Fulton Theatre’s BREAKOUT PERFORMANCE CAMPAIGN A campaign to evolve, elevate and inspire
CURRENT VIEW (King and Prince Sts.) • The Breakout Performance Campaign is an effort to expand our audience services, engage our community, and update the infrastructure of the theatre • Phase I (King St.) began September 2018 with an estimated completion of October 2019 • The brick work will be changed to reflect the original design of the building to be uniform with the rest of the building.
KING STREET AT NIGHT • Phase I will include – 26 Actor Apartments – Façade work – 3 retail spaces on the first floor of King St. (109, 111, 113)
PRINCE STREET
• Phase II ( North side), will begin late October 2019, immediately after Phase I conclusion • Close the driveway between the Education (Interiors) building and the main building with a glass tower to expand lobby space
ATRIUM LOBBY and BAR • View from the glass tower entrance from Prince St. • Bar will be moved from its current location (left of staircase in rendering) to glass tower lobby
ATRIUM LOBBY- looking at Prince St • View from the glass tower lobby bar to the Prince St. entrance • NOTE: Elevator has been moved from the location in the rendering.
TWENTY-SEVEN NEW RESTROOMS • New lobby will include: – 13 new women’s room stalls – 13 new men’s room stalls – 1 gender neutral/family restroom
PRODUCER’S CIRCLE LOUNGE • Producer’s Circle is the backbone of our support • Full bar and single bathroom in the lounge • Gathering space for smaller events, such as Thirsty for History (Lancaster History)
WATER STREET • On site performance studio rehearsal and event space • 2 stories – 1 st floor — dressing rooms – 2 nd and 3 rd studio space
PERFORMANCE STUDIO- REHEARSAL • Large enough space to accommodate our larger mainstage productions • Can also be used as a performance space
PERFORMANCE STUDIO – EVENT • Easily changed into an event space • Accommodates up to ~250 • Additional gathering space for the community
WATER STREET AT NIGHT