it its dev developmen pment in in nepal nepal chal
play

IT ITS Dev Developmen pment in in Nepal Nepal Chal Challeng nges - PowerPoint PPT Presentation

IT ITS Dev Developmen pment in in Nepal Nepal Chal Challeng nges es and and Issues Issues SHIVA HARI SAPKOTA NEPAL 1 Presen esentati tion on Outlin tline Traffic management in Kathmandu (Where we are?) Operational Traffic lights


  1. IT ITS Dev Developmen pment in in Nepal Nepal Chal Challeng nges es and and Issues Issues SHIVA HARI SAPKOTA NEPAL 1

  2. Presen esentati tion on Outlin tline • Traffic management in Kathmandu (Where we are?) • Operational Traffic lights in Kathmandu (What we are doing?) • Proposed Traffic lights in Kathmandu • Challenges of ITS • Issues of ITS • Planning for ITS (What we plan to do?) 2

  3. Traffic Data of intersection in Kathmandu Station Date AADT AADT in PCU Satdobato junction 2018 Nov 44319 34380 Manohar bridge 113727 90582 Sinamangal 73738 65015 Gwarko east 55865 38289 Kalanki 31116 35485 Narayan Gopal chowk 91255 71815 Nagdhunga 12953 26733 Banasthali 56124 58512 3

  4. Intersection improvement • JICA carried out study in 2000 • Among 28 intersections of the kathmandu valley, 10 most congested intersection identified to improve by the study team: 1) Kesharmahal 6) Kalanki Chowk 2) Maitighar 7) Singha Durbar 3) Koteswor ring road 8) Ramsahapath, Dilli bazar 4) Koteswor Tinkune 9) Nayabaneswor 5) Kalimati 10) Padmodaya turning These 10 junctions have been proposed to improve by the JICA with traffic lights and signals 4

  5. Initia Initiatio tion fo for Impr provem emen ent  In In F/ F/Y 2016/17 2016/17 Ka Kathmandu Sus Sustainable ainable Ur Urban ban Tr Transport Pro Project under under MOPI MOPIT wi with th the the support support of of Asian Asian Dev Developmen lopment Bank Bank (A (ADB) carried rried out out a pr progr ogram to to ins install the the In Intellig lligent Tr Traffic Ligh Light sy system in in Ka Kathmandu valle lley at at 35 35 loc locatio tions. s.  The The Desi Design, gn, es estim timate, co cont ntract docum documents and and its its ev evaluati tion on wa was perf perform ormed by by interna in rnatio iona nal co consul ultant.  The The oper operation ion & mai maintenance tenance of of the the sy system was pr wa proposed oposed fo for 5 ye years in in the the co cont ntract docum documents. s.  Unfortuna Unf rtunatel ely the the Con Contract ct Couldn’t Couldn’t be be aw awarded ded due due to to over over bidding. bidding. ITS Loc IT Locations tions 5

  6. Traffic fic lig lights in in Kathmandu thmandu • In 2018, the Department of Roads with coordination with Kathmandu Metropolitan city maintained traffic Maharajgunj light in 4 intersections: All Isolated type New Baneshwor Koteshwor 1. Newbaneswor 2. Maharajgunj Thimi 3. Koteswor 4. Thimi 6

  7. Traffic lig Tr lights in in Kathmandu mandu • Department of Roads has started to install traffic light in other more Bagbazar Mitrapark important 8 Intersections: Padmodaya Gaushala Kalimati Old Baneshwor Tinkune 1. Singdarbar Singadarbar 2. Padmodaya mode 3. bagbazar 4. kalimati 5. Tinkune 6. Old Baneswor 7. Mitrapark 8. Gausala 7

  8. CCTV Surveillance • Surveillance cameras are installed in major junctions to help traffic operation • More than 300 cameras fitted in major roads and junctions • Traffic Police, Kathmandu Metropolitan City, Department of Transport management and Department of Roads working together with close coordination • Traffic Police is suggesting to the Authorities that some cameras need to be added and some relocated 8

  9. Global Positioning System • Department of Transport Management (DoTM) is planning to implement GPS system to all public transport service vehicles • The modalities of implementation shall be decided by the Authorities • The program will be implemented before December 2019. • Road accidents information management system (RA ‐ IMS) have been established jointly by the Department and Traffic Police 9

  10. Issues Issues • Road conditions and its geometry improvement • River corridor improvement • Distance between intersections • Operation modalities of the surveillance system • Synchronization of traffic management system • Energy supply for the system • Reinforced the rules and Penalty system • Training 10

  11. Chal Challeng nges es of of IT ITS • Expertise in the field of ITS. • Financing the ITS infrastructures • traffic flow and safety • Capacity development of the staff • Specifications of ITS • Operation and maintenance modalities • Sustainability: mix Traffic, closed intersections, road users behavior 11

  12. Pl Planni anning ng fo for IT ITS 1. Department of Roads is planning to carry out the Due Diligence review of the documents for ITS 2. Due diligence review requires international expertise 3. ITS being a challenging issue for DOR, Procurement Modality has to be decided for example Design ‐ build and operate 4. operation and maintenance training. 12

  13. VISIT NEPAL 2020! THANK YOU ! 13