Commencing development of Europes largest uranium supplier World class development creating sustainable jobs, rejuvenating a local community and fueling Europes clean energy future May 2016 Major shareholder backs Berkeley Energia with


  1. Commencing development of Europe’s largest uranium supplier World class development creating sustainable jobs, rejuvenating a local community and fueling Europe’s clean energy future May 2016

  2. Major shareholder backs Berkeley Energia with financing at a premium Major shareholder Resource Capital Funds (RCF) has demonstrated its strong support for the Company with a royalty financing and by increasing its stake in the Company with an equity financing issued at a premium to the current share price. The US$10 million financing allows the Company to progress major infrastructure work and exploration programmes ahead of the main development financing which is expected to be undertaken during the second half of 2016. The financing comprises of the issue of US$5 million worth of ordinary shares in the Company at a price of 32 pence per share which represents a premium of approximately 9% to the 10-day VWAP and 15% to the 30-day VWAP, highlighting the strength of the project and its robust economics even at the current low uranium prices. RCF has also agreed to provide an additional US$5 million though the sale of a 0.375% fully secured net smelter royalty over the project, subject to final documentation. Managing Director Paul Atherley commented: “The funding allows us to undertake the initial infrastructure development ahead of the commencement of main construction and financing later in the year. In addition it will allow us to target a number of the high value exploration targets looking for additional Zona 7 style deposits over the next few months. The results of the optimization studies being undertaken as part of the definitive feasibility study to be published in the next couple of months are expected to demonstrate the Salamanca project’s robust economics even at the current low uranium prices.”

  3. RENEWABLES ALONE CANNOT DELIVER OUR CLEAN ENERGY FUTURE THE UK WILL NEED ANOTHER 32,000 WIND TURBINES TO MEET THE 2050 CARBON TARGETS IT ’ S NOT A QUESTION OF RENEWABLES OR NUCLEAR BUT RENEWABLES AND NUCLEAR Source: Department of Energy and Climate Change

  4. WITH ONLY ONE URANIUM MINE WITH ONLY ONE URANIUM MINE EUROPE’S EUROPE’S SECURITY OF SUPPLY IS CRITICAL SECURITY OF SUPPLY IS CRITICAL 160 160 +300 +300 “ New Fleet of Nuclear Reactors ” Source: World Nuclear Association Amber Rudd November 2015

  5. THE SALAMANCA PROJECT HAS ENOUGH RECOVERABLE URANIUM TO POWER THE WHOLE OF THE UK’S ELECTRICITY NEEDS FOR FIVE AND HALF YEARS David Talbot Dundee Securities September 2015

  6. HIGHLY EXPERIENCED MANAGEMENT TEAM HAS DEVELOPED THREE MAJOR MINES IN SPAIN

  7. LOCAL COMMUNITY SUFFERING DEPOPULATION AND INTER-GENERATIONAL UNEMPLOYMENT

  8. SPENDING US$100 MILLION AND REJUVENATING THE LOCAL COMMUNITY

  9. SALAMANCA IS A HIGH-IMPACT PROJECT Bring into production = NPV £1.31 per share (at current Uranium prices) Strategically located world class asset highly geared to US$ Uranium price Potential to get much bigger with Exploration targeting multiple Zona 7’s

  10. SALAMANCA HAS A RARE COMBINATION OF ULTRA-LOW CAPITAL AND OPERATING COSTS “ Best in class “Optimization studies aiming for capital cost per pound” lowest cost producer” Source for Non-Berkeley Figures: Dundee Securities, Public Company Estimates Source for Non- Berkeley Figures: Cantor Fitzgerald “London Marketing” September 2015 Berkeley Initial Capital Cost for Salamanca of US$81m (refer Pre-Feasibility Study announcement 4 Nov 2015) Berkeley Operating Cost of US$15.60 during steady state of operations (refer Pre-Feasibility Study announcement 4 Nov 2015)

  11. ZONA 7 OPERATING COSTS AND ESTABLISHED INFRASTRUCTURE MAKE THE DIFFERENCE

  12. CASH COSTS ARE HALF THE CURRENT SPOT PRICE STRONG CASH FLOW AT EVEN DOWNSIDE CASE

  13. CHINA AND INDIA SPENDING US$227 BILLION BUILDING UP TO 14 NEW REACTORS A YEAR

  14. THE ONLY LARGE-SCALE LOW-COST PROJECT BEING DEVELOPED IN 2016

  15. TARGETING MULTIPLE HIGH IMPACT EXPLORATION ZONA 7’S ZONA 7 10 kms NEW HIGH GRADE INTERSECTIONS PROCESS PLANT

  16. EXPLORATION PROGRAMME TARGETING MULTIPLE ZONA7’S

  17. BERKELEY SHARE PRICE (BKY.L) Severstal bid £1.23 Near term share e price e in October 2010 INFLUENTIAL targets: (pre ZONA 7 discovery) SHAREHOLDERS Paul Smith WH Ireland £1.0 .00 Phil Swinfen Numis £1.0 .00 River and Mercantile David Talbot Dundee £0.90 Blackrock Matt Keane, Argonaut £1.1 .10 Anglo Pacific Group Resource Capital Fund Hadron First State Commonwealth Bank Australia Management

