Baltic InteGrid on the WindEnergy Hamburg 2018 26. September 2018 Iberdrola in the Baltic Sea 1 Iberdrola Content 1. Iberdrola An international energy leader 2. Wikinger offshore windfarm 3. Iberdrolas future projects in Baltic


  1. Baltic InteGrid on the WindEnergy Hamburg 2018 26. September 2018 Iberdrola in the Baltic Sea 1

  2. Iberdrola Content 1. Iberdrola – An international energy leader 2. Wikinger offshore windfarm 3. Iberdrola‘s future projects in Baltic Sea 4. Grid connection concepts 2

  3. Iberdrola 1 Iberdrola An international energy leader 3

  4. Iberdrola - An international energy leader Focus – Renewable Energy and Grid WIND HYDRO WAVES SOLAR ENGINEERING GRID GAS CARBON TRADING NUCLEAR 4

  5. Iberdrola - An international energy leader The utility of the future Portfolio correspond to the mix aimed for in the 5% „Energiewende“ Renewable energies 34% and hydrpower as 29% solid basis Wind, Solar, Bio. [MW] 25% Wasserkraft [MW] 8% Nuklear [MW] GuD [MW] KWK [MW] Status 2015 Kohle [MW] More than 50% of the installed capacity are renewable energies and hydropower 5

  6. Iberdrola - An international energy leader [MW] Renewables CoGen Nuclear CoCycle Carbon Hydro + 6,9 GW for clean energy (carbon will be only 1%) [Strategic Pillars, London 24 Feb. 2016] 6

  7. Iberdrola - An international energy leader • Global player in energy business, huge investments in renewables energy since years • Main markets: Spain UK USA Brasil Mexico • Revenue 2017: 31.2 Mrd EUR • No. 1 wind energy producer in Europe • Capacity renewable energy: approx. 16.6 GW; mainly onshore wind 7

  8. Iberdrola - An international energy leader • Over 7,5 GW Pipeline until year 2022 • Baltic Sea – 900 MW pipeline Wikinger, DE in operation since end 2017 Baltic Eagle, DE awarded in auction 2018 Wikinger Süd, DE awarded in auction 2018 Windanker part of auction 2021 • North Sea (UK) – 2,800 GW pipeline West of Duddon Sands, UK in operation since 2015 East Anglia ONE, UK in construction, completion 2020 Saint-Brieux, F planned for 2023 East Anglia 2 -4, UK • US East Coast – 4,000 GW pipeline Kitty Hawk Vineyard 8

  9. Iberdrola 2 Wikinger Offshore Windfarm 9

  10. Wikinger – Overview  Owner and operator Iberdrola  Investment approx. 1.4 Bil. EUR  Projektteam in Berlin, London, Madrid, Saßnitz  Baseport: Sassnitz/Mukran (Island Rügen)  Capacity 350 MW  70 Windturbines (Adwen AD5-135)  Start Installation March 2016  Commissioning 2017  Handed over to operation team 10

  11. Wikinger – Overview  70 Windturbines (WTG): Adwen M 5000-135  Nacelle (Bremerhaven)  Blades (Stade)  Substation (OSS)  Shared with TSO (50hertz)  Manufacturing Navantia  Transport and Installation SHL  Foundations:  Manufacturing (Navantia-Windar and Bladt)  Transport and Installation (OWFJV)  Internal array cables Prysmian 11

  12. Wikinger – Overview – WTG • Typ M-5000-135 • Nennleistung 5 MW • Typ Adwen M-5000-135 • Nabenhöhe 97,5 m • Nennleistung 5 MW • Rotordurchmesser 135 m • Nabenhöhe 97,5 m • Anlagenanzahl 70 • Rotordurchmesser 135 m • Anlagenanzahl 70 12 12

