KIRLOSKAR BROTHERS LIMITED A Kirloskar Group of Company BHAGVATDAN - PowerPoint PPT Presentation

KIRLOSKAR BROTHERS LIMITED A Kirloskar Group of Company BHAGVATDAN GADHAVI EASC-KBL 09687641316,bhagvatdan.gadhavi@kbl.co.in Ahmedabad, Gujarat 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 1 Flow of Presentation


  1. KIRLOSKAR BROTHERS LIMITED A Kirloskar Group of Company BHAGVATDAN GADHAVI – EASC-KBL 09687641316,bhagvatdan.gadhavi@kbl.co.in Ahmedabad, Gujarat 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 1

  2. Flow of Presentation 1 Introduction - Energy Scenario Why Energy Conservation 2 Pump and Pumping cost 3 Avenues of Energy Saving in Pumping 4 Case Study 5 Conclusion 6 7 Our Beneficiaries 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 2

  3. Introduction about Energy Scenario How the world has changed its attitude Left hand side-In 20 th century smoke – sign of Prosperity and development Right hand side-In 21 st century smoke – sign of lack of technology and hazard 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 3

  4. Introduction about Energy Scenario Attitude of Industries regarding their process 19 th • The process should be done some how • Usage of resources was not limited Century 20 th • Competition increased in the market • Optimization of process to lower the cost Century 21 st • Process is fully optimized. What Next..? • Energy is the next future Century 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 4

  5. Why Energy Conservation? Energy Cost as % of Manufacturing Cost Cement 10% -Railways 20% Power 20% -Textiles 10% -Chlor - Alkali Aluminium 10% 10% Iron & Steel -Pulp & Paper 10% 10% 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 5

  6. Pump Cost and Pumping Cost • 85 % of the cost of running of a pump is towards cost of electricity. • For e g A 20 kW pump requires – 20 kWh/hr , i.e. Rs 90 / hr , (Energy Rate Rs. 4.5/kwh) – Rs 2,160/ day , – Rs. 64,800/ Month – Rs. 7,88,400/ Year. – Pump cost is Rs. 64,000 – 8 % of running cost  Pumping system efficiency = Pump eff. x Motor eff. x piping eff. 6 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 6

  7. Facts Regarding Pump Power Consumption The table below shows rise in pumping cost due to drop in efficiency for a 20 BKW pump set during the period of operation. Sr. No of Years Efficiency (* ) Pumping Cost No. Per Day Per Annum 1 1st Year 80 % 2160 788400 2 2nd Year 79 % 2187 798380 3 3rd Year 78 % 2215 808615 4 4th Year 77 % 2244 819117 5 5th Year 76 % 2274 829895 6 6th Year 75 % 2304 840960 7 7th Year 74 % 2335 852324 8 8th Year 73 % 2367 864000 9 9th Year 72 % 2400 876000 10 10th Year 71 % 2434 888338  Normally pump efficiency drops at 1% per annum for drinking water application due to erosion and corrosion. 7 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 7

  8. Factors for taking the Right Decision 85% Purchase Price 10% 10% 2.5% Running costs Maintenance costs 85% 2.5% 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 8

  9. Pumping Costs • Many opportunities for reducing pumping costs are not recognized because - Basic principles of pumping often misunderstood - Running pumps delivering sufficient water are considered to be functioning satisfactorily - Production concerns outweigh pumping considerations - Lack of awareness of pumping costs - Life cycle costs (i.e. Initial costs plus running & maintenance cost) are rarely considered at design stage 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 9

  10. Typical Reasons for High Pumping Costs • Over Sizing • System Resistance not Matched with Pump Rated Parameter • Installation of Samll dia Pipes,Valves Than Required to save the initial cost. • Degradation & Lack of Maintenance • No measures for Variable liquid demand – Crude methods like bypass / throttle 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 10

  11. The Way Forward Analysis Solutions for Measurement Energy Savings Energy Assessment & Solutions 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 11

