d3 1 list of pilot sites
play

D3.1_List of Pilot Sites INTELLIGENT ENERGY EUROPE II Energy - PowerPoint PPT Presentation

D3.1_List of Pilot Sites INTELLIGENT ENERGY EUROPE II Energy efficiency and renew able energy in buildings - IEE/12/070 EuroPHit [Improving the energy performance of step-by-step refurbishment and integration of renew able energies] -


  1. D3.1_List of Pilot Sites INTELLIGENT ENERGY – EUROPE II Energy efficiency and renew able energy in buildings - IEE/12/070 EuroPHit [Improving the energy performance of step-by-step refurbishment and integration of renew able energies] - Contract N°: SI2.645928

  2. D3.1: List of Pilot Projects (completed or still active) Treated File name Google map Indicative Project Building Available Key project No. Project Title Thumbnail Photo Floor Area Letter of link to start date Partner owner budget challenges (m 2 ) Commitment location for works COMPLETED D3.1_ListOfPilot Dun Laoghaire Centralized Home for 34 units, Sites_LOC01_M CS01 MosArt/ Rathdown Spring MHRV - ducting Elderly in Dun approx 2045 osart1_HomeFo Map 2.500.000 € Ireland County 2014 in a low floor to rElderly_DunLa Laoghaire m² TFA Council ceiling height oghaire.pdf Student housing Maison des small units (8- DELAYED Relevant Map Industries 80 rooms, OP04 LaMP/ 20m²), Exterior project findings Cité Agricoles et AgroParisTech approx. 1500 480.000€ France to be included Universitaire, insulating shell Alimentaires m²TFA in EuroPHit Paris wood/metal structure Social housing, Social mid- DELAYED D3.1_ListOfPilot 32 dwellings, small terrace CS05 LaMP/ terrace March Total Sites_LOC05_LA http://goo.gl/ SIA Habitat approx. 1500 houses, 2500 France houses In MP2_TerraceHo maps/YlRNd 2016 480.000€ m² TFA similar dwellings. uses_Courcelles Courcelles Worst efficiency eff. sbs retrofit, D3.1_ListOfPilot airtightness DELAYED Social semi- 24 dwellings, Sites_LOC06_LA CS06 LaMP/ March Total challenge when http://goo.gl/ detached SIA Habitat approx. 2248 MP3_SemiDeta France maps/zpdg4 2016 264.000€ introducing the chedHouses_Au houses Auby m² TFA garage in the by.pdf thermal envelope Typical 80`s COMPLETED August D3.1_ListofPilot Detached detached house, CS15 LAMP/ Jean Louis 2015 – Sites_LOC15_LA http://goo.gl/ Single Family 175 m² TFA 120.000 € concrete hollow France André MP_Andre_Tou maps/Mdcho Dezember House André brick wall 6cm rnon.pdf 2015 interior ins. EuroPHit_D3.1_20160308_PHI_ListOfPilotSites.doc

  3. COMPLETED C/Camarreal Spring D3.1_ListOfPilot Retrofitting the nº 36, 39011 CS16 PEP/ Family Home 2014 – Sites_LOC16_PE César Blanco 75 m² TFA 7.000€ roof to EnerPHit Santander Spain Casa Centón P4_CasaCentón December (Cantabria) standard _Santander.pdf 2015 D3.1_ListOfPilot Part of the DELAYED 42 O 53’20” Sites_LOC11_En CS10 EnEffect/ School 8- Municipality March windows were North 5436 m² 880.000 € Effect_Dyustab 25 O 18’47” Bulgaria Gabrovo of Gabrovo 2016 changed with anov_Gabrovo. East plastic, U=1.8 pdf D3.1_ListOfPilot DELAYED 42 O 53’15.80”N New plaster and Sites_LOC12_En CS11 EnEffect/ School 3- Municipality March orth 5450 m² 780.000 € roof, needs all Effect_St.CyrilA 25 O 19’10.68”E Bulgaria Gabrovo of Gabrovo 2016 ndMethodius_G the rest ast abrovo.pdf COMPLETED D3.1_ListOfPilot Ville Mäkinen 2014 – Sites Svartbäcks- CS12 IG PH/ Initially Complete refurb Family Home & Andrea 150 m² Oktober LOC12_IGPH_Sv vägen 11, Sweden 70.000 € incl. floor plate artbackvagen_S Stockholm Kuszik 2015 tockholm.pdf map A pilot for COMPLETED D3.1_ListOfPilot December Starts soon. most buildings Rehab Sites_LOC13_P CS13 PHDK/ Næstved 2013 – Insulation in: workshop in 175 m2 HDK_Næstved 800.000 DKK Denmark Municipality http://map.kra August towards ground Municipality.pd Næstved k.dk/m/nUeD 2014 and perimeter. f U EuroPHit_D3.1_20160308_PHI_ListOfPilotSites.doc

