highway 15 hutchinson project
play

Highway 15 Hutchinson Project Project Schedule 2017 2018 2019 - PDF document

Highway 15 Hutchinson Project Project Schedule 2017 2018 2019 2020 July Oct Jan April July Oct Jan April July Oct Jan April July Oct - Sept - Dec - Mar - June - Sept - Dec - Mar - June - Sept - Dec - Mar - June -


  1. Highway 15 Hutchinson Project Project Schedule 2017 2018 2019 2020 July Oct Jan April July Oct Jan April July Oct Jan April July Oct - Sept - Dec - Mar - June - Sept - Dec - Mar - June - Sept - Dec - Mar - June - Sept - Dec Community Involvement Preliminary Design Final Design & Streetscape/Landscape Bid Le � ng & Contractor Selec � on November 22, 2019 Construc � on Project Goals & Benefi ts Summary of Work • Smoother road surface • Complete reconstruction of Main Street/ Highway 15 through downtown • Modernize sanitary sewer, water main and storm sewer • Pavement resurfacing of Highway 15 between 5th Ave S and just south of Denver Ave • Help ensure city and state infrastructure serves their purpose for many years • Update sidewalk and pedestrian crossings along project area to meet Americans with • The City of Hutchinson views this project as Disabilities (ADA) standards an opportunity to enhance downtown and improve livibility in the central district Project booth at Dairy Days event. Project booth at Dairy Days event. Find project information and sign up to receive email updates at: mndot.gov/d8/projects/hwy15downtownhutch

  2. Highway 15 Hutchinson Project STREETSCAPE DESIGN ELEMENTS AND THEMES P RINTED STEEL SIGN PLACARD P PARKING P AINTED STEEL SQUARE TUBING Q P RINTED STEEL SIGN PLACARD HU HUTCHINSON UTC TC TC TC TC TC TC TC TC TC TC TC TC TC TC T TC TC TC TC TC TC TC TC TC TC TC C C HUTCHINSON HUTCHINSON H H DO DOWNTOWN HUTCHINSON .8 mi DOWNTOWN HUTCHINSON .8 mi STATE THEATER 1.8 mi STATE THEATER 1.8 mi CITY CENTER .6 mi CITY CENTER .6 mi EHEIM PARK EHEIM PARK .6 mi .6 mi GIRL SCOUT PARK GIRL SCOUT PARK .2 mi .2 mi I NDIANA LIMESTONE C F IELDSTONE POST F IELDS TONE POST NE lighting unit with lighting unit with parking sign parking sign wrought iron bench wrought iron bench existing color band existing color band existing lighting existing lighting existing light- existing light- existing existing trash trash detail detail units + banner units + banner ing unit ing unit receptacle receptacle Approved Items: • existing light poles to be reused - poles will be sandblasted, painted, and converted to LED fi xtures • fl ag pole banners • benches • trash receptacles • portable potted plants • wider color concrete band • bike racks Find project information and sign up to receive email updates at: mndot.gov/d8/projects/hwy15downtownhutch

  3. Highway 15 Hutchinson Project STREETSCAPE DESIGN ELEMENTS AND THEMES arches theme arches theme arches theme arches theme arches theme arches theme arches theme arches theme arches theme arches theme existing bench existing bench existing pots existing pots existing pots existing pots existing benches existing benches Explanation and Plan: • This project provides an opportunity for the • Build upon existing themes such as arch designs City of Hutchinson to enhance downtown and through the city and utilizing the concept of improve livability in the central district. portable planter pots. • Reuse quality products such as light poles and benches. Find project information and sign up to receive email updates at: mndot.gov/d8/projects/hwy15downtownhutch

  4. Highway 15 Hutchinson Project CORNER & STREETSCAPE DESIGN EXAMPLE proposed site condition proposed site condition Design Intent: • Extended curb cuts aka “bump outs” will be introduced at select intersections. - Improves safety for pedestrians crossing the street. • 32” wide color band (same as existing) existing site condition existing site condition - The color will remain consistent with existing color in downtown area. • Movable planter pots - The texture will not be the same, a different - These planter pots can be relocated in the winter texture and jointing pattern will be introduced in months to allow for snow removal. these areas. - Planter pot designs, shapes, and sizes will be reviewed during future project development and presented this fall. Find project information and sign up to receive email updates at: mndot.gov/d8/projects/hwy15downtownhutch

  5. Highway 15 Hutchinson Project STOREFRONT & STREETSCAPE DESIGN EXAMPLE proposed site condition proposed site condition Design Intent: • 32” wide concrete color band (same as existing) • Movable planter pots - The color will remain consistent with existing color - Rectangular planters are proposed, in addition to in downtown area. the current type of planter pots, to be set along - The texture will not be the same as existing. the back of the walk next to buildings at identifi ed A different texture and jointing pattern will be locations introduced in these areas. - Rectangular planters will be variable height to avoid blocking window fronts - Rectangular planters and planter pots can be relocated in the winter months to allow for snow removal - Rectangular planters and planter pot designs and sizes will be reviewed during future project development. Find project information and sign up to receive email updates at: mndot.gov/d8/projects/hwy15downtownhutch

Recommend


More recommend