june 2018 july 2018 july 2018 july 2018 july 2018 august
play

June 2018 July 2018 July 2018 July 2018 July 2018 August 2018 - PowerPoint PPT Presentation

June 2018 July 2018 July 2018 July 2018 July 2018 August 2018 August 2018 September 2018 Electr ectric V c Vehicle C Chargi ging g Stati tations We currently have 4 duel ChargePoint CT4000 charging stations with ports to charge 8


  1. June 2018 July 2018

  2. July 2018

  3. July 2018

  4. July 2018

  5. August 2018

  6. August 2018

  7. September 2018

  8. Electr ectric V c Vehicle C Chargi ging g Stati tations • We currently have 4 duel ChargePoint CT4000 charging stations with ports to charge 8 Electric Vehicles at one time. • Each station has a color LCD display with an instructional video on how to use the station. • Multi-language: English, Spanish and French • Touch button interface works in rain, snow and with gloves.

  9. Elect Electric ic V Vehicl ehicle Cha Chargin ing Stations s • Each station has two standard Level 2 charging ports with locking holsters. • Each port provides that can 7.2 kW charge any Electric Vehicle. • Each port is equipped with a 23ft charging cord to increase the usability of our charging spots. • Charging stations are available 24/7.

  10. November 2018

  11. DPUC/PUC LEAD BY EXAMPLE • October 2 2012 – New ew en ener ergy-effic icie ient nt HVAC S System i installe lled • May 2 y 2013 – Purcha hased 2 2013 T Toyo yota Camry a y and nd T Toyo yota H Hig ighland nder ( (hyb hybrid ve vehic hicles) • December 2 2015 – En Energy-effic icie ient nt L LED lighting ing • Nove vember 2 2016 – 2 dual l Ele lectric V Vehic hicle Cha harging ng S Stations ns • December 2 2016 – Purcha hased 2 2016 C Che hevy V vy Volt lt ( (Ele lectric Vehic hicle) • October 2 2018 – Installed e ed energy gy-effic icie ient nt w water h heater • Nove vember 2 2018 – Solar Carpo port a and d an addi dditional 2 2 du duel E Electric V Vehicle C Chargi ging g St Station ons s (T (Total of of 4 4 duel El Electri ric V Vehicle Ch Charging St Stations) • Janu nuary 2 y 2019 – Will ill be adding ing ano nothe her 2019 C Che hevy B vy Bolt lt t to o our f fle leet (Ele lectric V Vehic hicle)

  12. Decl cline ne i in n ene nergy co cons nsumption f from Mar March ch 2003 2003 – Mar March ch 2019 ( 2019 (pr projected) 300000 89 Jefferso rson B Boulevard rd War arwick, R RI 250000 200000 150000 100000 50000 0

  13. Special Thanks! Divis isio ion o of Publi lic U Utilit ilitie ies & & Carrie iers Kevin Lynch, Deputy Administrator Al Contente, Engineer (Project Manager) Becky Harwood, Information Technology Office o e of Energy R y Resou ources es George Sfinarolakis – Solar Canopy Ryan Cote – Electric Vehicle Charging Stations Divisi sion o of Capi pita tal A Asse set M t Manag ageme ment t & Mainte tenan ance Simidele Mabray – Solar Canopy John Couture – Electric Vehicle Charging Stations Newpo port R rt Renewab ables s Stuart Flanagan – Co-Founder Michael Cabral – Co-Founder

Recommend


More recommend