  4. 100 3- Tyseley Rd, bedroom COMPLETED D3.1_ListOfPilot Portsmouth, maisonettes Jan 2014 – Sites_LOC14_BR CS14 Wilmcote Portsmouth Large social Southsea, BRE/ UK 90m2 December 12 Mio £ E_WilmcoteHou House City Council Portsmouth housing buidling se_Portsmouth 7 1-bedroom 2015 PO5 4NA _PDF flats 45 m2 Map 9,359m2 Airtightness COMPLETED Design Relevant Sonnenstrasse, Single family Keep existing OP17 PHI/ Nov. 2013 project findings 97225 home Karl Theumer 126 m² 95.000 € windows Germany to be included Zellingen, Works Jan. Sonnenstrasse Very short time in EuroPHit Germany 2014 period for retrofit Airtighness, Relevant ON SITE Architecture Cabinet OP19 LaMP/ March thermal project findings 42600 Office d'architecture 151 m² 63.500 € France to be included Montbrison 2016 insulation walls Archipente Archipente in EuroPHit and roof, MHRV Apply external COMPLETED Relevant House in St Completed and perimeter 69450 St Cyr OP20 LaMP/ Family project findings Cyr au Mont 310 m² Au Mont d'Or August 116.150 € insulation, re-use France Sauvage to be included France d'Or 2015 existing supply in EuroPHit air ducts COMPLETED Relevant June 2015 Roof Insulation, OP21 MosArt/ Stella Maris, Art project findings 135 m² – October 95.000 € north façade, Wicklow Ireland Family Home McCormack to be included 2015 ventilation unit in EuroPHit EuroPHit_D3.1_20160308_PHI_ListOfPilotSites.doc

  5. Achieve the highest possible Relevant ON SITE OP22 EnEffect/ Rila Solutions August energy standard. project findings Villa Nina 400 m² 20.000 € Bansko Bulgaria EAD to be included 2015 - Conduct an in EuroPHit energy monitoring Just 1 flat with COMPLETED Relevant February interior OP23 PEP/ Treviana Marcos García project findings 5.580 m² Madrid 2015 – 13.700 € insulation, new Spain Social Housing Caravantes to be included May 2015 windows and in EuroPHit ventilation Retrofit of COMPLETED Church Relevant Church of March- existing building OP24 ZEPHIR/ community project findings C/ Orense 69, Pergine 734 m³ 2015 – Feb 2.000.000 € with PH Italy centre "La to be included Madrid Valsugana 2016 components and in EuroPHit Provvidenza" extension Roof already Relevant TENDER Energi- retrofitted, OP25 IG PH/ Stjärnhus October - project findings gruppen 3.320 m² Gothenburg 660.000 € ventilation Sweden Stacken to be included 2015 Stacken installed, façade in EuroPHit to be planned Owners Relevant ON SITE March Walls, top floor OP27 PEP/ SanSebastian community - project findings 560 m² 2016 – July 220.000 ³ ceiling, windows San Sebastian Spain Social Housing 32, San Roque to be included 2016 and ventilation in EuroPHit Street EuroPHit_D3.1_20160308_PHI_ListOfPilotSites.doc

  6. D3.1: List of cancelled projects cancelled D3.1_ListOfPil CANCELLED Ros Muc VEC otSites_LOC02 Poor orientation CS02 MosArt/ Secondary (Vocational 361.94 m² Winter _Mosart2_Ros Map 280.000 € and sprawling Ireland School - Education TFA 2013 MucSecondar layout building. Main Building Committee) ySchool_Bpiar sach.pdf D3.1_ListOfPil CANCELLED approx. Design: Poor orientation, otSites_LOC03 Hotel and Maria Biasi CS03 ZEPHIR/ 629 m² TFA 2013-2014 different building _ZEPHIR_Risto Restaurant and Monica Map 450.000 € Italy (existing Works: types in the same ranteValcanov Valcanover Valcanover building) 2014-2015 project er_Mezzolago .pdf D3.1_ListOfPil Camin de la CANCELLED Change of use. Therapy otSites_LOC08 Pasadiella, CS08 PEP/ Winter Improvement of center "La Caritas 542 m² TFA _PEP2_Therap 33394 Gijón, 144.756,49€ Spain 2013 thermal envelope Santina" yCenterLaSant Asturias and systems ina_Gijon.pdf map Relevant C/Praderas S CANCELLED Change of use. Ramón project Sebas 4G OP07 PEP/ Small hotel in Approx. 447 Improvement of Iñiguez, findings to be 28491 20.000€ Spain Navacerrada m² thermal envelope private owner included in Navacerrada, and systems EuroPHit Madrid Relevant Representative CANCELLED Resident project building.Improve OP09 PEP/ Hotel C/ Orense 69, association 55.000 m² findings to be of thermal Spain Eurobuilding 2 Madrid Eurobuilding included in envelope + EuroPHit fassade 18 Relevant Change of use. COMPLETED Gallions maisonettes project Thamesmead Improvement OP18 March BRE/UK Parkview Hub Housing with the findings to be , London £2.8 million thermal envelope 2013 Association ground floor included in SE28 with prefab garages EuroPHit elements. EuroPHit_D3.1_20160308_PHI_ListOfPilotSites.doc

  7. EuroPHit Case Study Projects CS01_Dun Laoghaire / IE CS02_Ros Muc / IE / cancelled CS06_Auby / FR CS15_Tournon sur Rhone / FR CS16_Santander / ES CS10_Gabrovo / BG CS11_Gabrovo / BG CS23_Madrid / ES CS07_Madrid / ES / cancelled CS14_Portsmouth / UK OP17_Zellingen / DE OP09_Madrid / ES / cancelled St Cyr Au Mont d'Or / FR Wicklow Town / IE OP22_Bansko / BG CS12_Stockholm / SE OP23_Pergine Valsugana / IT OP25_Gothenburg / SE OP27_San Sebastian / ES CS05_Courcelles / FR CS03_Pergine / IT / cancelled CS08_Gijón / ES / cancelled CS13_Næstved / DK OP19_Montbrison / FR EuroPHit_D3.1_20160308_PHI_ListOfPilotSites.doc

Recommend


More recommend