info session
play

INFO SESSION 9 March 2017 | 14:30 17:00 0 Fluxys Belgium - PowerPoint PPT Presentation

INFO SESSION 9 March 2017 | 14:30 17:00 0 Fluxys Belgium non-binding document for discussion & information purposes only 1 Fluxys Belgium non-binding document for discussion & information purposes only 9 March 2017 Agenda


  1. INFO SESSION 9 March 2017 | 14:30 – 17:00 0 Fluxys Belgium non-binding document for discussion & information purposes only

  2. 1 Fluxys Belgium non-binding document for discussion & information purposes only 9 March 2017

  3. Agenda Introduction 1. IP Services changes 2. Hub Services changes Coffee Break 3. Domestic Services changes Closing 2 Fluxys Belgium non-binding document for discussion & information purposes only 9 March 2017

  4. PLANNING 2016 2017 Jan Dec Feb Mar Apr May June July Aug Sep Oct Nov Dec • HUB Revamp HSA to Contractual transition • VIP BE-FR STA • CAM 2.0 (incl. INC) • INT NC - CNOT compliancy Start of Consult. Start of CREG Imb. • ATRIAS impact Conver. 22 Pooling • Technical improvements 23/2 Start of VIP ATRIAS Consult. Consult Start of Start of (tbc) CREG Docs CAM CNOT 23 Start of 2/3 31/3 HUB Consult BELUX Consult Docs CREG CREG Docs FLX PLAN A* BSYS Info Session 9/3 *indicative non-binding timing 3 Fluxys Belgium non-binding document for discussion & information purposes only 9 March 2017

  5. Agenda Introduction 1. IP Services changes − VIP FR-BE − CAM NC 2.0 − INT NC 2. Hub Services changes Coffee Break 3. Domestic Services changes Closing 4 Fluxys Belgium non-binding document for discussion & information purposes only 9 March 2017

  6. VIP – MODEL & PRODUCTS ON VIP FR-BE MODEL • All H-points linking ZTP-PEG-N will be grouped in a H-VIP. DNK LNG TML ALV (DKB) is out of scope*. L-IP untouched. VIP • New H-VIP point will replace Blaregnies Troll/Segeo and Alveringem. QUE SEG Existing IP’s will disappear. All existing contracts will be transferred to this new point. Total offered firm and interruptible capacity equal to current situation PRODUCT OFFER ON BIDIRECTIONNAL VIP • Firm** • Interruptible VIP • OCUC - OCUC’s that are offered today will also be available in the VIP TRO ALV SEG FR-BE • No more backhaul offered in the future as the new VIP is bidirectional. An ancillary service will continue to exist to maintain current contracts. FIRM INTERRUPTIBLE * Dunkirk LNG Terminal does not link ZTP-PEG-N. BACKHAUL ** VIP tariffs will be the result of applying TAR NC methodology but does not trigger early implementation of the TAR NC OCUC 5 Fluxys Belgium non-binding document for discussion & information purposes only 9 March 2017

  7. TARIFF (IN €/kWh/h/Y) � NO CHANGE * ENTRY FIRM INTERRUPTIBLE BACKHAUL OCUC to Zeebrugge Alveringem 0,767 0,614 1,474 Current H-gas Blaregnies Segeo 0,614 1,474 Blaregnies Troll 0,614 1,474 EXIT FIRM INTERRUPTIBLE BACKHAUL Alveringem 1,346 Blaregnies Segeo 1,682 1,346 Blaregnies Troll 1,682 1,346 ENTRY FIRM INTERRUPTIBLE OCUC to Zeebrugge VIP H-gas VIP FR-BE 0,767 0,614 0,614 1,474 EXIT FIRM INTERRUPTIBLE VIP FR-BE 1,682 1,346 * Based on 2017 tariffs as published on FLX BE website (€/kWh/h/y) – subject to CREG approval ** Backhaul (for ancillary service): 0,614 6 Fluxys Belgium non-binding document for discussion & information purposes only 9 March 2017

  8. VIP - LIMITED CHANGES TO REG. DOCUMENTS Defintions − “Interconnection Point” shall mean a Connection Point linking the Fluxys’ Transmission Grid with the transmission grid of an Adjacent TSO or with an Installation, including Zeebrugge Beach. No changes needed in STA. − “Connection Point” or “Point” shall mean a physical or a virtual point located on the Fluxys’ Transmission Grid or on the transmission grid of an Adjacent TSO … Old IP’s still in the table as they stay active until the launch date of the VIP. Backhaul will be maintained for the existing contracts as an ancillary service Mapping table for existing contracts 7 Fluxys Belgium non-binding document for discussion & information purposes only 9 March 2017