  12. Avenues of Energy Saving in pumping 1. Pump set :  Efficient Motors  High Efficiency IE2(High Efficiency), IE3(Premium Efficiency) motors  Efficient Pumps  LLC Series of pumps  Pumps with Corrocoat  Star Label pumps  Pump Selection  Pump set should be selected based on Discharge & Head requirements , not based on Suction & Delivery Sizes  The duty point Head & Discharge should be around best efficiency point  While selecting the Pumpset, change in needs based on peak & low demand also should be kept in mind 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 13

  13. Avenues of Energy Saving in pumping 2. Pipes & Foot Valve :  Pipe Size  Pipe material : smoother the material , lesser the frictional losses  Non Frictional Foot Valve : Preferably Non-frictional Foot Valve should be used for better results , it has larger impact 3. Pumping Automation  No of parallel pump operation wrt demand  VFD pumping 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 14

  14. Infrastructure & Capabilities • Fully equipped with 12 sets of sophisticated instruments like Ultrasound Flow Meter, Power Analyzer, Stroboscope, etc • Competent team 12 people Qualified Energy Audit Professionals • Having specialized Instruments for Hazardous area and for sewage pumps . 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 15

  15. Infrastructure & Capabilities 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 16

  16. Infrastructure & Capabilities 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 17

  17. Our Infrastructure 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 18

  18. Our Infrastructure 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 19

  19. Our Infrastructure 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 20

  20. Unsupported stem length – temperature probe in thermowell 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 21

  21. Temperature Probe in Thermowell -Continuous Monitoring 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 22

  22. Unsupported Stem length – Direct Immersion 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 23

  23. Portable Unit - Tapping Point for Temperature and Pressure Probes Direct immersion suitable up to about 30 bar pressure 15 mm gate valve T-piece Safety clip Temperature probe tip is 50 mm into fluid Pressure probe attached to T-piece via quick-connects 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 24

  24. Our Infrastructure 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 25

  25. Arvind Mills , Ahemdabad, Gujarat Raw Pump House No-2 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 26

  26. Textile Industry – Arvind Mills, Ahmedabad, Gujrat Soft Water Pump House No - 2 ( 2 Working) Particulars Present System (P1, P2) Pump Make Submersible Type Total No of pumps 02 No. Of Working Pumps 02 Head (Mtrs) NA Discharge (m3/hr) NA Installed Power (KW) 15 + 24 = 39 KW 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 27

  27. Observed Parameters:- P1(32 Hp), P2 (20 Hp) Observed Parameters- P1 P2 Flow (m3/Hr) 130 111 Pressure Discharge ( Kg/cm2) 1.8 0.8 Discharge Head (Mtrs.) 18 8 Z Factor (Mtrs.) 2 2 Effective Head ( Mtrs.) 20 10 Input power to motor (KW) 22 KW 15.7 KW 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 28

  28. Efficiency Calculations Efficiency Calculations - P1 P2 Hydraulic output from the pump (Kw) 7.0 KW 3.0KW Input to the Motor (Kw) 22 KW 15.7 KW Overall Efficiency ( %) 31.81 % 19.10% Motor efficiency (From the name plate) ---% --- % Pump efficiency (considering above motor ----% ---- % efficiency ) Observations :-  Presently existing pumps Individual running point is 20 mtr. & 10 mtr head and 130 m3/hr & 111 m3/hr discharge.  Overall Efficiency of the pumps is 31.81 % and 19.10 %.  Presently water demand is relative to process requirements.  Suction and delivery valve is found fully open during measurement.  As per discussion with the clients, the water requirements are considered 250m3/hr and 30 mtr. head sufficient to the Present and future requirements. 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 29

  29. Pump Detail Present Pump Particulars (Name Plate) Details Pump Type UP 125/35 No of Pumps in Circuit 1 No of Working pumps 1 Head ( Meter ) 30 Discharge (M3/Hr) 250 Motor Rating (KW) 30 Speed (rpm ) 1450 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 30

  30. Present Working Details Observations :- • In Existing Installation 1#Pump is Connected to cater the Raw water requirement in the plant • Presently, 1#Pump is Running 24 hrs/day. • Pump is running on VFD to control the speed according to Pressure requirement. • On average pump is running on frequency of 43 to 45 HZ. 11-Jul-16 This is a proprietary document of Kirloskar Brothers Limited 31