Engineering for a Better Future POWER PLANTS & ENERGY OVERVIEW
Presentation Outline 1. POWER PLANT PROJECTS 1.1 ENKA in Power Plants ............................…………………………………………….….. 2-3 Projects List ……………………………………………………………………………….….… 4 1.2 Projects in Turkey 1.2.1 Adapazari-Gebze Natural Gas Fired CCPPs BOO by ENKA ………. 5 1.2.2 Izmir Natural Gas Fired CCPP BOO by ENKA …………………….………. 6 1.2.3 Gallery of Coal Fired Power Plants …………………………………….……. 7 1.2.4 1,200 MW Trakya CCPP ......……………………………….…………………........ 8 1.2.5 1,400 MW Bursa CCPP ......……………………………….………………….......... 9 1.2.6 FEED-OBCE/ Aliağa STAR Cogen. Steam & Power Project……........10 1.3 Projects in the Netherlands 1.3.1 790 MW Rijnmond CCPP ....……………………………………………………… 11 1.4 Projects in Russia 1.4.1 411 MW Yajvinskaja CCPP ………………………………………………………. 12 1.4.2 800 MW Berezovskaya Power Plant ................………………........….…. 13 1.4.3 495 MW Nizhnekamsk CCGT-TPP ....…………………………………………14 1.4.4 250 MW Kazan CCPP ....…………………………………………………………… 15 1.4.5 858 MW Zainskaya CCCP ....………………………………………………………16 1.5 Projects in Iraq 1.5.1 126 MW WQ-2 Power Plant ……................................…………….….….. 17 1.5.2 1,500 MW Erbil CCPP …………………...............……………………………… 18 1.5.3 500 MW Al Haydariyah Gas Turbine Power Plant ....……….……… 19 1.5.4 500 MW Najibiyah Gas Turbine Power Plant .................…………… 20 1.5.5 1,500 MW Sulaymaniyah CCPP ...........................................…………… 21 1.5.6 500 MW Bazyan SCPP ..............................................….............….……… 22 1.5.7 1,500 MW Besmaya CCPP ......................................…...............……...… 23 1.5.8 750 MW Samawa CCPP .......................................…................…....…… 24 1.5.9 750 MW Dhi Qar CCPP .......................................….......................……....25 1.6 Projects in Libya 1.6.1 570 MW Zwitina Gas Turbine Power Plant ....…………...…………… 26 1.6.2 640 MW Awbari Gas Turbine Project .................................................. 27 Address: of 28 Phone : +90 (212) 376 10 00 (pbx) 2 Balmumcu Mah., Zincirlikuyu Yolu No: 10 Fax : +90 (212) 272 88 69 Besiktas, Istanbul, Turkey 34349 Web: www.enka.com E-mail: enka@enka.com
Power Plants ENKA as an EPC Contractor ENKA’s Power Plants EPC experience consisting of: 6 Coal Fired Power Plants with a total capacity of 4,070 MW 15 Natural Gas Fired CCPPs with a total capacity of 15,404 MW 6 Natural Gas Fired SCPPs with a total capacity of 2,836 MW ENKA constructed more than 20% of the fossil fuel fired power plants in Turkey. ENKA as an Independent Power Producer (IPP) ENKA constructed the following plants in accordance with the Build-Own-Operate (BOO) model, with their collective annual generation capacity of 32 billion kilowatt-hours, they are capable of meeting 11% of Turkey's aggregate energy consumption as independent generation companies: Gebze Natural Gas Combined Cycle Power Plant with a nominal capacity of 1,600 MW Adapazarı Natural Gas Combined Cycle Power Plant with a nominal capacity of 820 MW Contracted total value of Power Plant İzmir Natural Gas Combined Cycle Power Plant with a Projects > 10 Billion USD nominal capacity of 1,580 MW Address: of 28 Phone : +90 (212) 376 10 00 (pbx) 3 Balmumcu Mah., Zincirlikuyu Yolu No: 10 Fax : +90 (212) 272 88 69 Besiktas, Istanbul, Turkey 34349 Web: www.enka.com E-mail: enka@enka.com
