Homeland Defense and Neighborhood Homeland Defense and Neighborhood Improvement Bond Improvement Bond Oversight Board / City of Miami Oversight Board / City of Miami Capital Improvements and Transportation Capital Improvements and Transportation Department Accomplishments Department Accomplishments Homeland Homeland Series 1 Series 1 One City, One Future One City, One Future
Table of Contents Table of Contents � District 1 District 1 � � District 2 � District 2 � District 3 District 3 � � District 4 � District 4 � District 5 District 5 � � Multi � Multi – – District District � HD Series 1 HD Series 1 – – Completed, On Completed, On- -going & Future Projects going & Future Projects � by District by District � Progress of HD Series 1 Progress of HD Series 1 - - Commitment & Expenditure Commitment & Expenditure � One City, One Future
– Angel Gonzalez Angel Gonzalez District 1 – District 1 One City, One Future
th Street Improvement 50686: NW 14 th B- -50686: NW 14 Street Improvement B � Scope: Scope: Mill and resurface Mill and resurface � existing roadway, add turf block existing roadway, add turf block on swale areas, improve on swale areas, improve sidewalks, signage and sidewalks, signage and pavement markings. pavement markings. � Est. Total Cost: Est. Total Cost: $2,887,001 $2,887,001 � � Const. Completion: Const. Completion: 11/30/05 11/30/05 � � Current Status: Current Status: Completed Completed � One City, One Future
B- -30316: Fern Isle Park 30316: Fern Isle Park B � Scope: Scope: Design and construct 2 Design and construct 2 � regulation baseball/softball fields, regulation baseball/softball fields, back- -stops, spectator seating, stops, spectator seating, back children's play structure, 3,500 sf sf children's play structure, 3,500 building (concession, restroom, field building (concession, restroom, field storage), open shelters, vita course, storage), open shelters, vita course, landscape, parking lot , new turn landscape, parking lot , new turn around traffic loops, fencing, sport around traffic loops, fencing, sport and security lighting, basketball and security lighting, basketball court. Site mitigation to address court. Site mitigation to address contaminated soil, including covering contaminated soil, including covering the entire site with 2ft of clean fill, the entire site with 2ft of clean fill, retaining walls at perimeter of park retaining walls at perimeter of park and monitoring wells. and monitoring wells. � Est. Total Cost: Est. Total Cost: $2,133,417 $2,133,417 � � Const. Completion: Const. Completion: Late Winter 2007 Late Winter 2007 � � Current Status: Current Status: Design Design � One City, One Future
Grapeland Heights Park Projects Grapeland Heights Park Projects B- -60496: Site Development 60496: Site Development - - Phase 1 Phase 1 B � � Scope: Scope: Design entire park, Construct 4 Design entire park, Construct 4 Regulation Baseball/Softball fields & Regulation Baseball/Softball fields & associate park improvements and parking. associate park improvements and parking. � Est. Total Cost: Est. Total Cost: $ 8,076,926 $ 8,076,926 � � Const. Completion: Const. Completion: Late Winter 2006 Late Winter 2006 � � Current Status: Current Status: Construction Construction � B- -35828: Water Splash Theme Park 35828: Water Splash Theme Park - - Phase 2 Phase 2 B � Scope: Scope: Construction of a water theme park Construction of a water theme park � to include water slides (2), splash park, lazy to include water slides (2), splash park, lazy river, interactive play areas, concessions, river, interactive play areas, concessions, restrooms, lockers and parking. restrooms, lockers and parking. � Est. Total Cost: � Est. Total Cost: $7,000,000 $7,000,000 � Const. Completion: � Const. Completion: Fall 2007 Fall 2007 � Current Status: � Current Status: Design Design One City, One Future
