08/09/2017 FEI 2016 R ATE D ESIGN E XHIBIT A2-18 Highlights of Elenchus’ Reports: FEI’s COSA FEI’s Rate Design John Todd, Michael Roger September 12, 2017 9/8/2017 Report on FEI’s COSA Elenchus Analysis: FEI follows traditional COSA approach: Functionalization Categorization Allocation Direct Allocation Data Used in COSA studies Frequency of COSA studies FEI’s objectives are generally consistent with generally accepted principles 2 9/8/2017 1
08/09/2017 Observations on FEI’s COSA Methodology Generally consistent with standard practices, except: Mt. Hayes LNG storage treatment reflects dual purpose facility (section 4.1.3, page 10) Distribution demand related costs are usually allocated using non ‐ coincident peak (section 4.3.4, page 17) Tilbury expansion project levelizing costs using 10 year horizon not consistent with standard practice (section 4.5.10, page 22) PLCC adjustment for Fort Nelson Minimum System study should reflect Fort Nelson’s own circumstances (section 5.2.1, page 24) 3 9/8/2017 Report on FEI’s Rate Design Section 2 Rate shock Section 3 to 6 Rate Design for Customer Classes and Other Rate Design Matters Section 7 R:C Ratio Range of Reasonableness Sections 8, 9 Transportation and By ‐ pass Rates Sections 10, 11 Crisis Intervention and Disconnection for Residential Customers 4 9/8/2017 2
08/09/2017 R/C Ratio Range of Reasonableness FEI uses 90% to 110% range Utility Range of Reasonableness AltaGas 95% to 105% ATCO 95% to 105% Union Gas Close to unity Enbridge Close to unity Centra Gas 100% SaskEnergy 95% to 105% Elenchus Rate Design Report, Table 4, page 33 5 9/8/2017 Margin to Cost Ratios No other utility surveyed uses FEI’s term M:C ratio FEI’s M:C ratio excludes pass through costs R:C ratio widely used and accepted R:C ratio often excludes pass ‐ through costs I.e., same as FEI’s M:C ratio FEI’s M:C ratio has merit as primary reference The appropriate range of reasonableness is wider when pass ‐ through costs are excluded 6 9/8/2017 3
08/09/2017 Erratum IR Responses Report # 1 BCUC # 4.1, line 26, “ lamount” should be “ amoun t” BCUC # 4.2, line 23, delete “ accurate” CEC # 15.1, line 21, “ my” should be “ may” ICG # 1.1, line 17, add “ and BCUC IR 9.5” 7 9/8/2017 4
Recommend
More recommend