NATURAL HAZARDS PILOT INITIATIVE Capital Program State of Oregon DEPARTMENT OF ADMINISTRATIVE SERVICES CHIEF FINANCIAL OFFICE | FACILITIES PLANNING UNIT
Overview BEING RESILIENT ASSESSING HAZARDS BEING PREPARED RECOVERING QUICKLY + k Q FLOODING ï LANDSLIDE $ EARTHQUAKE ANALYSIS FIRE PLANNING MITIGATION LIVES SAVED PREPARATION COMMUNITIES RESTORED TSUNAMI EDUCATION ECONOMIES REBOUND
Overview NATURAL HAZARDS PILOT INITIATIVE SEISMIC AND FLOOD ANALYSIS 111 E BUILDINGS AGENCY-UNIVERSITY PARTNERSHIP DAS + DOGAMI + PORTLAND STATE UNIVERSITY I FEMA RAPID VISUAL SCREENING I PROTECTION OF CULTURAL ASSETS I CONTINUITY OF GOVERNMENT BENEFIT/COST ANALYSIS TOOL RISK PRIORITIZATION LIST G E O L O F O G Y T A N N E D M T M I R N A E P R E A D L N I O N G D E U R S O T R E I S 1 9 3 7 TARGETED MITIGATION PROGRAM GOVERNOR'S RESILIENCE CABINET + INTERAGENCY HAZARD MITIGATION TEAM
STATE OF OREGON Phase 1 Application — Oregon Rural Resilience Incubator U.S. Department of Housing and Urban Development National Disaster Resilience Competition (HUD NDRC) Department of Administrative Services | Chief Financial Offjce | Facilities Planning Unit For more on this application, see Governor’s Offjce link at: www.oregon.gov/gov/Pages/HUD_NRDC_APPLICATION.aspx
Brookings Tidal Event Detail
Reedsport Barrier Gaps Areas in blue are below 11 feet in elevation, slightly above the currently projected height of a 100-year flood event. The red line shows the levee and high land that would protect low-lying areas from inundation. . .
Reedsport Barrier Gaps Areas in blue are below 13 feet in elevation, slightly above the projected height of a 100-year flood event in 2050. Gaps appear in the protective barrier (red line) exposing low-lying areas to potential inundation. .
Reedsport Barrier Gaps Areas in blue are below 15 feet in elevation, slightly below the projected height of a 100-year flood event in 2100. Large gaps appear in the protective barrier (red line) exposing low-lying areas to potential inundation. .
Oregon Rural Resilience Incubator
Possible Reedsport Projects • Flood Protection (including levee accreditation and certifjcation) • Mitigate levee defjciencies, pumps stations, retention structures • Loop trail • Buy outs • Transportation Reliability • Design of Scholfjeld Creek Bridge • Co-located water pipe • Improve water and medical security • New city reservoir • Transmission pipes • Shut off valves
Possible Brookings Projects • Sewer collection system • Overfmows during storms (HUD unmet needs) • Port of Brookings Master Plan • Boat lift, docks, and piles (HUD unmet needs) • Water System Protection • New water intake, intertie and reservoir restoration • Desalinization plant • Emergency Room at the Curry Health District clinic • Transportation Reliability • Mitigate US 101 Chetco Bridge • Mitigate co-located waste water pipe
Possible Brookings Projects (Cont’d) • Coastal Bluff Stability Implementation for 5 Homes • Energy Reliability • Mitigate transmission lines • Biomass power plant
Challenges • Compressed timeframe • Project team under-staffed • No Oregon CDBG Disaster baseline data • Eligibility criteria • HUD “clarifjcations”
Project Team • Phase 1 Project Leaders • Heidi Moawad, Governor’s Offjce • Alice Wiewel, Yumei Wang, DAS • Core Project Team • Governor’s Resilience Cabinet • DAS, Regional Solutions, OEM, OBDD, DLCD • City of Brookings • City of Reedsport • ICF International
Next Steps • Ongoing: Assemble Phase 2 Project Team and resources • June 2015: HUD notifjes winners of Phase 1 • October 2015: Phase 2 application due to HUD (120 days) • December 2015: HUD notifjes winners of Phase 2 • Project Completion: December 31, 2018