el limon guajes mine
play

El Limon-Guajes Mine Photographic Report First Ounces December 2015 - PowerPoint PPT Presentation

TSX: TXG January 14, 2016 El Limon-Guajes Mine Photographic Report First Ounces December 2015 2 First Shipment January 2016 3 View of Guajes Pit And RopeCon 4 Crushing And Ore Stockpiles RopeCon, coming down from the El Limon crusher


  1. TSX: TXG January 14, 2016 El Limon-Guajes Mine Photographic Report

  2. First Ounces December 2015 2

  3. First Shipment January 2016 3

  4. View of Guajes Pit And RopeCon 4

  5. Crushing And Ore Stockpiles RopeCon, coming down from the El Limon crusher Discharge point for the RopeCon, onto the same fine ore stockpile as the Guajes Stacker conveyor Guajes Crusher Stacker conveyor 1 of 9 coarse from the Guajes ore stockpiles crusher Fine ore stockpile (SAG Mill feed) Reclaim tunnel that pulls fine ore from the stockpile and puts it onto the SAG Mill feed conveyor 5

  6. Guajes Crusher And Stacker Conveyor 6

  7. Reclaim Tunnel – Fine Ore Stockpile Is Above The Tunnel, Ore Comes Down Through Feeders To The SAG Mill Feed Conveyor 7

  8. SAG Mill Feed Conveyor From The Reclaim Tunnel 8

  9. SAG Mill And Screens To Remove ‘Pebbles’ 9

  10. After The Screens, Material Is Pumped To The Cyclones At the Top Right, Cyclone Oversize To The Ball Mill 10

  11. Cyclone Undersize Is Pumped To The Pre-Leach Thickener 11

  12. From The Pre-Leach Thickener To The Leach Tanks And Then To CIP Process In The Back 12

  13. What The Inside Of A Leach Tank Looked Like 13

  14. From CIP, Pregnant Solution Goes To Carbon Handling Trying to get new picture 14

  15. From Carbon Handling To The Refinery For Dore’ 15

  16. From CIP, Tailings Go To Cyanide Destruction 16

  17. From Cyanide Destruction Over To The Filter Building 17

  18. Inside the Filter Plant 18

  19. Filtered Tailings Are Conveyed To The Disposal Area 19

  20. Tailings Disposal Area (TDS) – The End Of The Process 20

  21. Secondary Processes: Reagent Distribution 21

  22. Process Water Control Structures Needed To Be Built And Sealed 22

  23. Mobile Equipment Maintenance Facilities Needed To Be Built And Equipped (Not Critical Path) 23

  24. Staff Housing, An Administration Building, An Access Road, And A New Village Have Been Constructed And Are Now In Use 24

  25. View From El Limon – Rope-Con In Front, Stockpile In The Middle And Filter Plant On The Far Right 25

  26. Advancing On ‘Full Production’ Construction. This Is the El Limon Crusher Building 26

  27. Mining And Road Construction Have Started For The El Limon Pit 27

  28. For further information: Gabriela Sanchez, VP Investor Relations email: gabriela.sanchez@torexgold.com Mobile: (416) 357-6673 www.torexgold.com