Engineering for a Better Future ENKA IN GEORGIA
PROJECTS in georgia of 9 2
Projects ın Georgıa Commence Completion Date Contract Project Location Client Details Date Price SCPX Early Works & Multiple Locations – South Caucasus Pipeline February 2014 October 2019 US$ 878,000,000 Early works, the construction of Facilities Project Georgia Company compressor stations Georgia 1 & 2 (SCP Co.-Consortium and the pressure reduction, and ENKA - Bechtel JV between BP (Technical metering facility Operator), SOCAR, TPAO, Petronas, Lukoil and NICO) SCPX Early Works & Multiple Locations – ENKA - Bechtel (USA) JV 2015 2017 Euro 36,759,763 Piping Layout and Spool Fabrication, Facilities Project Georgia Engineering, Procurement and Fabrication of Steel Structure for CIMTAS Pipe - CİMTAŞ Compressor Station Georgia-1 & 2 Module & Shipyard (CSG-1 & CSG-2) and the Pressure Reduction and Metering Facility (AREA 81) Namakhvani Hydro Power Plant Cascade Project Namakhvani - Georgian Government 40 Months US$ 750,000,000 Develop, construct, own and operate Georgia ENKA - Clean Energy Group Gardabani 2-Unit 1 Gardabani - Georgia GE Energy Products Europe May 2018 Euro 41,000 Pipe and pipe fittings procurement (System 6FA) (Shipment Date) and receiving inspection, Cutting and drilling, Fit-up and welding, Visual CIMTAS Ningbo check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing Gardabani 2-Unit 2 Gardabani - Georgia GE Energy Products Europe May 2018 Euro 41,000 Pipe and pipe fittings procurement (System 6FA) (Shipment Date) and receiving inspection, Cutting and drilling, Fit-up and welding, Visual CIMTAS Ningbo check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing Poti Port Petroleum Products Storage & ÜSTAY Construction- Handling Terminal Project Contracting and Trading December 2001 December 2002 US$ 1,000,000 Soil Improvement Works Poti - Georgia Company Kaskta ş Address: of 9 Phone : +90 (212) 376 10 00 (pbx) 3 Balmumcu Mah., Zincirlikuyu Yolu No: 10 Fax : +90 (212) 272 88 69 Besiktas, Istanbul, Turkey 34349 Web: www.enka.com E-mail: enka@enka.com
SCPX Early Works and Facilities Project - Georgia Location : Georgia Client : South Caucasus Pipeline Company Ltd. Consortium between BP (Technical Operator), SOCAR, TPAO, Petronas, Lukoil and NICO) Construction Period : Feb 2014 – Oct 2019 Project Value : US$ 878 Million Project Description : A joint venture between Bechtel and ENKA was awarded the SCPX Early Works and Facilities contract and responsible for the construction of two Compressor Stations (CSG-1 and CSG-2) and a Pressure Reduction and Metering Station (AREA 81) at three different locations within Georgia, and for all related early civil works and facilities. The early works stage for Compressor Station 2 (CSG-2) includes the construction of a 15 km access road between the existing Millennium Highway and the compressor station. The Bechtel-ENKA Joint Venture’s scope of works also includes the supply and fabrication of all structural steel and fabrication of all piping including the pipeline connection sections to the South Caucasus Pipeline. SCPX – Area 81 Project was awarded with the Merit prize by British Safety Council in “International Safety Awards 2018” Engineering Procurement Transport & Main Work Item Quantity Unit FEED Fabrication Construction Logistic Process Buildings m² 20,900 Non-process m² 2,700 Buildings Concrete works m³ 74,000 Steel works ton 14,500 Pipe works ton 7,400 Not by ENKA Partially by ENKA Fully by ENKA Address: of 9 Phone : +90 (212) 376 10 00 (pbx) 4 Balmumcu Mah., Zincirlikuyu Yolu No: 10 Fax : +90 (212) 272 88 69 Besiktas, Istanbul, Turkey 34349 Web: www.enka.com E-mail: enka@enka.com
