Construction Public Education and Stormwater Permits Outreach - PowerPoint PPT Presentation

Construction Public Education and Stormwater Permits Outreach Sponsored by STORM June 2018 How to Comply? STORM Construction Stormwater Seminar 2018 Gilbert, Arizona Presented by: Rosi Sherrill CGP How to Comply with Construction


  1. Construction Public Education and Stormwater Permits Outreach Sponsored by STORM June 2018 How to Comply?

  2. STORM Construction Stormwater Seminar 2018 Gilbert, Arizona Presented by: Rosi Sherrill

  3. CGP How to Comply with Construction Stormwater Permits:  Updates on new CGP  Applying for Coverage  Common Plan of Development  Opting Out

  4. Updates on New CGP Area of Modification Existing Permit Proposed New Permit Overall Too long, redundant explanations/details (40 pages) Less redundancy, clearer explanations (23 pages) Provides calculation methods and requirements for myDeq does the calculation and if applicable, offers this Erosivity Waiver applicability option to the permittee at the time of NOI submission CGP Crosswalk: 2013 v. 2018 Multiple operators were allowed to submit for coverage. Responsibilities of Operators In some instances, this allowed for compliance issues as The owner of the project is considered the permittee there was no "one" responsible party. Changes to the information in order to meet current myDEQ and EPA e-reporting requirements; receiving Submission of NOI Information including name, project type, etc. waters and latitude/longitude of any outfalls are new requirements ADEQ Acceptance of NOI with no Human review, typically 1-2 days myDEQ review automatic Discharge to an Impaired/OAW ADEQ Acceptance of NOI with myDEQ review + human review of SWPPP, same time Human review + SWPPP review, typically 7-15 days Discharge to an Impaired/OAW frame Not-attaining Waters Not specifically addressed Added to all references of Impaired/OAW as applicable Requirement to Post Notice of Line item in SWPPP section Moved up and given its own section Permit Coverage Termination of Coverage Minor changes related to myDEQ Modelled after EPA's ELG Final Rule for Construction, May Effluent Limitations and SWQS (12) pages of control measures with redundant detail 5, 2014 and EPA CGP 2/14/2017. Reduced to (5) pages. Will provide additional detail if necessary in Fact Sheet. Routine Inspections Every 7 days Every 14 days Only impaired/not-attaining for sediment will be Impaired waters were monitored for the pollutant causing monitored; OAW will still be monitored for sediment. Stormwater Monitoring the impairment; OAWs were monitored for sediment. Any Only have to submit SWPPP for direct discharge to OAW discharge within 1/4 mile had to submit SWPPP. or impaired for SSC.

  5. Applying for Coverage

  6. Common Plan of Development

  7. Opting Out  No Discharge Certification – Similar to a No Exposure Certification on MSGP projects – No fees at this time – No estimated availability date at this time

  8. Rosi Sherrill 602-771-4409 LS7@azdeq.gov THANK YOU!

  9. Municipal Codes and Enforcement Cities are required to adopt and Cities apply for coverage under implement local ordinances or an MS4 permit to discharge other regulatory mechanisms stormwater (NOI) and may that provide adequate terminate coverage (NOT) enforcement procedures to control discharges into the MS4

  10. • At a minimum – prohibit connections, control spills, prohibit disposal of materials, require compliance with ordinances (permits, contracts, Municipal orders)… • Require owners/operators of construction Codes and activities to minimize the discharge of Enforcement pollutants to the MS4 through the installation, implementation, and maintenance of stormwater control measures…

  11. • Construction Activity Stormwater Runoff Control • Minimize or eliminate pollutant discharges to the MS4s Municipal • Require sediment and erosion control • Maintain inventory of activities Codes and • Document inspections and enforcement Enforcement • Have written procedures for site plan review • Train staff • Provide education to construction activity operators

  12. • To the extent allowable under State law have Municipal methods to enter private property to inspect for compliance, and Codes and • Require violators to cease and desist, clean up, Enforcement or abate unlawful discharge • Or be cited with civil or criminal sanction

  13. • Provide departments, roles, responsibilities and keep an up-to-date org chart Municipal • Including local administrative and legal Codes and procedures Enforcement …and to provide a plan on how it will exercise its legal authority

  14. • Some municipalities have a shop of one; some, have 10, 50, 70 Municipal • In a smaller city, everything may be managed by Codes and Public Works or Streets • In another, it could be Planning and Enforcement Development • In all cases, there is an interested public

