Hanford – Plateau Remediation Project Update Presented by: Connie Simiele March 2016 CHPRC-02843
Plutonium Finishing Plant Closure Project – Success/Challenges Challenges • Validate and clearly define end point criteria • DSA • Radiological/IH • Safety Performance • Demolition Requirements PFP employees in Level B suits working on HA-9A CHPRC-02843 2
W&FMP Goals/Challenges FY 2016 Goals • Treat/repackage 280 m3 of TRU mixed waste and/or mixed LLW - Complete • Complete Engineering Alternatives Study for Hanford TRU mixed waste (M-91) – On Schedule • Complete construction of the WESF K3 ventilation system – On Schedule • Prepare Cs/Sr Extended Storage Cask system Design/Fabrication RFP and Issue – On Schedule • Submitted RCRA Part B Permit Application to Ecology Challenges • Temporary Authorization approval for WESF • TPA Milestone negotiations • WDOE/EPA Inspection Letters Loading TRUM for Repack CHPRC-02843 3
Transition Washington Closure Hanford Transition The WCH contract is coming to a close. All remaining scope is being transferred to CHPRC to be completed. CHPRC and WCH have received a Contract Modification to initiate transition. Scope will include: • Continued operations of Environmental Remediation Disposal Facility (ERDF). Expect transition by 9/1/16. • Complete cleanup of burial ground 618/10 and Surveillance & Maintenance for burial ground 618-11. Expect transition by 9/1/16. • Cleanup of waste site beneath and D&D of 324 Building. Transition by 4/30/16. CHPRC-02843 4
Recommend
More recommend