de devil s slide coastal t vil s slide coastal trail
play

De Devils Slide Coastal T vils Slide Coastal Trail Improvements - PowerPoint PPT Presentation

De Devils Slide Coastal T vils Slide Coastal Trail Improvements Project ail Improvements Project County of San Mateo Project History Measure T Nov.1996 Plans and Permits Task Force meetings Hired a team Board support


  1. De Devil’s Slide Coastal T vil’s Slide Coastal Trail Improvements Project ail Improvements Project County of San Mateo

  2. Project History  Measure T Nov.1996  Plans and Permits  Task Force meetings  Hired a team  Board support  Budget Devil’s Slide Coastal Trail Improvements Project

  3. Project Overview Devil’s Slide Coastal Trail Improvements Project

  4. Process/ Tentative Schedule  30% Concept Documents (July 2013)  Public Meeting (Today)  Park and Rec. Present & Public Comment (August 1 st )  90% Construction Documents (August 22 nd )  Next Public Meeting (August 29 th )  Board of Supervisors Plan Approval (September 17 th )  Transfer title of land to County (October 2013)  Construction (Winter 2013/ 2014)  Trail Opening (March 2014) Devil’s Slide Coastal Trail Improvements Project

  5. Presentation Overview  Pavement, Striping, Roland Haga, P.E, LEED AP Signage & K-rail, and BKF Engineers Other Improvements  Environmental Review Sarah Sutton, ASLA, LEED AP, The Planning Center | DC&E & Overlooks  Maintenance, Schedule Gary Lockman County of San Mateo & Next Steps  Questions/ Discussion Project Team (45 minutes) Devil’s Slide Coastal Trail Improvements Project

  6. Consultants Role  Construction Documents  County Goals and Budget  Environmental Review  Engineering  Landscape Architecture Devil’s Slide Coastal Trail Improvements Project

  7. Overview of Trail Improvements  1.3 Mile Trail  Accessibility  Paving and Striping  K-Rail Improvements  Signage/Interpretation  Overlooks  Accessibility Devil’s Slide Coastal Trail Improvements Project

  8. Before K-Rail simulation Devil’s Slide Coastal Trail Improvements Project

  9.  Devil’s Slide Coastal Trail Improvements Project

  10. Paving and Striping  Repair existing asphalt pavement  Microsurfacing existing roadway  Striping to separate bikes pedestrians (6’ bike lanes each way and 10-12’ pedestrian travel) Devil’s Slide Coastal Trail Improvements Project

  11. Signage  Remove existing roadway signage  New regulatory signage (minimize number, and location to protect views)  Interpretive panels Devil’s Slide Coastal Trail Improvements Project

  12. Accessibility Improvements  Bathroom & drinking fountains (north and south trailheads)  Interpretive panels  Overlooks  Observation scopes  Reasonable effort to provide ADA access to Devil’s Slide trail and overlooks Devil’s Slide Coastal Trail Improvements Project

  13. K-Rail Beautification  Why Keep the K-Rails?  Beautification options  Paint Tan  Texturize and Paint  Wire and Stucco  Replace with Faux Rock Wall  Options vary in costs  Maintenance concerns Devil’s Slide Coastal Trail Improvements Project

  14. Environmental Review  May 2002 EIS/EIR supplement to 1986 certified by Caltrans  Sept. 2004 California Coastal Commission upheld July 2004 approved CDP  Trail improvements are consistent with CDP  Project will provide memorandum including detailed analysis of biological resources Devil’s Slide Coastal Trail Improvements Project

  15. Potential Wetlands  Four potential Wetlands  Two require K-rail relocation  Supervision of a qualified wetland biologist Devil’s Slide Coastal Trail Improvements Project

  16. Bird Nesting  December 2011 Common Murre Restoration Project study identified site for bird 6’ Chain-link blind to protect sensitive Fence areas  Project proposes black Sensitive vinyl clad 6’ tall chain-link Nests/ Breeding fencing to eliminate line of Areas sight Devil’s Slide  USFWS and Murre Project Rock staff approved approach Devil’s Slide Coastal Trail Improvements Project

  17. Bird Nesting Devil’s Slide Coastal Trail Improvements Project

  18. Before photo of trail Devil’s Slide Coastal Trail Improvements Project

  19. After photo simulation of trail (BKF) Devil’s Slide Coastal Trail Improvements Project

  20. Bunker  Historic Value  Site Protection Fencing Devil’s Slide Coastal Trail Improvements Project

  21. Northern Overlook Devil’s Slide Coastal Trail Improvements Project

  22. Northern Overlook Plan view color Devil’s Slide Coastal Trail Improvements Project

  23. Northern Overlook Devil’s Slide Coastal Trail Improvements Project

  24. Devil’s Slide Coastal Trail Improvements Project

  25. Northern Overlook Devil’s Slide Coastal Trail Improvements Project

  26. Northern Overlook Devil’s Slide Coastal Trail Improvements Project

  27. Northern Overlook Devil’s Slide Coastal Trail Improvements Project

  28. Material Palette Devil’s Slide Coastal Trail Improvements Project

  29. Interpretive Area Devil’s Slide Coastal Trail Improvements Project

  30. Interpretive Area Devil’s Slide Coastal Trail Improvements Project

  31. Interpretive Area Plan color Devil’s Slide Coastal Trail Improvements Project

  32. Interpretive Area Section color Devil’s Slide Coastal Trail Improvements Project

  33. Interpretive Area Devil’s Slide Coastal Trail Improvements Project

  34. Southern Overlook Devil’s Slide Coastal Trail Improvements Project

  35. Southern Overlook Devil’s Slide Coastal Trail Improvements Project

  36. Southern Overlook Plan color Devil’s Slide Coastal Trail Improvements Project

  37. Southern Overlook Devil’s Slide Coastal Trail Improvements Project

  38. Southern Overlook Devil’s Slide Coastal Trail Improvements Project

  39. Future Maintenance  Bird monitoring  Wetland monitoring  Pampas grass removal  Rock removal  Rock slide repair (funding and expectations) Devil’s Slide Coastal Trail Improvements Project

  40. Tentative Schedule/ Next Steps  Park and Rec. Present & Public Comment (August 1 st )  90% Construction Documents (August 22 nd )  Next Public Meeting (August 29 th )  Board of Supervisors Plan Approval (September 17 th )  Transfer title of land to County (October 2013)  Construction (Winter 2013/ 2014)  Trail Opening (March 2014) Devil’s Slide Coastal Trail Improvements Project

  41. Questions/ Comments  Gary Lockman County of San Mateo  Roland Haga, P.E, LEED AP BKF Engineers  Sarah Sutton, ASLA, LEED AP, The Planning Center | DC&E Input can also be submitted via:  Comment Cards  Email: parksandrecreation@smcgov.org Comments due by August 8, 2013 Devil’s Slide Coastal Trail Improvements Project

  42. De Devil’s Slide Coastal T vil’s Slide Coastal Trail Improvements Project ail Improvements Project County of San Mateo

Recommend


More recommend