker Outreach 2
ENERGY EFFICIENCY PROGRAM FOR BUSINESS Safety First 3
ENERGY EFFICIENCY PROGRAM FOR BUSINESS Agenda 1 - Program Overview 4 – Completing the Application 2 - Program Catalog and Application 5 - Program Changes 3 – New Construction 6 - Supplemental Documents 4
ENERGY EFFICIENCY PROGRAM FOR BUSINESS Program Overview 5
Program Overview Deadlines • The Program Year ends Nov. 30 o No Reservations will be extended beyond Nov. 30 o Final Applications must be submitted within 60 days of project completion date or Nov. 30, whichever comes first o Incomplete Final Applications may be subject to cancellation o Any Application submitted after Nov. 30 may be cancelled • Watch the gauges 30 6
Program Overview Impact of our Program Since 2009: $166 million incentives paid. 50,000 projects completed. 7
Program Overview Impact of our Program Since 2009 - savings: o 7,000 GWh in electricity o 19 million Mcf in natural gas o $500 million in total energy costs Energy savings = 5 million tons of CO 2 not being pumped into the atmosphere *Household data based on estimates from the U.S. Energy Information Administration. *CO 2 calculations based on U.S. Environmental Protection Agency guidelines. 8
Program Overview For a customer to receive incentives • The business/project must: o Be a DTE utility customer o Be a capital investment resulting in energy efficiency o Involve new products that meet specifications o Have a meter on eligible rate schedule* o Be in good standing with DTE Energy o Not be a Residential or Multifamily customer *A special agriculture program is available for those on a residential meter 9
Program Overview A customer can’t receive incentives if: o Customer is self-direct (has opted out) o It’s a load-shifting/demand-limiting project o It’s a fuel switching project o It’s a renewable energy/on-site generation project o It involves power quality improvements o It only involves operational/maintenance changes 10 10
Program Overview Three Types of Projects •Defined measures for 1-for-1 upgrades Prescriptive •Projects don’t fit a prescriptive approach Custom •New facilities/renovations of facilities New Construction •Change of use Major Renovation •Adding load 11 11
Program Overview Three Types of Incentives •Defined incentives: Prescriptive o Per item/kWh/Mcf energy saved •Calculated incentives: Custom o Per-kWh/Mcf of energy saved •Systems Approach: New Construction o Defined per item/kWh/Mcf energy saved Major Renovation •LEED Whole Building: o Based on LEED certification 12 12
Program Overview Project Reservations • Required for some measures; highly Prescriptive recommended for all measures • Required for all projects Custom New Construction • Highly recommended for all projects Major Renovation Do NOT start your project until you receive a Reservation Letter* *Could take 4-6 weeks to receive the letter 13 13
Program Overview How they work ELECTRIC • Lighting • HVAC Prescriptive • Miscellaneous • Process • Food Service Prescriptive Incentives NATURAL GAS • Hot Water & Laundry • Pre-determined measures • HVAC with specific energy savings • Insulation and cash incentives in the • Process categories of electric and gas • Food Service • Boiler/Furnace Tune-up 14 14
Program Overview How they work Custom Incentives •Capital investment projects that are NOT eligible for a Prescriptive incentive may qualify Custom •Custom incentives are determined on a case-by-case basis and are paid per-kWh or per-Mcf saved o Examples include: Heat recovery § § Lighting retrofits not 1-for-1 15 15
Program Overview How they work • Systems Approach o Prescriptive incentives New Construction • LEED Whole Building Approach Major Renovation o Based on three levels of LEED certification • LEED Design Review Assistance o $1,500 for LEED project certification More on New Construction later in this presentation 16 16
Program Overview The Process Reservation Application Application Review Reservation Letter Issued Install Measures Final Application & Review Payment 17 17
Program Overview The Process Reservation Application Reservation Application Application to Application Review Letter: 4-6 weeks Reservation Letter Issued Reservation Letter Issued Letter to Final: Install Measures ≤ 90 days Final Application & Review Final Application & Review Final to Check: 4-6 weeks Payment Payment 18 18
