GREAT VALLEY SCHOOL DISTRICT DISTRICT-WIDE FACILITY STUDY & MASTER PLAN FINANCE COMMITTEE DISCUSSION 04 MAY 2020 1
K-5 ELEMENTARY SCHOOLS CURRENT capacity analysis OPERATING CAPACITY – TARGET 90% 2019 OPERATING CAPACITY CURRENT USE CAPACITY FUNCTIONAL CAPACITY CHARLESTOWN ES 80% 73% GWES Functional Capacity GENERAL WAYNE ES 87% 69% repurposes rooms internally for program to capture K.D. MARKLEY ES 84% 81% additional capacity SUGARTOWN ES 92% 85% The K-5 Elementary Schools can individually and together accommodate the current enrollments GREAT VALLEY SCHOOL DISTRICT 2
6-8 MIDDLE SCHOOL CURRENT OPERATING capacity analysis CAPACITY – TARGET 85% 2019 OPERATING CAPACITY PDE CAPACITY FUNCTIONAL CAPACITY GREAT VALLEY MS 86% 122% Great Valley Middle School is currently over capacity CURRENTLY NEED 14 ADDITIONAL GENERAL INSTRUCTIONAL SPACES (14 x 28 STUDENTS/CLRM = CAPACITY INCREASE OF 392) TO ACHIEVE THE TARGETED 85% UTILIZATION AT THE MIDDLE SCHOOL ( Does not include space needs for additional support rooms such as Art, Music, Special Education, etc., plus spaces needs at the Cafeteria) GREAT VALLEY SCHOOL DISTRICT 3
9-12 HIGH SCHOOL CURRENT OPERATING capacity analysis CAPACITY – TARGET 80% 2019 OPERATING CAPACITY GREAT VALLEY HS 60% Great Valley High School currently has additional space CURRENTLY HAS APPROX. 18 CLASSROOMS OF SURPLUS CAPACITY (540 SEATS AT 30 STUDENTS/CLRM. OF AVAILABLE CAPACITY) TO BE WITHIN THE TARGETED 80% UTILIZATION AT THE HIGH SCHOOL ( Does not include space needs for additional support rooms such as Art, Music, Special Education, etc., plus spaces needs at the Cafeteria) GREAT VALLEY SCHOOL DISTRICT 4
MASTER PLANNING – CONCLUSIONS REACHED master planning 1. ELEMENTARY SCHOOLS – As a whole, are at capacity, however renovation to “Middle School” type spaces within General Wayne ES would allow for increased capacity 2. MIDDLE SCHOOL – Is currently over capacity. If the building is utilized as originally planned then it greatly exceeds capacity 3. HIGH SCHOOL – Has additional capacity within GREAT VALLEY SCHOOL DISTRICT 5
MASTER PLANNING - TWO OPTIONS master planning 1. Delay activating the master planning, provide short-term solutions and “weather the storm”. Possible short-term solutions presented as part of this presentation. 2. Begin the planning process in order to be underway to manage the student capacity issues. GREAT VALLEY SCHOOL DISTRICT 6
MASTER PLANNING – DELAYED master planning Possible recession duration according to 24 months some economists 18 months Planning, Design and Permitting Time 18-24 months Construction Time TOTAL TIME UNTIL MASTER PLAN 60-66 month s IMPLEMENTATION COULD BE RECOGNIZED TO ADDRESS CAPACITY ISSUES GREAT VALLEY SCHOOL DISTRICT 7
WHAT WILL GVSD LOOK LIKE IN FIVE YEARS IF WE DO NOTHING 8
enrollment projections DISTRICT-WIDE ENROLLMENT PROJECTIONS IN 5 YEARS +350 students +203 students +273 students GREAT VALLEY SCHOOL DISTRICT 9
