  1. Feasibility Study for Greystones Golf Club November 2016

  2. CLIENT Greystones Golf Club TEAM NODA Architecture and Interiors TORQUE Structural Engineers Scollard Doyle Cost Consultants

  3. • Last refurbished 25 years ago • 10 year plan to meet the future needs of the members Opportunities : • Attractive clubhouse set in lovely grounds in the Burnaby • Enhance the appeal for members and guests • Increase footfall for lunch, weekend occasions and private functions • Improve facilities for everyone, young and old

  4. • • Overhaul main lounge to maximize its Redesign bar to better use the space attractive views over course and develop it into a venue for lunch/dinner and after match drinks • Create venue to attract outside guests and events

  5. • • Create a private members bar, separate Enhance and enlarge the balcony to take to the lounge better advantage of the views to the course • Barbecue area for summer evenings • Enlarge pro shop Analysis of Existing Space

  6. WC’S Members Area/Dining SNOOKER ROOM STORE BAR EXISTING BALCONY EXISTING LOUNGE

  7. Option 1a: • Refurbishment of main lounge • and dining space • Create New WC block

  8. Option 1a: • Refurbishment of main lounge • and dining space • Create New WC block Option 1b: • Create Temporary members bar • Snooker room relocation to • Ground Floor

  9. Option 1a: • Refurbishment of main lounge • and dining space • Create New WC block Option 1b: • Create Temporary members bar • Snooker room relocation Option 2: • Complete New members bar • Add New extended terrace

  10. Option 1a: • Refurbishment of main lounge • and dining space • Create New WC block Option 1b: • Create Temporary members bar • Snooker room relocation Option 2 i. New members bar ii. New extended terrace First floor Level – Option 3 i. Entrance area upgrades & ii. platform lift installation iii. Circulation space refurbishments

  11. Option 1a: • Refurbishment of main lounge • and dining space • Create New WC block Option 1b: • Create Temporary members bar • Snooker room relocation Option 2 i. New members bar ii. New extended terrace First floor Level – Option 3 i. Entrance area upgrades & ii. platform lift installation iii. Circulation space refurbishments Option 4: • i. Add Pro-shop extension

  12. First Floor Level – Option 1a i. Dining, lounge and bar refurbishment ii. New WC block

  13. Bar Option 1 Bar Option 2 Bar Option 3 • Main bar area to have a lighter overall palette, with feature lighting, comfortable leather stools and tiling around bar area. • All 3 options are selected and considered based on the material durability and as part of the overall design. Option 1a_Main Bar

  14. • Dining area to have a lighter, brighter palette to be featured next to large existing windows. • Included will be light-mid wood tones, soft upholstered chairs, new wall finishes and feature pendant lighting. • We intend to reuse existing tables within the design as well as existing chairs. Both will blend seamlessly into Option 1a_Dining Space overall design.

  15. • The design includes has fixed and stand alone banquettes. • We intend the overall banquette style to remain constant throughout the space while some details may be adapted to each unique area. • With traditional buttoned banquette. Soft leathers, coordinating upholstery and throw pillows complete the overall banquette design. Option 1a_Lounge Area

  16. Herringbone timber floor Grey hexagon tiles at bar Lounge Conceptual Rendering Feature brass pendant lighting Grey plaid carpet in lounge Option 1a_Lounge Area

  17. We propose to move the toilet block to a centralized location on the 1 st floor. This allows for the following: • Ease of access from all areas on the 1 st floor • Each space can be used separately without impeding access to WC • Allows for more floor space to be given to the dining and new members bar area. • Accessible WC incorporated into overall WC block, satisfying accessible WC regulations. • New WC block pricing includes all new plumbing, radiators Men’s WC conceptual Women’s WC conceptual and extract and drainage systems. It also includes for new sanitary ware, lighting and toilet cubicle systems and new floor, wall and ceiling finishes throughout. Option 1a_New WC Block

  18. First Floor Level – Option 1b i. Temporary Members Bar ii. Snooker Room Relocation

  19. First Floor Level – Option 2 i. New members bar ii. New extended terrace

  20. The members bar to have a contrasting palette to the rest of the space to create a more intimate club feel. • Darker colours and finishes with mid-dark wood tones and buttoned leather upholstery. • Furniture to be a modern take on traditional styles. New members bar conceptual rendering • The darker palette creates a separate sense of space while still using the same design details allowing the members bar to feel connected to the club but still have its Option 2_New Members Bar own identity.

  21. Proposed stair design Proposed clear glazing for Proposed grey render for Conceptual proposal for terrace furniture with incorporated wrap around balustrade. sides and white render for and palette. Exterior grade light greys and lighting for evening underside of terrace whites contrasting with teak furniture and plantings. and night time. extension. Option 2_Terrace Extension New terrace views conceptual rendering

  22. We propose a fixed, retractable awning with integrated lighting wrapping around the terrace extension. This type of awning would provide protection from the weather when needed, and allows light and sun when retracted. New terrace extension conceptual rendering

  23. Proposed platform lift First floor Level – Option 3 i. Entrance area upgrades & platform lift installation ii. Circulation space refurbishments

  24. Retail design concept for extended pro shop First Floor Level – Option 4 i. Pro-shop extension

  25. Option 1a: 529,000 • Refurbishment of main lounge • and dining space • Create New WC block Option 1b: 131,000 • Create Temporary members bar • Snooker room relocation Option 2 440,000 i. New members bar ii. New extended terrace First floor Level – Option 3 130,000 i. Entrance area upgrades & ii. platform lift installation iii. Circulation space refurbishments Option 4: 66,000 • i. Add Pro-shop extension