making th the rig ight ch choices
play

Making th the Rig ight Ch Choices Presentation n Tit Title - PowerPoint PPT Presentation

Making th the Rig ight Ch Choices Presentation n Tit Title Helping Customers and Partners to Design and Implement Future Ready Laboratory Co Comp mpany Prof ofile Desi signi ning ng and d Commissi ssion oning ng La Lab b since


  1. Making th the Rig ight Ch Choices Presentation n Tit Title Helping Customers and Partners to Design and Implement Future Ready Laboratory

  2. Co Comp mpany Prof ofile Desi signi ning ng and d Commissi ssion oning ng La Lab b since over er 20 year ars • Established in 1992 (Spin-off from Saybolt) • Independent company allowing selection of the optimum solution • Over 20 years Laboratory Expertise in Oil & Gas, Petrochemical and (non-)Ferrous Lab Methods, Standards and Requirements • Specialized in Engineering & Design (FEED and Detail) and Turn-key Project Realization • ISO 9001-2008 certified and commitment to HSE • Offering a total solution within one organization and a single point of contact 2

  3. Glob Gl obal Reac each Prov oven Trac ack Record of f Suc uccess DAMIETTA LNG LNG Egypt Aktobe Plant, Kazakhstan CPF Algeria Prelude F-LNG LNG Peru GPP Algeria Wheatstone & Gorgon LNG Australia BCPL Cracker & Polymer, India LNG Nigeria RRE Refinery UAE Dahej Ethylene Cracker, India Oil UAE Petrochemicals KSA LNG Oman 3

  4. Engineerin Eng ring and and De Desig ign The e Value ue Crea eation on Wh Whee eel OPERATIONAL REQUIREMENTS DETAILED END-USER/ OWNER DESIGN REQUIREMENTS CUST STOMER MER & PARTN TNER ER PR PRODUCTI TIVIT ITY HSE WORKFLOW & REQUIREMENTS FUNCTIONALITY LABORATORY REGULATIONS 4

  5. Fr From om Cus Customer Ne Needs to o Eng Engineering A prov oven en process ess to trans nsfor orm needs eds int nto o action ons Detailed Design Customer Needs/ Design Process Pro sses Foc ocus Are reas • • Problem Definition Feasibility study • • Conceptual Design Perform technical requirements • • Preliminary Design Investment cost for the project • • Detail Design Project-specific requirements and • guidelines are defined by client Design Communication Deli eliverable les Data avail ilable le du duri ring Cu Customer r • Furniture layout and Spefification Need eeds/D s/Desi sign • • Equipment and Utilities Layout Process samples not available • • Gas and Elestrical distribution Laboratory Layout is very basic • • Analyzers definitions and optimization Equipment list is estimated and very • Full operational requirements including basic • chemical and standards requirements Utilities, Power, HVAC is not available Learn Innovate Plan Create Improve 5

  6. Ope Operation onal Requ equirements Compl plete e Anal alytical Workflo flow w Solut ution ons s Methods & Instruments/ Data Reagents Software Standards Equipment Management GC Systems Separation Method Physical Properties Spectroscopy Standards Kits 6

  7. Reso esources and and As Assets Op Optim timization on Trans nsfor orm sampl ple e measu asurements s needs eds int nto o optimized ed workflo flows s Optimized ed anal alyzers s model delling g wi with h asso sociated ed chem emical al cons nsum umpt ption on and d wast ste mana nagem ement • An approach built on years of experience packaged in a program designed to store the information correlating methods<- >technology<->reagents<->SOP. • The program used by Engineering experts size and optimize the number of systems, chemical requirements and waste management. • Very exhaustive database built on constantly updated methods literature ensure compliance to laboratory tests TEST according to standard methodology: REAGEN TOTAL FREQUE TS PER CONSU NCY PER APHA, ASTM, EPA, EN, HACH, HTAS, IFP, IP, METHOS MPTION DAY ISO, SMS, UOP etc. 7

  8. Proj oject Man Management Single e Point of Contact, Fully Suited ed PROJECT SCHEDULE PROGRESS PROJECT REPORT COMPLIANCE SHEET YOU OUR R DEDICA DEDI CATE TED INSPECTION & CHANGE / ISSUE TEST PLAN MANAGEMENT PROJEC PR JECT T MAN MANAGER ER SCOPE & DOCUMENT INTERFACES CONTROL (RACI) (VPIS/VDR) PROJECT QUALITY & CONTROL PLAN 8

  9. Part artner in n La Lab As Asset Management One e Contact | One e Contrac act | Comprehe ehens nsive e | Mu Multivend ndor or A st struc uctur ured d appr proa oach to La Lab b Asset set PLAN Ma Mana nagem emen ent backed d by year ars s of DISPOSAL ACQUIRE exper ex perienc ence of a large e team am of Service ANALYTICAL EQUIPMENT Engi gineer neers Equipme ment OPTIMIZE DEPLOY LAB Lifecycle LAB AUTOMATION DEVICES Manageme ment • Continued support post lab commissioning through comprehensive repair and MASS MANAGE REPAIR SPECTROMETRY maintenance of all laboratory equipment regardless of the manufacturer. QUALIFY MAINTAIN • Resident engineer on-site as single point of contact for all service issues and mobilize necessary resources • Leverage relationship with OEMs to provide quick service as required • Use of proprietary database to track performance & service history of all laboratory assets including spare parts inventory and usage • Quick access to large inventory of common spares & consumables stocked in-country 9

  10. 400+ 400+ References Wor orldwid ide 20+ 20+ Year ars of Exper Experie ience 1250 1250 + + Item tems pe per Proje oject M&I-Labtech B.V. . Tel: +31 10 26 307 77 Tankhoofd 7-8, 3196 KE Mob: +31 6 2972 6723 Vondelingenplaat Rotterdam Mail: info@mi-labtech.com The Netherlands Web: www.mi-labtech.com

Recommend


More recommend