Power Plants Project MW Plant Type Country Location Client Commence Completion Contract Date Date Price Gebze 1,600 CCPP Turkey Adapazarı ENKA Power acting as IPP 2000 2002 $513,000,000 Adapazarı 820 CCPP Turkey Adapazarı ENKA Power acting as IPP 2000 2002 $267,000,000 İzmir 1,580 CCPP Turkey İzmir ENKA Power acting as IPP 2000 2003 $505,000,000 Tunçbilek II 150 Coal fired Turkey Tunçbilek Turkish Electricity Authority (TEK) 1973 1978 $17,000,800 Yatagan 630 Coal fired Turkey Muğla Turkish Electricity Authority (TEK) 1977 1985 $91,000,000 Yenikoy 420 Coal fired Turkey Muğla Turkish Electricity Authority - TEK 1981 1987 $102,000,000 Kemerkoy 630 Coal fired Turkey Muğla Turkish Electricity Authority - TEK 1984 1985 $184,000,000 Trakya 1,200 CCPP Turkey Kırklareli Turkish Electricity Authority - TEK 1984 1989 $316,000,000 Bursa 1,400 CCPP Turkey Bursa Turkish Electricity Generation & Transmission Co. Inc. 1996 1999 $512,000,000 Afş in Elbistan 1,440 Coal fired Turkey Kahramanmaraş Electricity Generation Co. Inc. - EÜAŞ 2000 2006 $1,613,000,000 FEED-OBCE Works - Aliağa STAR CCPP Turkey İzmir SOCAR Turkey Akaryakıt Depolama A.Ş. 2020 2021 Confidential Cogen. Steam & Power Project Rıjnmond 790 CCPP Netherlands Rotterdam Rijnmond Energie CV 2002 2004 $362,000,000 Yajvinskaja 411 CCPP Russia Perm E.ON Russia 2008 2011 $460,000,000 Berezovskaya 800 Coal fired Russia Berezovskaya E.ON Russia 2012 2015 $172,000,000 Nizhnekamsk 495 CCPP Russia Nizhnekamsk Nizhnekamskneftekhim (Member of the TAIF Group) 2017 2021 EUR 349,000,000 / Tatarstan Kazan 250 CCPP Russia Kazan / Tatarstan PJSC Kazanorgsintez (Member of the TAIF Group) 2019 2023 EUR 245,000,000 Zainskaya 858 CCPP Russia Zainsk/Tatarstan Joint Stock Company "Tatenergo" 2020 2023 $365,000,000 West Qurna II 126 SCPP Iraq Basra Ministry of Oil of Iraq/Luk-Oil Mid-East Limited 2011 2014 $387,000,000 Erbil 1,500 CCPP Iraq Erbil MGH - Mass Group Holding Ltd. 2012 2015 Confidential Al Haydariyah 500 SCPP Iraq Al Najaf Ministry of Electricity of Iraq 2012 2013 $2,500,000 Najibiyah 500 SCPP Iraq Basra Ministry of Electricity of Iraq 2013 2015 $271,000,000 Sulaymaniyah 1,500 CCPP Iraq Sulaymaniyah MGH - Mass Group Holding Ltd. 2013 2016 $434,000,000 Bazyan 500 SCPP Iraq Sulaymaniyah Qaiwan Company 2014 2016 $222,000,000 Besmaya 1,500 CCPP Iraq Baghdad MASS Energy Group Holding Ltd. 2014 2018 $569,000,000 Samawa 750 CCPP Iraq Samawa Ministry of Electricity of Iraq 2019 2021 Phase 1 $562,000,000 Dhi Qar 750 CCPP Iraq Nasiriyah Ministry of Electricity of Iraq 2019 2021 Phase 1 $560,000,000 Zwitina 570 SCPP Libya Zwitina General Electricity Company of LIBYA (GECOL) 2008 2012 EUR 89,000,000 Awbari 640 SCPP Libya Awbari General Electricity Company of LIBYA (GECOL) 2010 2017 EUR 180,000,000 Total Output: 22,310 MW Address: of 28 Phone : +90 (212) 376 10 00 (pbx) 4 Balmumcu Mah., Zincirlikuyu Yolu No: 10 Fax : +90 (212) 272 88 69 Besiktas, Istanbul, Turkey 34349 Web: www.enka.com E-mail: enka@enka.com
1,600 MW Gebze & 820 MW Adapazari CCPPs – Turkey Natural Gas Fired CCPPs Built, Owned, Operated (BOO) by ENKA Location : Adapazari - Turkey Client : Gebze Elektrik Üretim Ltd. Şti . & Adapazarı Elektrik Üretim Ltd. Şti . Construction Period : Apr 2000 – Oct 2002 Project Description : Following a build-own-operate (BOO) tender in 1997, the InterGen-ENKA partnership was awarded the right to build, own and operate the Gebze Power Plant with a nominal capacity of 1,600 MW, the Adapazarı Power Plant with a nominal capacity of 820 MW, respectively. An ENKA and Bechtel joint venture was the turnkey EPC contractor for all three plants. Each power island in these natural gas-fired combined cycle power plants consists of two combustion turbines / generators, two- heat recovery steam generators and one steam turbine/generator. In the Gebze and Adapazarı power plants, natural draft dry cooling towers serve each 1,600 MW Gebze & 820 MW Adapazarı power island. ENKA is the sole owner of the Gebze, Adapazarı and In 2011, ENKA’s Adapazar ı Power Plant was selected İ zmir Natural Gas Fired CCPPs since December 2005. as the Power Plant of the Year with an availability Collective annual generation capacity of 32 billion of 99.8 % by the Power Magazine kilowatt-hours are capable of meeting 11% of Turkey's aggregate energy consumption. Address: of 28 Phone : +90 (212) 376 10 00 (pbx) 5 Balmumcu Mah., Zincirlikuyu Yolu No: 10 Fax : +90 (212) 272 88 69 Besiktas, Istanbul, Turkey 34349 Web: www.enka.com E-mail: enka@enka.com
Recommend
More recommend