DTE SolarCurrents Pilot Programs April 8, 2013 PA 295 of 2008 has led Detroit Edison to develop the following RPS Portfolio Plan Solar At least 50% will be 3 rd Landfill Gas 22 MW 11 MW party-owned Biomass Majority expected to be


  1. DTE SolarCurrents Pilot Programs April 8, 2013

  2. PA 295 of 2008 has led Detroit Edison to develop the following RPS Portfolio Plan Solar • At least 50% will be 3 rd Landfill Gas 22 MW 11 MW party-owned Biomass • Majority expected to be ~ 40 MW wind energy • Limited availability of landfill gas, biomass, ~ 1,000 MW hydro in Michigan Wind New Renewable ~ 900 MW • Pilot programs for Solar Capacity 2

  3. Customer-Owned Solar Pilot Program Phase 1 (Fully Subscribed) • 5 MW in total nameplate capacity, $25 Million Budget • Customers can install solar systems up to 20 kW, following Net Metering and interconnect guidelines • 581 projects commissioned as of 4/3/13, 75/25 % split between residential and non-residential based on a number of projects • Projects located in all 13 counties of DTE Energy’s electric service territory Phase 2 (Open) • 2 MW in total nameplate capacity, $2 Million budget • Projects selected through application process through 3/1/2015 • Incentives are lower than Phase 1 offering 3

  4. DTE-Owned Solar Pilot Program • 15 MW in total nameplate capacity • $112 Million budget over 5 years • Partner with customers to site projects on large rooftops or ground-mounted • DTE Energy facilities • Project Sizes: 250-500 kW • Using standard site easement agreements 4

  5. Committed Projects Site Size (kW) Mounting COD Status DECo Project #1 (Scio Township) 60 Ground 11/16/2010 Complete 1 Ford Michigan Assembly (Wayne) 502 Ground 1/25/2011 Complete 2 Monroe County Community College 513 Ground 2/22/2011 Complete 3 Blue Cross Blue Shield (Detroit) 220 Roof 8/5/2011 Complete 4 GM Chevy Volt Plant (Hamtramck) 516 Ground 9/30/2011 Complete 5 DECo project #2 ‐ TDC (Westland) 391 Ground 9/16/2011 Complete 6 Mercy High School (Farmington Hills) 394 Roof 12/28/2012 Complete 7 Warren Consolidated Schools CPC (Sterling Heights) 197 Roof 3/22/2012 Complete 9 DECo Project #3 ‐ HQ (Detroit) 80 Canopy 11/15/2012 Complete 8 GM Orion Assembly (Orion Township) 350 Ground 11/27/2012 Complete 10 Huron Clinton Metro Parks (White Lake) 495 Ground 11/20/2012 Complete 11 IHM The Mother House (Monroe) 516 Ground 12/4/2012 Complete 12 Wil ‐ Le Farms (Bad Axe) 486 Ground 12/19/2012 Complete 13 U of M ‐ North Campus Research Complex (NCRC) 425 Ground 12/27/2012 Construction 14 U of M ‐ Information, Science and Technology (IST) 230 Ground Est. 7/2013 Design 15 Riopelle Farms (Harbor Beach) 500 Ground Est. 9/2013 Design 16 Hartland Schools (Hartland) 440 Ground Est. 9/2014 Design 17 St. Clair RESA (Marysville) 502 Ground Est. 9/2015 Design 18 Leipprandt Orchards (Pigeon) 500 Ground TBD Feasibility 19 Lyon Township Project 750 Ground TBD Feasibility 20 Total kW 8067 5