BIDDERS’ CONFERENCE IT -3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity Site Visits January 14th-15th 2014 Handling Engineering Group 2
Visit Schedule - January 14 th Bonfanti / Meloni Brunnhuber / Brun-Mech + + J.P. Granchelli / H. Lourenço / O. Boettcher / G. Roche / A. Kertesz R. Rinaldesi 14.30 – 16.00 PR712 in building SD4 PR68, PR76 and PR82 in Meyrin 16.30 – 18.00 PR68, PR76 and PR82 in Meyrin PR712 in building SD4 January 14th-15th 2014 Handling Engineering Group 3
Visit Schedule - January 14 th Crane PR Building Location / extent of visit Installation type Surface hall, access on cranes for A PR712 SD4 Building with space constraints inspection Surface hall, no access on crane C PR68 167 Building without space constraints foreseen Surface hall, no access on crane B PR76 201 Building with space constraints foreseen Surface hall, no access on crane E PR82 168 Building with space constraints foreseen January 14th-15th 2014 Handling Engineering Group 4
Visit Schedule - January 15 th Bonfanti / Meloni Brunnhuber / Brun-Mech + + J.P. Granchelli / H. Lourenço / O. Boettcher / A. Kertesz / G. Roche R. Rinaldesi 9.00 – 10.00 PR720 in cavern UX85 PR725 in building SX8 10.30 – 11.30 PR725 in building SX8 PR720 in cavern UX85 January 14th-15th 2014 Handling Engineering Group 5
Visit Schedule - January 15 th Crane PR Building Location / extent of visit Installation type Cavern crane, no access on crane D PR720 UX85 Underground areas foreseen Surface hall, access on cranes for F PR725 SX8 Building without space constraints inspection January 14th-15th 2014 Handling Engineering Group 6
Hazards Access to railways and cranes at ~10 from • the ground • Underground areas Access to radiation areas • January 14th-15th 2014 Handling Engineering Group 7
Measures Personal Protective Equipment: safety • shoes, helmet • Fall-arrest harness (with lanyard) • Dosimeters (escort only) All visitors shall be authorized by their • employer to work in height and use a harness All visitors shall be authorized by their • employer to work in radioactive areas January 14th-15th 2014 Handling Engineering Group 8
Recommend
More recommend