  1. EUROPEAN PLASMA RESEARCH ACCELERATOR WITH EXCELLENCE IN Calendar Management towards APPLICATIONS CDR Completion Maria Weikum 10 th Steering Committee Meeting 11.06.2018 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 653782.

  2. Upcomin ing EuPRAXIA Dates - 2018 2018 Horizon 2020 4.7.2018 9:00 – 5.7.2018 18:00 3rd Collaboration Week Liverpool, UK fix (+ Special Steering Meeting) tbc 6.7.2018 LIVERPOOL Symposium Liverpool, UK fix 13.9.2018 9:00 – 12:00 11th Steering Meeting DESY/remote tbc 19.11.2018 14:00 – 22.11.2018 3rd Annual Meeting INFN Frascati, Italy fix 18:00 3rd Collaboration Board Meeting SAC 4th Collaboration Week 14.12.2018 9:00 – 12:00 12th Steering Meeting DESY/remote tbd M. Weikum – 10 th Steering Committee Meeting 11.06.2018 2

  3. Upcomin ing EuPRAXIA Dates - 2019 2019 Horizon 2020 25.2.2019 14:00 - 1.3.2019 14:00 5th Collaboration Week German Alps fix 25.2.2019 13:30-15:30 13th Steering Meeting DESY/remote tbc 19.6.2019 9:00 – 12:00 14th Steering Meeting DESY/remote tbc 2.9.2019 12:00 – 6.9.2019 14:00 6th Collaboration Week DESY, Germany tbd 4th Annual Meeting 4th Collaboration Board Meeting 2.9.2019 9:00-12:00 15th Steering Meeting DESY/remote tbc 29.10.2019 9:00 - 31.10.2019 Final meeting DESY, Germany tbd 16:00 M. Weikum – 10 th Steering Committee Meeting 11.06.2018 3

  4. Dates Towards CDR Completion Horizon 2020 M 1.2 Report: Outline CDR & Contributions Defined 30.06.2018 ESFRI Roadmap Application – first draft 31.12.2018 Input to pre-construction R&D activities received 31.12.2018 Input to site studies received 31.01.2019 CDR contributions – first draft Jan 2019 5th Collaboration Week (Retreat in the Alps) 25.02. – 01.03.2019 M 1.3 Report: Draft Contributions for the CDR Received 30.04.2019 First revision of CDR draft version mid-May to mid-July 2019 Second revision of CDR draft version mid-July to end-August 2019 Final CDR draft 30.09.2019 D 1.7 Report: Final Design Report 30.10.2019 M. Weikum – 10 th Steering Committee Meeting 11.06.2018 4

  5. Dates Towards CDR Completion Horizon 2020 M 1.2 Report: Outline CDR & Contributions Defined 30.06.2018 ESFRI Roadmap Application – first draft 31.12.2018 Input to pre-construction R&D activities received 31.12.2018 Input to site studies received 31.01.2019 CDR contributions – first draft Jan 2019 5th Collaboration Week (Retreat in the Alps) 25.02. – 01.03.2019 M 1.3 Report: Draft Contributions for the CDR Received 30.04.2019 First revision of CDR draft version mid-May to mid-July 2019 Second revision of CDR draft version mid-July to end-August 2019 Final CDR draft 30.09.2019 D 1.7 Report: Final Design Report 30.10.2019 M. Weikum – 10 th Steering Committee Meeting 11.06.2018 5

  6. Dates Towards CDR Completion Horizon 2020 M 1.2 Report: Outline CDR & Contributions Defined 30.06.2018 ESFRI Roadmap Application – first draft 31.12.2018 Input to pre-construction R&D activities received 31.12.2018 Input to site studies received 31.01.2019 CDR contributions – first draft Jan 2019 5th Collaboration Week (Retreat in the Alps) 25.02. – 01.03.2019 M 1.3 Report: Draft Contributions for the CDR Received 30.04.2019 First revision of CDR draft version mid-May to mid-July 2019 Second revision of CDR draft version mid-July to end-August 2019 Final CDR draft 30.09.2019 D 1.7 Report: Final Design Report 30.10.2019 M. Weikum – 10 th Steering Committee Meeting 11.06.2018 6

  7. Dates Towards CDR Completion Horizon 2020 M 1.2 Report: Outline CDR & Contributions Defined 30.06.2018 ESFRI Roadmap Application – first draft 31.12.2018 Input to pre-construction R&D activities received 31.12.2018 Input to site studies received 31.01.2019 CDR contributions – first draft Jan 2019 5th Collaboration Week (Retreat in the Alps) 25.02. – 01.03.2019 M 1.3 Report: Draft Contributions for the CDR Received 30.04.2019 First revision of CDR draft version mid-May to mid-July 2019 Second revision of CDR draft version mid-July to end-August 2019 Final CDR draft 30.09.2019 D 1.7 Report: Final Design Report 30.10.2019 M. Weikum – 10 th Steering Committee Meeting 11.06.2018 7

