LIBERTY WAREHOUSE
PROJECT OVERVIEW • CENTRAL PARK MARKET ANALYSIS / WHY MIXED USE? 1/22/2014 • 320,000 SF OF NEW, MIXED-USE SPACE WRAPPING A PARKING DECK • 246 MARKET RATE APARTMENT UNITS LIBERTY WAREHOUSE • 65% 1 BDR UNITS / 35% 2 BDR UNITS • 24,000 SF RETAIL FRONTING FOSTER STREET • 391 SPACE PARKING DECK • 316 RESIDENTIAL SPACES • 75 RETAIL SPACES 2
SITE PLAN LIBERTY WAREHOUSE 1/22/2014 3
FOSTER / CENTRAL PARK LIBERTY WAREHOUSE 1/22/2014 4
FOSTER / W. CORPORATION LIBERTY WAREHOUSE 1/22/2014 5
RIGSBEE / CENTRAL PARK LIBERTY WAREHOUSE 1/22/2014 6
SUSTAINABILITY INITIATIVES 1/22/2014 LIBERTY WAREHOUSE 7
PRESERVATION INITIATIVES 1. PRESERVATION OF THE EXISTING CENTRAL PARK BRICK WALL, WITH ONE CUT IN THE MIDDLE AND ADDITION OF METAL WORK TO RELATE BUILDING WITH FOUNDRY/HISTORY OF METAL WORK IN CENTRAL PARK. 1/22/2014 2. INCORPORATION OF NORTHEASTERN BRICK SIGNAGE IN TO NEW DESIGN, MOVING MURAL SIGNAGE TO W. CORPORATION. LIBERTY WAREHOUSE 3. PARTNERSHIP WITH REUSE OF AMERICA TO SELECTIVELY DEMOLISH ENTIRE WAREHOUSE, DONATING ALL MATERIALS TO BE REFURBISHED AND REPURPOSED EITHER WITHIN THE PROJECT OR BY OTHERS. 4. WORK WITH PRESERVATION DURHAM TO CREATING A “HISTORY WALK” WITHIN OUR PEDESTRIAN WALKWAYS THAT WILL INCLUDE VARIOUS DISPLAYS TO MEMORIALIZE THE LIBERTY WAREHOUSE BUILDING AND THE HISTORY OF TOBACCO AUCTION 8 BUSINESS IN DURHAM
EXTERIOR SIGNAGE 1/22/2014 9
INTERIOR SIGNAGE 1/22/2014 10
SCHEDULE JANUARY 2014 – SITE PLAN SUBMITTED 1/22/2014 MAY 2014 – SELECT DEMO / SITWORK LIBERTY WAREHOUSE SEPTEMBER 2014 – VERTICAL CONSTRUCTION BEGINS EARLY 2016 – BUILDING DELIVERY / OPENING 11