George Washington Murals June 11 2019
2 Intervention Scale CONSERVE INTERPRET OBSCURE REMOVE Textile Solid Painting Covering Panels (Curtain) (Fabricated) SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2
3 Additional Information ● Feasibility Assessment, not a Design. ● Costs are Estimates Only.
4 4 TEXTILE SCOPE OF WORK ● Engineering design to COVERING determine the method of attachment for the curtain track above the murals. ● Architectural design for selection of curtain color and design. ● Protection of murals in vicinity Project Cost $375k of track installation. Duration Up to 16 ½ months ● Installation of track. ● Touch up painting and repair of area affected by track system installation. ● Installation of curtains.
5 5 SCOPE OF WORK Solid Panels ● Erection of scaffold to access the murals. ● Installation structural elements at top and bottom of mural panels. ● Installation of custom acoustic panel framework. ● Touch-up painting and repair of Cost Estimate $645 - $825k area affected by track system installation. Duration Up to 14 months ● Installation of acoustic panels.
6 6 SCOPE OF WORK PAINTING ● Erection of scaffold to access the murals. ● Application of a primer to the mural surface. ● Filling of surface irregularities after priming. ● Second application of primer over filled areas. ● Application of interior coating. Cost $600k + ● Second application of coating. Duration 3 Years +
7 Questions?