  8. Dates Towards CDR Completion Horizon 2020 M 1.2 Report: Outline CDR & Contributions Defined 30.06.2018 ESFRI Roadmap Application – first draft 31.12.2018 Input to pre-construction R&D activities received 31.12.2018 Input to site studies received 31.01.2019 CDR contributions – first draft Jan 2019 5th Collaboration Week (Retreat in the Alps) 25.02. – 01.03.2019 M 1.3 Report: Draft Contributions for the CDR Received 30.04.2019 First revision of CDR draft version mid-May to mid-July 2019 Second revision of CDR draft version mid-July to end-August 2019 Final CDR draft 30.09.2019 D 1.7 Report: Final Design Report 30.10.2019 M. Weikum – 10 th Steering Committee Meeting 11.06.2018 8

  9. CDR Editorial l Teams (1 (1) Horizon 2020 CDR Chapter Titles Editorial Team Responsible for Chapter Output Main WPs Involved 1 List of Authors & Contributors P.A. Walker, M. Weikum / 2 Executive Summary R. Assmann, P. A. Walker, M. Weikum / 3 Introduction R. Assmann, A. Specka, P. A. Walker, M. Weikum WP1 4 Scientific Case Study_____________________________________________________________________________________________________________________________________________________________ 4.1 Flagship Science Goals R. Assmann, A. Specka, P. A. Walker, M. Weikum WP1 4.2 Need for External Users M.-E. Couprie, A. Specka, P. A. Walker, M. Weikum WP6, WP7, WP1, WP4 4.3 User Access M.-E. Couprie, A. Specka, P. A. Walker, M. Weikum WP6, WP7, WP1 4.4 Added Value for European Research and Technology Landscape R. Assmann, A. Specka, P. A. Walker, M. Weikum WP1 4.5 Scientific Background R. Assmann, R. Torres, C. Welsch, P. A. Walker, M. Weikum WP1, WP8 5 EuPRAXIA Conceptual Design__________________________________________________________________________________________________________________________________________________ 5.1 Performance Goals R. Assmann, A. Specka, P. A. Walker, M. Weikum WP1 5.2 Overall Facility Layout and Major Parts R. Assmann, A. Specka, P. A. Walker, M. Weikum WP1 5.3 Laser Technology L. Gizzi, F. Mathieu, P. A. Walker, M. Weikum WP4 5.4 RF Technology A. Chance, E. Chiadroni, P. A. Walker, M. Weikum WP5, WP9 5.5 Electron Injector B. Cros, P. Nghiem, P. A. Walker, M. Weikum WP2, WP3, WP5, WP14 5.6 Electron Accelerator to 1 GeV B. Cros, P. Nghiem, P. A. Walker, M. Weikum WP2, WP3, WP5, WP14 5.7 Electron Accelerator to 5 GeV B. Cros, P. Nghiem, P. A. Walker, M. Weikum WP2, WP3, WP5, WP14 5.8 Beam Transport and Handling Systems for the 1 GeV Beam A. Chance, E. Chiadroni, P. A. Walker, M. Weikum WP5 5.9 Beam Transport and Handling Systems for the 5 GeV Beam A. Chance, E. Chiadroni, P. A. Walker, M. Weikum WP5 5.10 Beam Diagnostics and Electron-Based Feedbacks A. Chance, E. Chiadroni, P. A. Walker, M. Weikum WP5 5.11 Beam Distribution Concept M.-E. Couprie, G. Dattoli, F. Nguyen, A. Specka, P. A. Walker, M. Weikum WP6, WP7 5.12 FEL and Photon Science Facility M.-E. Couprie, G. Dattoli, F. Nguyen, P. A. Walker, M. Weikum WP6, WP11 5.13 HOPA Science Facility A. Specka, R. Walczak, P. A. Walker, M. Weikum WP7 5.14 EuPRAXIA operational model R. Assmann, A. Specka, P. A. Walker, M. Weikum WP1 5.15 Environmental impact R. Assmann, A. Specka, P. A. Walker, M. Weikum WP1 5.16 Safety aspects R. Assmann, A. Specka, P. A. Walker, M. Weikum WP1, WP4 5.17 Project Risk Assessment R. Assmann, G. Dattoli, A. Specka, P. A. Walker, M. Weikum WP1 5.18 Tables of Parameters and Technical Data P. A. Walker, M. Weikum / 5.19 Impact assessment R. Assmann, A. Specka, P. A. Walker, M. Weikum WP1 M. Weikum – 10 th Steering Committee Meeting 11.06.2018 9