ENERGY EFFICIENCY PROGRAM FOR BUSINESS 2018 Catalog & Applications 19 19
2018 Catalog & Applications 2018 Catalog •Prescriptive & Custom specifications •Agriculture program specifications •New Construction specifications NEW • Index of electric measures & page numbers in the back • Index of gas measures & page numbers in the back 20 20
2018 Catalog & Applications 2018 Application •Prescriptive & Custom measure worksheets •Agriculture measure worksheets •New Construction worksheets Use it as a: • Reservation Application • Final Application 21 21
2018 Catalog & Applications Be Complete Don’t forget these : • Customer Information Sheet • Invoices; manufacturer’s spec sheets o Include reference numbers • 3rd-party payment authorization (if applicable) • Prescriptive/Custom Worksheets • Signed Final Application Agreement 22 22
2018 Catalog & Applications Customer Info Identify: • The Project • The Customer • Customer Information Sheet • Prescriptive/Custom Worksheets • W-9 • Invoices; spec sheets • Signed Final Application Agreement • 3rd-party payment authorization 23 23
2018 Catalog & Applications Customer Info Identify: • The Project • The Customer • Customer Information Sheet • Prescriptive/Custom Worksheets • W-9 • Invoices; spec sheets • Signed Final Application Agreement • 3rd-party payment authorization 25 25
2018 Catalog & Applications Worksheets Complete relevant pages: • Prescriptive • Custom • Customer Information Sheet • Prescriptive/Custom Worksheets • W-9 • Invoices; spec sheets • Signed Final Application Agreement • 3rd-party payment authorization 26 26
2018 Catalog & Applications Worksheets Complete relevant pages: • Prescriptive • Custom • Customer Information Sheet • Prescriptive/Custom Worksheets • W-9 • Invoices; spec sheets • Signed Final Application Agreement • 3rd-party payment authorization 28 28
2018 Catalog and Applications Agreement Page The last – Final – step: • Customer reads • Customer signs • Customer Information Sheet • Prescriptive/Custom Worksheets • W-9 • Invoices; spec sheets • Signed Final Application Agreement • 3rd-party payment authorization 30 30
ENERGY EFFICIENCY ENERGY EFFICIENCY PROGRAM FOR BUSINESS PROGRAM FOR BUSINESS 2018 New Construction 31 31
2018 New Construction Reservations • Systems Approach o 90-day reservation period • LEED Whole Building Approach o Reserved only for the current Program year New Construction • LEED Design Review Assistance Major Renovation o NEW: No reservation required 32 32
2018 New Construction How it works Systems Approach • Incentives available for certain equipment (look for this icon: ): o Lighting Power Density o Daylighting Sensors & Controls o HVAC o Process Electric New Construction o Water Heating Major Renovation o Food Service & Refrigeration 33 33
2018 New Construction How it works Systems Approach • Incentives available for certain equipment (look for this icon: ): o Lighting Power Density o Daylighting Sensors & Controls o HVAC o Process Electric New Construction o Water Heating Major Renovation o Food Service & Refrigeration 35 35
2018 New Construction Advantages Systems Approach • Suited for certain projects: o Smaller/less complex projects (< 20,000 sq. ft.) without modeling § Further along in the design process o Encourages developers: § Meet performance standards in New Construction lighting power density/HVAC Major Renovation 36 36
2018 New Construction Certification LEED Whole Building Benefits • LEED-certified buildings are attractive to buyers • Buildings have a 20% higher lease-up rate • Building value by 6.8% • Operating costs: 13.6% for new construction 8.5% for existing buildings New Construction Major Renovation *Green Building Certification Institute 37 37
2018 Catalog & Applications 2018 Agriculture Program •C&I customers use the main Program Application •Residential customers use the stand-alone Application *Customers on a residential meter must use the stand- alone Application 38 38
ENERGY EFFICIENCY PROGRAM FOR BUSINESS Questions? 39 39
Recommend
More recommend