  18. “ The Salamanca Project is rapidly becoming one of the world ’ s best undeveloped, near production uranium assets ..this is a very exciting story.” Julian Treger CEO Anglo Pacific (BKY major shareholder) David Talbot Dundee Securities lists BKY as #1 Pick 2016 Rated by Argonaut as one of the “best undeveloped projects” with an IRR of 93%.

  19. Information Slides

  20. THE URANIUM PRICE RISE - WILL BE VIOLENT Rob Chang Cantor Fitzgerald June 2015 Dave Talbot Dundee Securities September 2015 Uranium Contracted Uranium Price 2018-2021 US and EU uncovered utility positions quadruple to 83% USDOE/EIA and ESA reports (data current as of 31 December 2014)

  21. Executive Team Key information Paul Atherley – Managing Director Mining engineer and MBA with over 25 years industry operating experience. Board of Directors Previously MD of Leyshon Resources based in Beijing and formerly Executive Director of the Investment Bank arm of HSBC Australia. Was Chairman of the Ian Middlemas Chairman British Chamber of Commerce in China, Vice Chairman of the China Britain Paul Atherley Managing Director Business Council and served on the EU Energy Working Group in Beijing. James Ross Director Rob Behets Director Francisco Bellon – GM Operations Mining Engineer with further specialisation in mineral processing and metallurgy with over 20 years experience in both operational and project management roles CAPITAL STRUCTURE in Europe, South America and West Africa. Has developed and operated numerous mines in Spain. Shares on Issue 181.8m Unlisted Options & Rights 19.5m Market Cap (undiluted @ £0.25) £ 45.5m Javier Colilla – Senior Vice President Corporate Cash Position (at 31 Dec 15) A$ 8.4m Economist and Lawyer with more than 25 years experience in the Spanish and international mining industry. Held several executive management roles during a long career with Rio Narcea Gold Mines and was responsible for the permitting of four mines in Spain & one in Mauritania. Holds an MBA. Hugo Schumann – Commercial Manager Formerly a management consultant before moving into the natural resources sector, initially as part of an investing team in London and then working in corporate development functions for listed mining and energy companies. Holds an MBA from INSEAD, is a CFA Charterholder.

  22. Salamanca production profile 6.0 5.0 4.0 (Mlb U 3 O 8 ) 3.0 2.0 1.0 - 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Retortillo Zona 7 Alameda

  23. Pre-feasibility capital & operating costs Retortillo up-front capex Life of Mine Operating Cash Costs Cost (US$/lb U 3 O 8 ) Cost (US$ m) Description Zona 7 Retortillo Alameda Mining (pre-strip) 7.6 4.95 Mining 12.72 8.40 Processing 36.4 6.04 Processing (including ripios backfill) 11.10 9.02 Plant Related Infrastructure 7.1 0.98 G&A 1.93 1.84 11.97 Subtotal by Area 25.75 19.26 Waste Dumps, Water Management, etc. 5.9 17.51 Total Ave Operating Costs (LOM) Other Capex 6.4 G&A 1.9 Indirect Costs 16.3 Total Upfront Capital Cost - Retortillo 81.4 All figures reported with nominally ± 20% accuracy

  24. Exploration targets

  25. Mineral resources Deposit Resource Tonnes U 3 O 8 U 3 O 8 Name Category (Mt) (ppm) (Mlbs) Note: the Pre-Feasibility Study and Production Target were based solely on Retortillo Measured 4.1 498 4.5 Indicated and Measured resources at Indicated 11.3 395 9.8 Retortillo, Zona 7 and Alameda and excluded all Inferred resources and Inferred 0.2 368 0.2 satellite projects Total 15.6 422 14.5 Zona 7 Indicated 17.1 735 27.8 Inferred 4.9 333 3.6 Total 22.1 645 31.4 Alameda Indicated 20.0 455 20.1 Inferred 0.7 657 1.0 Total 20.7 462 21.1 Gambuta Inferred 12.7 394 11.1 Retortillo Satellites Inferred 2.8 492 3.0 Alameda Satellites Inferred 9.1 472 9.5 Salamanca Project Measured 4.1 498 4.5 Indicated 48.4 540 57.5 Inferred 30.5 422 28.4 Total 83.0 495 90.5 All figures are rounded to reflect appropriate levels of confidence. Apparent differences occur due to rounding.