DTE SolarCurrents Pilot Programs April 8, 2013
PA 295 of 2008 has led Detroit Edison to develop the following RPS Portfolio Plan Solar • At least 50% will be 3 rd Landfill Gas 22 MW 11 MW party-owned Biomass • Majority expected to be ~ 40 MW wind energy • Limited availability of landfill gas, biomass, ~ 1,000 MW hydro in Michigan Wind New Renewable ~ 900 MW • Pilot programs for Solar Capacity 2
Customer-Owned Solar Pilot Program Phase 1 (Fully Subscribed) • 5 MW in total nameplate capacity, $25 Million Budget • Customers can install solar systems up to 20 kW, following Net Metering and interconnect guidelines • 581 projects commissioned as of 4/3/13, 75/25 % split between residential and non-residential based on a number of projects • Projects located in all 13 counties of DTE Energy’s electric service territory Phase 2 (Open) • 2 MW in total nameplate capacity, $2 Million budget • Projects selected through application process through 3/1/2015 • Incentives are lower than Phase 1 offering 3
DTE-Owned Solar Pilot Program • 15 MW in total nameplate capacity • $112 Million budget over 5 years • Partner with customers to site projects on large rooftops or ground-mounted • DTE Energy facilities • Project Sizes: 250-500 kW • Using standard site easement agreements 4
Committed Projects Site Size (kW) Mounting COD Status DECo Project #1 (Scio Township) 60 Ground 11/16/2010 Complete 1 Ford Michigan Assembly (Wayne) 502 Ground 1/25/2011 Complete 2 Monroe County Community College 513 Ground 2/22/2011 Complete 3 Blue Cross Blue Shield (Detroit) 220 Roof 8/5/2011 Complete 4 GM Chevy Volt Plant (Hamtramck) 516 Ground 9/30/2011 Complete 5 DECo project #2 ‐ TDC (Westland) 391 Ground 9/16/2011 Complete 6 Mercy High School (Farmington Hills) 394 Roof 12/28/2012 Complete 7 Warren Consolidated Schools CPC (Sterling Heights) 197 Roof 3/22/2012 Complete 9 DECo Project #3 ‐ HQ (Detroit) 80 Canopy 11/15/2012 Complete 8 GM Orion Assembly (Orion Township) 350 Ground 11/27/2012 Complete 10 Huron Clinton Metro Parks (White Lake) 495 Ground 11/20/2012 Complete 11 IHM The Mother House (Monroe) 516 Ground 12/4/2012 Complete 12 Wil ‐ Le Farms (Bad Axe) 486 Ground 12/19/2012 Complete 13 U of M ‐ North Campus Research Complex (NCRC) 425 Ground 12/27/2012 Construction 14 U of M ‐ Information, Science and Technology (IST) 230 Ground Est. 7/2013 Design 15 Riopelle Farms (Harbor Beach) 500 Ground Est. 9/2013 Design 16 Hartland Schools (Hartland) 440 Ground Est. 9/2014 Design 17 St. Clair RESA (Marysville) 502 Ground Est. 9/2015 Design 18 Leipprandt Orchards (Pigeon) 500 Ground TBD Feasibility 19 Lyon Township Project 750 Ground TBD Feasibility 20 Total kW 8067 5
Educational Kiosks are provided to Host Customers and are typically located in schools 6
Recommend
More recommend