LOS ANGELES RIVER VALLEY BIKEWAYS & GREENWAYS DESIGN COMPLETION PROJECT January 9, 2017 Presented by: Nur Malhis, P.E. Architectural Division Bureau of Engineering
LA River Valley Bikeways & Greenways Project Scope Scope: design and construct approximately 13 miles of new bath path and greenway facilities along the LA River in San Fernando Valley (SFV), which complement projects that have already been built or are underway by closing critical gaps in the public transportation system Type Length (miles) Total in SFV ~ 19.5 Gaps ~13 Completed ~2.5 Design ~3.5 In Construction ~0.5
Overall Project Map LA River Valley Bikeways & Greenways TAMPA START RESEDA WHITE OAK BALBOA SEPULVEDA VAN NUYS WOODMAN COLDWATER CANYON WHITSETT LANKERSHIM BARHAM ZOO DRIVE END
LA River Valley Bikeways & Greenways Feasibility Study Tasks Right of Way Identification • Utility Coordination • Bike Path and Greenway Alignment Alternatives • Drainage (Biofiltration and Bioretention systems) • Envision Analyses • Strategic Phasing of Design, Bid/Award, and Construction • As-Built Drawings • Preliminary CEQA/NEPA Documentation • Coordination with other Segments in Design and Construction • Cost Analysis • Feasibility Study Anticipated to be Complete in Spring of 2017 •
LA River Valley Bikeways & Greenways Segments Along Valley-Existing and In Construction Existing In Construction West Valley – Tampa to Corbin Mid Valley –Coldwater Canyon to Whitsett
LA River Valley Bikeways & Greenways Undercrossings Conceptual Rendering Undercrossing-Winnetka Ave Bridge
LA River Valley Bikeways & Greenways Renderings of Overcrossings and Tunnels Conceptual Tunnel Conceptual Overcrossing
LA River Valley Bikeways & Greenways Conceptual Cross Sections –Various Locations Components: Bike /Ped Path, Wayfinding Signage, Bioswales, Integrated Seating, Habitat Refuge, Pollinator Landscape, Plant Pallete
Pocket Parks LA River Valley Bikeways & Greenways FILTRATION GARDENS GATHERINE SPACE SUPERGRAPHIC HABITATE GARDEN CAFE BIKE LANE RIVER OVERLOOK
LA River Valley Bikeways & Greenways Community & Advisory Meetings-Feasibility Study Phase Advisory Stakeholder Committee Meeting Set 1: West Valley -11/30/16 ; East Valley -11/30/16 *Meeting Set 2: West Valley - 4/26/17 ; East Valley - 4/26/17 Technical Advisory Committee Meeting No. 1: 11/16/16 *Meeting No. 2: 4/12/17 River Cooperation Committee Meeting No 1: 7/11/16 Meeting No. 2: 01/09/17 Community Meeting Set 1: West Valley (12/6/16) ; East Valley (12/13/16) *Meeting Set 2: West Valley (5/9/17) ; East Valley (5/11/17) * Anticipated Dates
THANK YOU! Bureau of Engineering