folly road multi use path
play

FOLLY ROAD MULTI-USE PATH Ellis Creek to Prescott Street CONTENTS - PowerPoint PPT Presentation

FOLLY ROAD MULTI-USE PATH Ellis Creek to Prescott Street CONTENTS Review Alternatives Challenges Areas of Interest Decision Matrix Recommendation REVIEW FUNDING SEGMENT OPTIONS $ 9.450M $2.675M Cost of Sidewalk Cost of Shared-Use


  1. FOLLY ROAD MULTI-USE PATH Ellis Creek to Prescott Street

  2. CONTENTS Review Alternatives Challenges Areas of Interest Decision Matrix Recommendation

  3. REVIEW FUNDING SEGMENT OPTIONS $ 9.450M $2.675M Cost of Sidewalk Cost of Shared-Use Section Roads Length Completion Path TOTAL TARGETED + TOTAL AVAILABLE AVAILABLE FUNDS FUNDS 1 Ellis Creek to Prescott Street 6,800’ $ 2.3M $ 5.3M Prescott Street to George L. 2 1,800’ $ 1.0M $ 2.2M Griffith Boulevard George L. Griffith Blvd to 3 2,050’ ---- $ 1.6M SEGMENT 1 Grimball/Fort Johnson Road Grimball/Fort Johnson Road 4 3,600’ ---- $ 2.5M to Rafeal Lane MOST MOST Rafeal Lane to Sol Legare 5 8,800’ $ 2.3M $ 4.3M Road traffic accidents business Total 23,050’ $ 9.7M $ 15.9M (2015-2017) density WHAT WE’VE DONE Grant application for funding 2 nd 2 nd • Defined first priority • population household Completed existing condition survey • density density Developed alternatives •

  4. A L T 5’ Sidewalk 1 5’ 12’ ~2’ ~3.5’ curb & sidewalk bike lane travel lane gutter A L T 8’ Sidewalk 2 12’ 8’ ~2’ ~3.5’ curb & sidewalk bike lane travel lane ALTERNATIVES gutter A L T Multi-Use Path 3 + Bike Lane 12’ 5’ 12’ ~2 ~3.5’ curb & multi-use path planting bike lane travel lane gutter A L T Multi-Use Path, 4 No Bike Lane 12’ 5’ ~2’ 12’ ROW Line curb & planting travel lane multi-use path gutter

  5. CHALLENGES

  6. RIGHT-OF-WAY Before 1962 Folly Road was two • lanes with a 50’ ROW, then SCDOT expanded to a ~70’ ROW Generally 35’ feet along the west • side of Folly Road 32.5’ pavement • 1.5’ curb & gutter • Approximate cost of ROW purchase • = $40/sq ft

  7. UTILITIES/STORMWATER Utility poles are a major challenge • along the corridor for each alternative There will not be a significant impact • on below ground utilities Telephone pedestals, gas • monuments, backflow preventers would need to be relocated Existing site drainage would be • impacted for 3 businesses Eliminating existing bike lane • requires upgrades to Folly Road drainage system

  8. MONUMENTS/SIGNAGE Most businesses along Folly Road • have signs that are typically at ROW edge Signs are expensive and difficult • to relocate Relocation Costs: • Monuments signs: $10,000 • Post signs: $5,900 • Traffic signs: $500 •

  9. SEGMENT 1 Areas of Interest Ellis Creek to Prescott Street Sumter’s Doctor’s Landing Care Live Oak 4 1 Roadside Seafood 2 3

  10. SEGMENT 1 Doctor’s Care Ellis Creek to Prescott Street Doctor’s Care 1

  11. A L T 5’ Sidewalk Doctor’s Care 1 5’ Sidewalk Existing Conditions

  12. A L T 8’ Sidewalk Doctor’s Care 2 8’ Sidewalk Existing Conditions

  13. A L T Multi-Use Path + Bike Lane Doctor’s Care 3 Multi-Use Path + Bike Lane Existing Conditions

  14. A L T Multi-Use Path, No Bike Lane Doctor’s Care 4 Multi-Use Path, No Bike Lane Existing Conditions

  15. SEGMENT 1 Live Oak Tree Ellis Creek to Prescott Street Live Oak 2

  16. A L T 5’ Sidewalk Live Oak Tree 1 5’ Sidewalk Existing Conditions

  17. A L T 8’ Sidewalk Live Oak Tree 2 8’ Sidewalk Existing Conditions

  18. A L T Multi-Use Path + Bike Lane Live Oak Tree 3 Multi-Use Path + Bike Lane Existing Conditions

  19. A L T Multi-Use Path, No Bike Lane Live Oak Tree 4 Multi-Use Path, No Bike Lane Existing Conditions

  20. SEGMENT 1 Roadside Seafood Ellis Creek to Prescott Street Roadside Seafood 3

  21. A L T 5’ Sidewalk Roadside Seafood 1 5’ Sidewalk Existing Conditions

  22. A L T 8’ Sidewalk Roadside Seafood 2 8’ Sidewalk Existing Conditions

  23. A L T Multi-Use Path + Bike Lane Roadside Seafood 3 Multi-Use Path + Bike Lane Existing Conditions

  24. A L T Multi-Use Path, No Bike Lane Roadside Seafood 4 Multi-Use Path, No Bike Lane Existing Conditions

  25. SEGMENT 1 Sumter’s Landing Ellis Creek to Prescott Street Sumter’s Landing 4

  26. A L T 5’ Sidewalk Sumter’s Landing 1 5’ Sidewalk Existing Conditions

  27. A L T 8’ Sidewalk Sumter’s Landing 2 8’ Sidewalk Existing Conditions

  28. A L T Multi-Use Path + Bike Lane Sumter’s Landing 3 Multi-Use Path + Bike Lane Existing Conditions

  29. A L T Multi-Use Path, No Bike Lane Sumter’s Landing 4 Multi-Use Path, No Bike Lane Existing Conditions

  30. DECISION MATRIX CHALLENGE UTILITIES/ COST MONUMENTS/ ROW STORMWATER ESTIMATE SIGNAGE SEGMENT 1 A L T Ellis Creek to Prescott Street 1 5’ Sidewalk A L T RISK PROFILE 8’ Sidewalk 2 HIGH LIKELIHOOD A L T Multi-Use Path MEDIUM 3 + Bike Lane LOW A L T Multi-Use Path 4 LOW No Bike Lane MEDIUM HIGH IMPACT TO COSTS

  31. DECISION MATRIX CHALLENGE UTILITIES/ COST MONUMENTS/ ROW STORMWATER ESTIMATE SIGNAGE SEGMENT 1 A L T Ellis Creek to Prescott Street $ 978,162 1 5’ Sidewalk A L T RISK PROFILE 8’ Sidewalk $ 1,425,196 2 HIGH LIKELIHOOD A L T Multi-Use Path MEDIUM $ 3,294,520 3 + Bike Lane LOW A L T Multi-Use Path $ 4,006,201 4 LOW No Bike Lane MEDIUM HIGH IMPACT TO COSTS

  32. RECOMMENDATION A L T 8’ Sidewalk 2 12’ 8’ ~2’ ~3.5’ curb & sidewalk bike lane travel lane gutter

Recommend


More recommend