  13. Wikinger – Overview – WTG-Foundations 13 13

  14. Wikinger – Overview – OSS-Topside 14 14

  15. Wikinger Preparations Works  UXO & Obstacle Investigation 2015 / 2016 15

  16. Wikinger Preparations Works  UXO removal 16

  17. Wikinger Preparations Works  Cardinal buoy  Weather buoy  Weather forecasts  Guard vessel  Crew Transfer Vessels (CTV)  Marine coordination 17

  18. Wikinger Preparations Works Baseport and Stagging port Saßnitz / Mukran 18

  19. Wikinger Installation Installation vessel piles: Giant 7 19

  20. Wikinger Installation 20

  21. Wikinger Installation Foundation installation incl. grouting 03/2016 – 01/2017 21 21

  22. Wikinger Installation 22

  23. Wikinger Installation 23

  24. Wikinger Installation 24

  25. Wikinger Installation 25

  26. Wikinger Installation 26

  27. Wikinger Installation 27

  28. Wikinger Installation 28

  29. Wikinger Installation Offshore Substation (OSS): Offshore installation OSS (foundation and topside) 08/2016 29 29

  30. Wikinger Installation 30

  31. Wikinger Installation 31

  32. Wikinger Installation 32

  33. Wikinger Installation 33

  34. Wikinger Installation 34

  35. Wikinger Installation 35

  36. Wikinger Installation 36

  37. Wikinger Installation 37

  38. Wikinger Installation 38

  39. Wikinger Installation Internal cables: Cable laying completed 01/2017 39 39

  40. Wikinger Installation 40

  41. Wikinger Installation 41

  42. Wikinger Installation Windturbine installation: Installation 01/2017 – 10/2017 42 42

  43. Wikinger Installation 24 43

  44. Wikinger Installation 44 44

  45. Wikinger Installation 45 45

  46. Wikinger Installation 46

  47. Wikinger Installation 47 47

  48. Wikinger Installation 48

  49. Wikinger Installation 49

  50. Wikinger Installation 50 50

  51. Wikinger Installation 51 51

  52. Wikinger Installation 52

  53. Wikinger Installation 53

  54. Iberdrola O&M Building – Saßnitz / Mukran 54

  55. Iberdrola O&M Building – Saßnitz / Mukran 55

  56. Wikinger Installation 56

  57. Iberdrola 3 Iberdrola‘s future projects in Baltic Sea 57 57

  58. Iberdrola in Baltic Sea – future projects Overview projects: German Baltic Sea BSH: BFO Ostsee 2016 2017 58

  59. Iberdrola in Baltic Sea – future projects Overview projects German Baltic Sea Area O-1 in German EEZ acc. to Pre-Draft of Area Development Plan (FEP) BSH: FEP_Vorentwurf_2019 59

  60. Iberdrola in Baltic Sea – future projects Baltic Eagle and Wikinger Süd  Iberdrola was awarded in 2nd interrim auction acc. to §26 WindSeeG  Awarded capacity 486 MW  Area approx. 35 km² + 5 km²  Windturbine 8 – 10 MW class  Investment approx. 1.1 Bil. EUR  Project set-up comparable to Wikinger  TSO 50hertz - shared platform in planning  Grid connection scheduled acc. to BFO  Grid connection Baltic Eagle with system OST-2-2 and OST-2-3  Wikinger Süd will be connected to the Wikinger OSS (system OST 1-3) 60

  61. Iberdrola in Baltic Sea – future projects Windanker  Windanker area is considered in pre-draft Area Development Plan (FEP) – O-1.3  Iberdrola expects consideration of Windanker area in next auction  Area size approx. 18 km² 61

  62. Iberdrola 4 Grid connection concepts 62 62

  63. Iberdrola in Baltic Sea - Grid concepts Possible alternatives for Grid connection in Baltic Sea  Short-term solution in Germany:  Higher utilization of installed grid connection cables  Buffers identified within ongoing discussion of 2K-criteria  International solution (example UK):  Grid connection build by windfarm operator  After completion handed over to TSO in a tender (OFTO)  Higher investment costs but project is in control of timing (coordination in one hand) Baltic Hub Projects/ January 2018 / 63

  64. Vielen Dank 64