communication based train control
play

Communication Based Train Control Enhanced GPS Integrated - PowerPoint PPT Presentation

Connected Vehicles (CV) and Ultrawideband (UWB) for Location and Communication Based Train Control Enhanced GPS Integrated Standards Based Ultra-wideband Wireless Lighting Many Vendors CV/UWB Enhanced GPS vs UWB on 6 th Ave Non-proprietary


  1. Connected Vehicles (CV) and Ultrawideband (UWB) for Location and Communication Based Train Control Enhanced GPS Integrated Standards Based Ultra-wideband Wireless Lighting Many Vendors CV/UWB Enhanced GPS vs UWB on 6 th Ave Non-proprietary Rapid Deployment Low Cost Phase 2 Phase 1 Vital Non-vital Advanced CBTC/PTC Cab Signaling

  2. CBTC and Cab Signaling Existing/New CBTC Zone Controller or Signals Field End Point UWB Wayside UWB Wayside High accuracy Transponder in Transponder in Up/Down Stream Existing Lighting Existing Lighting low la lo latency Location Data Co-location Co-location DSRC/CV Radio UWB Wayside Unit Train to Wayside Communiction (Location/Signal-Switch Indications) a t i o n s n C o m m u n i c T r a i n t o T r a i Total Situational On-board Equipment (OBE) CV/UWB On-board Unit & Antenna Awareness Speed VOBC Door Emergency Controllerer Brake Advanced Cab Signaling Maintenance Display Bus

  3. Core Signaling Benefits • Train Spacing • Safety – Total Situational Awareness • Compatibility • Cost • Reliability & Resiliency • Power & Space Constraints • Installation Time Public Benefits by 2020 • Onboard WiFi • Safer efficient advanced cab signaling Public Benefits by 2024 • Safer automated control • Trespasser detection • More frequent service

  4. Other Benefits from CV & Total Situational Awareness Just to name a few Drone Inspection Right-of-way Yard & Non-revenue and Maintenance Worker protection Equipment tracking Phase 1 Precision asset Public Onboard WiFi Trespasser Detection management and tracking

  5. Challenges and Costs • Challenges • Dealing with signaling vendors – minimal in Phase 1 only • Dealing with train car vendors – minimal in Phase 2 only • Vital safety certification of new technology • Costs • Phase 1 - $100M - $200M – Communications deployment and Cab signaling • Phase 2 - $100M - $200M – Full CBTC deployment • Compare to $20 billion cost for current CBTC technologies • Low life cycle maintenance costs Biggest saving comes with easy installation in existing lighting during normal maintenance cycles. No major track outages for in track work and wiring.

Recommend


More recommend