CATEEL WASH Status Report February 21, 2013
Current Status: WATER WATER STATIONS (Water Treatment Facilities) o ICRC pulled out (1) Filtration Unit in Brgy. Poblacion o Maynilad Filtration unit functioning for 4 hours/ day in Brgy. Abejod WATER TRUCKING CRS: 1truck with 6000liters to San Vicente, San Miguel, Papag EC (Tina), Alegria (Sitio o Yahuno, Limao) until March 14, 2013 PRC: water source from Baganga to other barangays in Cateel o WATER KIT (Jerry Can) – gaps in Poblacion will be filled by CRS and DOH REHABILITATION of Small Scale Water system (on-going) o Hand pumps in Mainit, Aragon (Plan and HRC) o Repair intake box in Taytayan and San Alfonso (Plan) o Hand pumps in San Miguel and San Vicente (CRS)
On-going activities • Construction of Semi-permanent latrines by CRS, HRC, and Plan in covered barangays (16) • Conducted KAP surveys in CRS, HRC and Plan covered barangays (16) • Hygiene promotion sessions • Capability building (HP Training) to municipal and barangay health volunteers • Water quality monitoring for communal water sources (CRS, HRC, RHU)
Others On-going inventory of supplies by DOH • Planned latrine repair kit distribution to 9 barangays (CRS) • Mortality and m orbidity m onitoring by CHV (HRC) • Com m unity-based and Hygiene prom otion in schools (CRS and Plan) • Water quality m onitoring by CHV (all barangays) • STANDARDIZED LABOR RATE (Construction) as agreed by the • cluster (Except for Plan w ith P281 fixed rate) Labor P250 Skilled P300
Issues Desludging (c/ o HRC) • o Emergency latrines in need for desludging in the coming months but there is no identified dump site/ sanitary land fill o Option: Sludge treatment (on-site?) o Request: for RSI to present the situation to the Mayor to provide/ identify land fill Solid Waste Management • o Incomplete debris clean-up, need to identify dump site and waste management system (dumping and collection) o Open defecation in Purok Madre de Cacao, Poblacion
Issues WHAT ARE THE PLANS OF THE LGU??? •
Recommend
More recommend