  9. CAM 2.0* > LIMITED IMPACT TO SCHEDULE OF QUARTERLY AUCTIONS TODAY CHANGES IN ACT – ATT. B • One auction day with four concurrent auctions (one for each quarter of the upcoming gas year). • Auction date: first Monday of June CAM2.0 – next quarterly auction on 1 th Monday of August 2017 Four auction days with concurrent auctions for each quarter. • for quarters one through four in the first annual quarterly capacity auction on the first Monday of August • for quarters two through four in the second annual quarterly capacity Others aspects in CAM 2.0 already auction on the first Monday of November covered in our ACT (esp. interruptible) • for quarters three through four in the third annual quarterly capacity auction on the first Monday of February • for the last quarter in the fourth annual quarterly capacity auction on the first Monday of May * Amendment to CAM NC is expected to enter into force on 28 March 2017 8 Fluxys Belgium non-binding document for discussion & information purposes only 9 March 2017

  10. CAM 2.0 > INCREMENTAL CAPACITY PROCESS Process is run every odd year • Jointly carried out by all TSOs at both sides of concerned IPs Starts with a Demand Assessment Report • Analysis non-binding request, but also auction results or (TY)NDP information • Concluding on the need – or not – to proceed with design phase Eventual Design Phase will • detail the possible project(s) and associated conditions (offer levels, tariffs, contracts) • Allow stakeholders to express views, via market consultation • Require joint NRAs decision on the project proposal(s) Subject to NRAs approval, the offer levels are allocated in a binding phase ENTSOG workshop on 28 March 2017 • Capacity is allocated either via auctions or alternative mechanism – choice is approved by NRAs will further detail the process • Allocation is conditioned to the success of an economic test: (part of) projected costs must be covered by projected revenues of binding bids – economic test parameters are approved by NRA 9 Fluxys Belgium non-binding document for discussion & information purposes only 9 March 2017

  11. INT NC – ART. 24 – CNOTS In accordance with INT NC, ENTSOG published the CNOTs (in Nov 2016) According to our analysis, Fluxys BE is compliant on all aspects but 2 Information Flow From Party Role Value To Party Role Value Confidentia Common Data Fluxys Implementation Compliance Remarks lity Level Exchange Solution Network User Registration Network User Transmission System Operator Private Not applicable Y Network User Registration to Auction Office Network User Auction Office Private Not applicable Y Approved Network Users Auction Office Registered Network User Private Not applicable Y Surrender Capacity Rights Registered Network User Auction Office Private Interactive Auction office Y PRISMA is compliant Offered Capacity Auction Office Registered Network User Public Interactive Auction office Y PRISMA is compliant Capacity Bid Registered Network User Auction Office Private Interactive Auction office Y PRISMA is compliant Allocated Capacity Auction Office Registered Network User Private Interactive Auction office Y PRISMA is compliant Aggregated Auction Results Auction Office All Public Interactive Auction office Y PRISMA is compliant Surrendered Capacity Sold Transmission System Operator Registered Network User Private Document Based - N Implementation of Surcap ANQ Reverse Auction Bid Registered Network User Auction Office Private Interactive Auction office Y PRISMA is compliant Allocate Reverse Auction Results Auction Office Registered Network User Private Interactive Auction office Y PRISMA is compliant Secondary Market Sales Registered Network User Transmission System Operator Private Interactive Auction office Y PRISMA is compliant Secondary Market Sales Transmission System Operator Registered Network User Private Interactive Auction office Y PRISMA is compliant Nomination Authorisation Registered Network User Transmission System Operator Private Not applicable Y Nomination Registered Network User (Initiating) Transmission System Operator Private Document Based SDT - Edigas Nomint Y Nomination Registered Network User (Matching)Transmission System Operator Private Document Based SDT - Edigas Nomint Y Forward single sided nomination (Active) Transmission System Operator (Passive) Transmission System Operator Private Document Based FWD - Edigas Delord ANC Y Processed Quantities (Initiating) Transmission System Operator (Matching)Transmission System Operator Private Document Based TCN - Edigas Delord 26G Y Matching Results (Matching)Transmission System Operator (Initiating) Transmission System Operator Private Document Based TIN - Edigas Delres Y Confirmation Notice (Initiating) Transmission System Operator Registered Network User Private Document Based TDT - Edigas Nomres 08G Y Confirmation Notice (Matching)Transmission System Operator Registered Network User Private Document Based TDT - Edigas Nomres 08G Y Interruption Notice (Initiating) Transmission System Operator Registered Network User Private Document Based - N implementation Nomres AND Interruption Notice (Matching)Transmission System Operator Registered Network User Private Document Based - N implementation Nomres AND Compliancy required by 1 Nov 2017 > 2 extra Edig@s messages required 10 Fluxys Belgium non-binding document for discussion & information purposes only 9 March 2017

Recommend


More recommend