  15. • Each member city has provided information to that end Municipal • With the roll out of a new State construction Codes and permit, processes are likely to change slightly in the municipal world Enforcement • Spreadsheet will be managed on STORM’s website

  16. Have at least one per project or site Include all potential sources of pollution Pollution Describe and ensure implementation of control measures Prevention Identify the responsible person for on-site Plans implementation Sign (by appropriate person) SWPPP template and/or CGP Checklist http://azdeq.gov/AZPDES/SWPPP

  17. Who will be doing the identified work What types of activities will commence Pollution When will the project start and Prevention stop; what hours and which days Plans Where will runoff go, if it happens to rain (SITE MAP!) How will the potential pollutants be minimized in discharges

  18. Who is • Day-to-Day doing • Oversight the • Finances Pollution work Prevention When Plans • During a normally dry will period • During monsoons work • On weekends, at night occur

  19. • Activity (clearing/grubbing vegetation, grading, excavating, stockpiling soil) Pollutant • Equipment (simply driving over dirt, parking vehicles) Sources • Storage and disposal areas • Concrete and asphalt Pollution Prevention Plans • Dirt • Oil/grease Pollutants • Lime • pH • Trash

  20. • Municipal streets Runoff • Master planned community Path • Wash or river • Basin Pollution Prevention Plans • Limit exposure Minimize • Perimeter control Pollutants • Schedule • Clean up

  21. Is this a SWPPP?

  22. Oversight, Implementation, Updates Inspect Document Revise Report

  23. Oversight/SWPPP Management • Inspect • Routine • Rain event • Complaint

  24. Oversight/SWPPP Management • Document • Use a form • Sign the form • Retain the form

  25. Oversight/SWPPP Management • Revise • Update the SWPPP • Line through and date • Fill in the revision log • Communicate the change

  26. Oversight/SWPPP Management • Report • Exceedances • Corrective Actions • Submit sampling forms, if applicable

  27. Oversight/SWPPP Management WHO DOES THIS?

  28. SCHEDULING HOUSEKEEPING Control CONTROLLING EROSION Measures CONTROLLING SEDIMENT TRAINING

  29. SCHEDULING Waive coverage Control Measures Plan around monsoon Complete stabilization ASAP

  30. SCHEDULING Control Measures

  31. HOUSEKEEPING Keep the site clean Control Clean up spills Measures Use secondary containment Elevate product on pallets

  32. HOUSEKEEPING Control Measures

  33. EROSION CONTROL Minimize exposure Control Manage flow volume Measures Dampen flow velocity Prevent run-on

  34. EROSION CONTROL Control Measures

  35. SEDIMENT CONTROL Install basins and traps Control Deploy silt fence or wattle Measures Use check dams Utilize flocculants

  36. SEDIMENT CONTROL Control Measures

  37. TRAINING You’re here! Control Measures Qualified to know Local opportunities

  38. TRAINING Control Measures

  39. Wattle Silt fence Check Dam Seeding BMPs Blankets or Mulch Basin or Trap Flocculants Mechanical Separation Device

  40. Wattle BMPs

  41. Wattle Install on contour Embed Stake Maintain

  42. Silt Fence BMPs

  43. Silt Fence Trench Mesh side contact Ends overlap Maintain

  44. Check Dam BMPs

  45. Check Dam Angular rock Side slopes Weir Maintain

  46. Seeding BMPs

  47. Seeding Mobilization Complete cover Establishment Final Stabilization

  48. Blanket/Mulch BMPs

  49. Blankets/Mulch Protects underlying soil Complete cover Maintain

  50. Basin/Trap BMPs

  51. Basins/Traps Store runoff Settle sediment Temporary or permanent Maintain

  52. Flocculants BMPs

  53. Flocculants Adhere to particle Settle sediment Must disclose in SWPPP Not common in Az for stormwater application

  54. Mechanical Separation BMPs Device

  55. Mechanical Device More than average use Permanent control Underground Used for post-construction stormwater runoff (if one of these is in the plans, include in SWPPP; after construction complete, clean out, turn over to owner!)

  56. Good, , Bad, , Ugly • Pictures of each

  57. Good, , Bad, , Ugly

  58. Good, , Bad, , Ugly

  59. Good, , Bad, , Ugly

  60. Good, , Bad, , Ugly

  61. Good, , Bad, , Ugly

  62. USEPA 2017 Guide to develop a construction SWPPP

  63. Thank Thank you for attending! Visit Visit www.azstorm.org Closing and Survey Provide Provide input via paper (today!) Contact Contact storm.arizona@gmail.com