K-5 ELEMENTARY SCHOOLS PROJECTED capacity analysis OPERATING CAPACITY – TARGET 90% Existing and Functional Use Compared to Projected Enrollments - By School and Grade Level PRIMARY SCHOOLS GRADE E BUIL ILDIN DING 2025- 2025-26 DI 26 DI CURRENT U T USE CURRENT U T USE FUNCT NCTIONA NAL FUNCT NCTIONA NAL STR TRUCTU TURE ENR NROLLME MENT NT CAPACIT ITY Y PROJECTE TED USE C CAPACIT ITY Y USE SE PROJECTI TION (2019-20) (2019- 20) OPERATI TING (2019- (2019-20) 20) PROJECTE TED CAP APAC ACITY OPERATI TING CAP APAC ACITY K-5 Charlestown ES 375 454 83% 502 75% K-5 General Wayne ES 722 654 110% 110% 820 88% K-5 Kathryn D. Markley ES 658 686 96% 96% 712 92% 92% K-5 Sugartown ES 618 554 112% 112% 600 103% 103% TOTAL AL AV AVERAG AGE K K-5 C CAP APAC ACITY 2373 2373 2348 2348 101% 101% 2634 2634 90% 90% General Wayne Elementary School The Functional Capacity includes converting former “Middle School” program areas to additional classroom space Sugartown and K.D. Markley Elementary Schools • Sugartown, and to a lesser extent K.D. Markley, will be over capacity in 5 years based on the projected enrollments 10
ELEMENTARY SCHOOL SOLUTIONS IN 5 YEARS No District Changes master planning Operating as the buildings currently do, solutions to address capacity may include: Renovations/Additions General Wayne: Convert “Middle School-type” spaces to additional instructional space Redistrict K-5 to re-apportion populations Modular classrooms in lieu of renovations to GWES or in lieu of re-districting GREAT VALLEY SCHOOL DISTRICT 11
SECONDARY SCHOOL PROJECTED capacity analysis OPERATING CAPACITY Existing and Functional Use Compared to Projected Enrollments - By School and Grade Level SECONDARY SCHOOLS GRADE E BUIL ILDIN DING 2025-26 DI 2025- 26 DI CURRENT U T USE CURRENT U T USE FUNCT NCTIONA NAL FUNCT NCTIONA NAL STR TRUCTU TURE ENR NROLLME MENT NT CAPACIT ITY Y PROJECTE TED USE C CAPACIT ITY Y USE SE PROJECTI TION (2019-20) (2019- 20) OPERATI TING (2019- (2019-20) 20) PROJECTE TED CAP APAC ACITY OPERATI TING CAP APAC ACITY 6-8 Great Valley MS 1275 1306 98% 98% 876 146% 146% 9-12 Great Valley HS 1610 2228 72% - - Middle School – Target 85% The Middle School is currently over capacity and will further exceed it’s capacity in 5 years based on projected enrollments High School – Target 80% The High School can accommodate the projected 5-year enrollments and would require no changes as it currently operates GREAT VALLEY SCHOOL DISTRICT 12
MIDDLE SCHOOL SOLUTIONS IN 5 YEARS No District Changes master planning Operating as the building currently does, solutions to address capacity may include: Additions Add 22 general instruction classrooms (22 x 28 students/classroom = 616 seats; functional capacity 876 + 616 = 1492 x 85% occupancy = 1268 capacity to accommodate projected enrollments in 5 years) Plus add classroom space for learning support or specials rooms Plus expand kitchen/cafeteria for increased population Modular classrooms in lieu of additions Same notes as above Move 8 th grade into the High School (Grades 8-12) Although the number of 8 th grade general instruction classrooms and learning support classrooms can be accommodated in the high school, the high school department structure would integrate 8 th grade throughout the school, or modifications to the high school would be required to accommodate the 8 th grade teams including Science. Specials, kitchen/cafeteria and athletics would need to be addressed to accommodate the increased population. Note: teachers would likely not have their own classrooms. The function would need to be modified to act as a “community college” setting where every space is programmed the majority of the day. GREAT VALLEY SCHOOL DISTRICT 13
GREAT VALLEY SCHOOL DISTRICT THANK YOU!
Recommend
More recommend