Grapeland Heights Park Project Grapeland Heights Park Project B- -30105: Community Recreation Facility & 30105: Community Recreation Facility & B Parking Lot Phase 3 Parking Lot Phase 3 � Scope: Scope: Design and Build new community Design and Build new community � recreation building and asphalt parking lot. recreation building and asphalt parking lot. � Est. Total Cost: Est. Total Cost: $ 5,000,000 $ 5,000,000 � � Const. Completion: Const. Completion: Late Winter 2007 Late Winter 2007 � � Current Status: Current Status: Design Design � One City, One Future
- Johnny L Winton Johnny L Winton District 2 - District 2 One City, One Future
B- -40680: Grand Avenue Street Improvement 40680: Grand Avenue Street Improvement B � Scope: Scope: Roadway reconstruction, sidewalks with decorative Roadway reconstruction, sidewalks with decorative � pavers, decorative lighting, benches, signage and pavers, decorative lighting, benches, signage and landscaping. landscaping. � Const. Cost: Const. Cost: $4,535,011 $4,535,011 � � Const. Completion: Const. Completion: 09/30/05 09/30/05 � � Current Status: Current Status: Completed Completed � One City, One Future
B- -30322: Grand Avenue Street Improvement 30322: Grand Avenue Street Improvement B Extension from Mary to Matilda Streets Extension from Mary to Matilda Streets � � Scope: Scope: Road Improvement including Road Improvement including roadway resurfacing, sidewalk roadway resurfacing, sidewalk restoration and landscaping. restoration and landscaping. � Const. Cost: Const. Cost: $1,222,805 $1,222,805 � � Const. Completion: Const. Completion: Late Winter 2006 Late Winter 2006 � � Current Status: Current Status: Design Design � One City, One Future
Bicentennial Shoreline Stabilization Projects Bicentennial Shoreline Stabilization Projects Completed: Completed: � B B- -30293 30293 – – Phase Phase 1 1 � Under Construction: Under Construction: � B B- -30290 30290 – – Phase Phase 2 2 � Under Design: Under Design: � B B- -30310 30310 – – Phase Phase 3 3 � One City, One Future
Bicentennial Shoreline Stabilization Project Bicentennial Shoreline Stabilization Project B- -30293: Phase 1 30293: Phase 1 B � Scope: Scope: Shoreline stabilization of 2,625 ft of failing seawall. Shoreline stabilization of 2,625 ft of failing seawall. � Includes site preparation, demolition, backfill, riprap placement, t, Includes site preparation, demolition, backfill, riprap placemen filler with aggregate limerock, steel sheet piling, tree relocation, ion, filler with aggregate limerock, steel sheet piling, tree relocat and manatee protection. and manatee protection. � Est. Total Cost: Est. Total Cost: $7,350,475 $7,350,475 � � Const. Completion: Const. Completion: 08/14/05 08/14/05 � � Current Status: Current Status: Completed Completed � One City, One Future
Bicentennial Shoreline Stabilization Projects Bicentennial Shoreline Stabilization Projects B- -30290: Phase 2 30290: Phase 2 B � Scope: � Scope: Approximately 695 ft of new seawall. The seawall Approximately 695 ft of new seawall. The seawall comprises a sheet pile wall filled with stone and has a 3 ft wide e comprises a sheet pile wall filled with stone and has a 3 ft wid top x 10 ft deep reinforced concrete cap. Approximately 218 ft of f top x 10 ft deep reinforced concrete cap. Approximately 218 ft o the wall has a cantilevered reinforced concrete cap to provide a the wall has a cantilevered reinforced concrete cap to provide a 17 ft wide bay walk. 17 ft wide bay walk. � � Est. Total Cost: Est. Total Cost: $3,990,933 $3,990,933 � Const. Completion: Const. Completion: Early Spring 2006 Early Spring 2006 � � Current Status: Current Status: Construction Construction � One City, One Future
Bicentennial Shoreline Stabilization Projects Bicentennial Shoreline Stabilization Projects B- -30310: Phase 3 30310: Phase 3 B � Scope: Scope: Approximately 850 ft Approximately 850 ft � of new seawall for shoreline of new seawall for shoreline stabilization at Bicentennial stabilization at Bicentennial Park, adjacent to FEC Slip. Park, adjacent to FEC Slip. � Est. Total Cost: Est. Total Cost: $ 5,038,669 $ 5,038,669 � � Const. Completion: Const. Completion: Early Early � Spring 2007 Spring 2007 � Current Status: Current Status: Design Design � One City, One Future