UNM Gallup: Facility Repair and Renewal CA CAMPUS S STEW TEWARDSHIP, PROTECT CTION & & STU TUDE DENT SU SUCC CCESS SS: • Upgrading the interior lighting with low maintenance and energy efficient LED’s will produce significant savings, in utility costs, as well as maintenance costs over the life of the fixtures. • Adding fire sprinkler systems to the Construction Tech Building and Health Careers will increase life safety as well add asset protection • Repairing and renewing the various parking lots will help ensure that these assets last as long as possible and avoid costly replacement. • Replacing the aging elevator will help offset the rising repair and maintenance costs as well as increase reliability. 2
UNM Gallup: Facility Repair and Renewal PROJECT SN SNAPSHOT • Square Footage: renew approx. 151,314 square feet (excludes Imp mpact cted Buil uildings for or LED ED parking lots) Ligh ghting Upgr grade • Project Cost: $1,500,000 • Schedule: July 2021 – January 2023 Imp mpact cted Buil uilding To o Re Rece ceive New Pa Passenger Elevator El PROJECT OUTLINE Imp mpact cted Pa Park rking lots ots to o be be re repai paired Gallup Campus • Replace elevator in Calvin Hall (Bldg #4) • Fire safety renewal in Health Careers (Bldg #11 ) and Construction Technology (Bldg #3 ). • Renewal of LED lighting in classrooms and gymnasium • Asphalt pavement repairs/renewal in 12 parking lot locations. Site 3
UNM Gallup: Facility Repair and Renewal 4
UNM Gallup: Facility Repair and Renewal SC SCHEDULE FI FINANCIALS • $1,125,000 2020 State STB Request Program / Design (3 months) • Construction (15 months) $ 375,000 25% Local Funds • Schedule: July 2021 – January 2023 $1,500,000 Total Project Cost Programming & Design Completion 3 Months Construction 15 Months 2021 2022 2023 UNM Gallup Facility Repair & Renewal – Project Schedule 5
Recommend
More recommend