South Caucasus Pıpelıne (SCPX) Client : Bechtel – ENKA JV Construction Period : 2015-2017 Project Value : Euro 37 Million ÇİMTAŞ ’s Scope of Works : Piping Layout and Spool Fabrication, Engineering, Procurement and Fabrication of Steel Structure for Compressor Station Georgia-1 & 2 (CSG-1 & CSG-2) and the Pressure Reduction and Metering Facility (AREA 81) Scope Details : Pipe Spool : 5,700 tons Steel Structure : 8,400 tons Address: of 9 Phone : +90 (212) 376 10 00 (pbx) 5 Balmumcu Mah., Zincirlikuyu Yolu No: 10 Fax : +90 (212) 272 88 69 Besiktas, Istanbul, Turkey 34349 Web: www.enka.com E-mail: enka@enka.com
Namakhvani HPP Cascade - Georgia Location : Kutaisi - Georgia Scope : EPC, Lump Sum Turnkey Commencement : 2019 Completion : 2023 Client : Clean Energy Group Georgia On April 25, 2019, the Build-Operate Agreement was signed with the Government of Georgia for the development, construction, ownership and operation of the Namakhvani Cascade HEPP Project in Georgia, where 90% of it is owned by ENKA. Namakhvani Cascade HEPP Project consists of two separate hydroelectric power plants, namely Namakhvani HEPP (333 MW) and Tvishi HEPP (100 MW) on the Rioni River of Georgia and a total investment of 750 million US Dollars is projected. After the plant is operative, with the 15-year Power Purchase Agreement, the production will be done under the state guarantee for the eight months period between September and April of the year. Following the completion of the necessary permits, the construction of the project will begin and the plant is planned to be commissioned in 2023. Address: of 9 Phone : +90 (212) 376 10 00 (pbx) 6 Balmumcu Mah., Zincirlikuyu Yolu No: 10 Fax : +90 (212) 272 88 69 Besiktas, Istanbul, Turkey 34349 Web: www.enka.com E-mail: enka@enka.com
Resources ın Georgia % of Construction Human Resources Machinery & Equipment & (SCPx Project) Marine fleet Technical LIFTING EQUIPMENT 49 Staff CONCRETE PRODUCTION AND MATERIAL PREPERATION EARTH MOVING MACHINES Administrative 44 TRANSPORTATION EQUIPMENT Staff ENERGY GENERATION AND DISTRIBUTION EQUIPMENT SUPPORT EQUIPMENT Craft 653 OTHER MACHINERY,FACILITIES FOR CONSTRUCTION SITES 1% Total 746 12% 21% 2% 7% 34% 23% Address: of 9 Phone : +90 (212) 376 10 00 (pbx) 7 Balmumcu Mah., Zincirlikuyu Yolu No: 10 Fax : +90 (212) 272 88 69 Besiktas, Istanbul, Turkey 34349 Web: www.enka.com E-mail: enka@enka.com
Award & Achıevements ENKA received the 2018 ENR Global Best Project Award under Power / Industrial Category for its SCPX Area 81 Project, located in Georgia SPCX – Area 81 Project has been awarded with the Merit prize by British Safety Council in “International Safety Awards 2018”; which clearly demonstrates the project’s commitment to the health, safety and wellbeing of its workforce Compressor Stations Georgia-1 and Compressor Stations Georgia-2 sites of SCPX project both achieved 6,000,000 man-hours without a lost-time incident Area-81 of SCPX project is completed without a lost-time incident, reaching 3,000,000 man-hours British Petroleum Georgia Safety Award 2017 was presented to ENKA-Bechtel JV in recognition of good overall safety performance Address: of 9 Phone : +90 (212) 376 10 00 (pbx) 8 Balmumcu Mah., Zincirlikuyu Yolu No: 10 Fax : +90 (212) 272 88 69 Besiktas, Istanbul, Turkey 34349 Web: www.enka.com E-mail: enka@enka.com