INTER RAO – Export, LLC: Engineering and supply of power equipment 2019
Inter RAO Group International R&D and Energy Power Generation Retail Power Supply Power Grids Engineering Power Trading Efficiency • Russian strategic • Energy audit and energy • 33.7 GW in six countries; • 15.2 million clients in • T he major power • 22 built and upgraded • 41 TPP ; 12 regions of Russia; operator of power exports management; distribution company in power facilities in Russia • 10 HPP (including 5 small • 17.7% of the Russian and imports; • Manufacturing of cutting - Georgia (JSC Telasi); and the CIS ( about 8 GW ); • Electricity export in 2017: HPP); retail electricity market; • Over 570,000 ultimate edge lighting systems; • Ongoing HPP and TPP 16.71 billion kWh , • 2 wind parks ; • P ower sales to large customers; construction projects in • Development of import: 5.12 billion kWh . • Power output in 2018: industrial holdings in • Over 5,000 km of power South America ( 1231 MW ); innovative technologies for 132.5 billion kWh ; more than 50 regions of thermal power generation. transmission lines. • Supply of power • Heat output in 2018: 41.7 Russia. equipment and spare parts. million Gcal . Financial Performance, Company’s Overview Equity Ownership Structure* IFRS 2018 Statements ($ bln.)* • A diversified international energy holding, one of the Rosneftegaz Group – major energy companies in Europe; Revenues 15.35 27.63% 27.63% • Around 51.5 thousand people employed; INTER RAO Capital - 29.39% • EBITDA 1.93 High priority for HSE policy. The environment management system is certified pursuant to ISO Free float – 33.74% 14001:2004 standard; 33.74% Net profit 1.14 • 29.39% Inter RAO is listed on MICEX- RTS, and the company's FSK UES Group – 9.24% Global Depositary Receipts (GDR) are admitted to trading on the London Stock Exchange's International * Average exchange rate of USD to Ruble in 2018 was 62.7 Order Book (IOB). 9.24% 2 * - As of 05.03.2019
Reference list of Inter RAO engineering projects in Russia and the CIS (construction and rehabilitation; 6992,2 MW) 2013 2014 2009 2012 2011 Yuzhnouralskaya-2 TPP. Gusinoozyorskaya Dzhubginskaya TPP. Sangtuda-1 HPP Kaliningradskaya- Tomskaya-1 Ivanovo CCGT Construction of two CCGT TPP. Reconstruction of (Tajikistan). 2 Cogeneration Construction of two gas- Cogeneration Plant. units. a 210 MW coal-fired units with total capacity of turbine units with overall Construction of 670 MW Plant. Construction Construction of a 15 Construction of a 825 MW. unit. capacity of 210 MW. HPP (4 X 167,5 MW). of a 450 MW CCGT MW gas-turbine unit. 325 MW CCGT unit. unit. Nizhnevartovskaya TPP. Kharanorskaya TPP. Sochinskaya TPP. Omskaya-3 Cogeneration Urengoyskaya TPP. Construction of a 413 MW Construction of a 225 MW Construction of an 80 Plant. Construction of a 85 Construction of a 460 CCGT unit. coal-fired unit. MW CCGT unit. MW CCGT unit. MW CCGT unit. 2019 2015 2017 2018 Cherepetskaya TPP. Mayakovskaya TPP . Verkhnetagilskaya SDPP . Omskaya-3 TPP-3. Talakhovskaya TPP . Pregolskaya TPP Construction of two coal- Construction of 2 GT units Breaking-in of turbine unit Construction of 4 steam- Construction of 2 GT units Construction of power island fired units ( № 8-9) with with total capacity of 156 with a T-120 turbine (160 with total capacity of 156 MW. № 12 of combined cycle gas gas generation units with overall capacity of 450 MW. Gcal / 120 MW). total capacity of 455,2 MW. turbine 420 with capacity of MW. 447 MW. Zatonskaya Cogeneration Permskaya SDPP . Plant . Construction of 800 MW Construction of 2 combined Combined Cycle Power cycle units with capacity of unit № 4 (left). 440 MW (left). 3
International Engineering Business Development timeline Auxiliary equipment and Specialized company EPCM competence Project management spare parts - Contract for construction of 800 - Creation on the basis of INTER - Start of power equipment - Incorporation of INTER RAO – MW of thermal power capacities RAO - Export of a Competence exports to Republic of Cuba. Export (a specialized subsidiary in Cuba (one 200 MW unit at Center responsible for the within Inter RAO Group (as of the end of 2018, 28 Máximo Gómez TPP and three management of international responsible for the contracts have been 200 MW units at Este Habana engineering projects. implementation of power completed). TPP). projects abroad). 2010 2011 2013 2015 2009 2019 EPC competence Pre-contract negotiations Main generating equipment - Contract for supply of 13 gas-turbine units - Modernization of 10 units with a unit - Contract for expansion of to Venezuela (total capacity 423 MW). capacity of 100 MW in Cuba Termogas Machala TPP in Ecuador (from 130 MW to 308 MW). - Contract for construction of Toachi Pilatón - Modernization of CHPP-3 (250 MW) of hydro power complex in Ecuador (254 MW). the city of Ulan-Bator (Mongolia). 4
INTER RAO – Export , LLC Our services Our advantages Supply of basic and auxiliary equipment (TPP, HPP, solar Experienced management team certified by standards of IPMA with a large portfolio of completed projects; and wind power plants); Growing portfolio of the company’s ongoing projects, Equipment installation and commissioning; cooperation with major regional energy companies; Power plant management, operation and maintenance; Experience in raising project funding and use of government support; Service contracts; Use of the best international management practice in line Project management (EPC/EPCM/EPCF contracts); with ISO 9001 standard; Single window for promotion of Inter RAO Group Strong and trust-based professional relations with the companies’ goods and services; governments and regulators in Russia and the countries of the business reach. Organization of project financing. 5
Recommend
More recommend