F lo rida De partme nt o f T ranspo rtatio n – Distric t 6 Kickoff Meeting Downtown Miami Freight Technical Freight Mobility Study Advisory Committee Miami-Dade MPO February 26, 2014
Our Agenda Today Study Purpose Study Area Study Activities Key Considerations Downtown Development Planned Stakeholders & Coordination Efforts Schedule of Events Downtown Miami Freight Mobility Study – FTAC Kickoff Presentation
Purpose of Project Identify Infrastructure Alternatives that Enhance Downtown Mobility Including Provisions for: • Future Surface Street Freight Movements to/from PortMiami; • Future Rail Freight Movements to/from PortMiami; • Planned Passenger Rail Servic e To & Through Downtown Miami Downtown Miami Freight Mobility Study – FTAC Kickoff Presentation
Study Area-Existing Conditions 4 5 3 2 1 L E GE ND Downtown De stinations Study Are a 1 Mia mi-Da de Co unty Building Hig hwa y Co rrido rs 2 Ba yside NW/SW 2 nd Ave Me tro ra il 3 Ame ric a n Airline s Are na F E C Co rrido r 4 Pe rfo rming Arts Ce nte r Me tro mo ve r 5 Wa tso n I sla nd Po rt T unne l Alig nme nt Downtown Miami Freight Mobility Study – FTAC Kickoff Presentation
Study Activities Establish Purpose & Needs for Future Downtown Miami Circulation & Connectivity • Tie PortMiami to the Regional Freight Network • Mitigate Rail/ Highway Conflicts • Provide for Hazardous Freight Movement Through Downtown • Accommodate Future Passenger Rail Service Identify Future Mobility Needs Compatible with Continued Downtown Economic Development Determine Needed Infrastructure Improvements Downtown Miami Freight Mobility Study – FTAC Kickoff Presentation
Key Considerations Passenger Rail Service Impact Determination • SFRTA’s Coastal Link • FEC’s All Aboard Florida • MPO’s Beach Corridor Transit Connection to Miami Beach • AmTrak on FEC Corridor PORTMIAMI Freight Movement Impact Determination • Post Panamax/Dredging Impacts on Cargo • Hazardous Freight Movement – Precluded from Tunnel • Rail Connection to Hialeah Intermodal Facility Future Travel Demand Estimation – Other Modes • DDA Vision for Future • Other Smaller Scale Downtown Developments Downtown Miami Freight Mobility Study – FTAC Kickoff Presentation
Key Stakeholders Downtown Miami Freight Mobility Study – FTAC Kickoff Presentation
Downtown Development Downtown Miami Freight Mobility Study – FTAC Kickoff Presentation
PortMiami Development PortMiami Tunnel (Opening 2015) Proposed Expansion of Cruise Terminal B Proposed Mega Terminal Development Proposed Area of Commercialization on PortMiami Downtown Miami Freight Mobility Study – FTAC Kickoff Presentation
All Aboard Florida Miami to Orlando Rail 2018 Opening Downtown Miami Freight Mobility Study – FTAC Kickoff Presentation
SFRTA Coastal Link Downtown Miami to Jupiter 28 Stations System Terminates in Downtown Miami Downtown Miami Freight Mobility Study – FTAC Kickoff Presentation
Beach Corridor Transit Connection 2004 BayLink LPA 2014 LPA Refinements Current Focus is on Direct Connection Between Miami Beach and the Downtown Grand Central Station to Leverage Other Local/Regional Rail Resources Downtown Miami Freight Mobility Study – FTAC Kickoff Presentation
Grand Central Station Planned Service • Metrorail • Metromover • All Aboard Florida • SFRTA Coastal Link Mixed Use Development • Intermodal • Office • Retail Planned Opening - 2020 Downtown Miami Freight Mobility Study – FTAC Kickoff Presentation
Miami WorldCenter 30 Acre Development 4 Hotels • Anchored by 1,000 Room Convention Hotel (Marriott) Retail • 750,000 sf Construction Start – 2014/15 Downtown Miami Freight Mobility Study – FTAC Kickoff Presentation
Museum Park – Bicentennial Park Perez Art Museum o Miami • 200,000 sf Miami Science Museum • 250,000 sf Downtown Miami Freight Mobility Study – FTAC Kickoff Presentation
Resorts World 13.9 Acre Development Parcel is Combination of Miami Herald and Omni Sites Retail • 500,000 sf Convention • 750,000 sf Entertainment • 1,000,000 sf Downtown Miami Freight Mobility Study – FTAC Kickoff Presentation
Brickell CitiCentre Retail • 520,000 sf Office • 120,000 sf Residential • 800 Condos Hotel • 243 Rooms Opening 2015 Downtown Miami Freight Mobility Study – FTAC Kickoff Presentation
Travel Demand Projections Travel Projections PortMiami Scenario Planning Low Freight Projections • Base Year 2010 • Moderate Freight Projections • Horizon Year 2040 • High Freight Projections • Operational Analysis • Existing Year – 2014 • Opening Year - 2020 • Interim Year - 2030 • Design Year – 2040 Downtown Miami Freight Mobility Study – FTAC Kickoff Presentation
Planned Coordination Efforts Project Advisory Team Meetings Kickoff Meetings with Key Stakeholders Presentations to MPO Freight Technical Advisory Committee Downtown Miami Freight Mobility Study – FTAC Kickoff Presentation
Schedule of Events 7 Month Schedule N N D D J F M A M J Kickoff & Initial Coordination Presentations to MPO Freight TAC Establish Purpose & Need for Project Determination of Future Travel Demand Identification of Concepts & Alternatives Development & Comparison of Alternatives Recommended Improvements Prepare Final Report Downtown Miami Freight Mobility Study – FTAC Kickoff Presentation
Questions and Follow-Up Downtown Miami Freight Mobility Study – FTAC Kickoff Presentation