AC ACPA PA Pr Prot otoc ocol ol an and Re d Reso sour urce ces s for for Mud Mud Ball Ball Pro Problems blems CPU 5 Breakout — Troubleshooting on the Grade Gary L. Mitchell, P.E. Vice President — Airports & Pavement Technology American Concrete Pavement Association
Introduction Surface Defect Contained in aggregates Loader operations Don’t disperse in the mixer Shows up after paving
Prevention Stockpile Location Flat Facilitate unloading & stockpiling Pad or sacrificial layer Loader Operator
Determining Severity ASTM D 5340 PCI Standards 3 pop outs per square yard Size – can it be cored? Deleterious Material Requirements ASTM C 33 – 3% fine ag, up to 5% coarse ag Airfield project will not tolerate C 33 threshold Remove & Replace only if extensive or large clay balls
Repair Procedures Filling Sandblasting Pressure washing Compressed air Coring Slightly larger than clay ball Partial depth core Epoxy fill
Summary Prevention Manage owner’s perception Assess extent of the problem Establish repair procedure